Infrastructure Planning
The A122 (Lower Thames Crossing) Development Consent Order 2025
An application has been made to the Secretary of State, under section 37 of the Planning Act 20081 (“the 2008 Act”) in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 20092 for an Order granting development consent.
The application was examined by a Panel of five members (“the Panel”) in accordance with Chapter 4 of Part 6 of the 2008 Act, and the Infrastructure Planning (Examination Procedure) Rules 20103.
The Panel, having examined the application with the documents that accompanies the application, and considered the representations made and not withdrawn, in accordance with section 74(2) of the 2008 Act, has submitted a report and recommendation to the Secretary of State.
The Secretary of State, having considered the representations made and not withdrawn, and the report of the Panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
The Secretary of State is satisfied that replacement land (as defined in article 40(8) (special category land) of this Order) has been or will be given in exchange for parcels of common land and open space (both terms as defined in section 19(4) of the Acquisition of Land Act 19814) comprised within the Order land, and the replacement land has been or will be vested in the prospective seller and subject to the same rights, trusts and incidents as attach to that common land and open space, and that, accordingly, sections 131(4) and 132(4) of the 2008 Act apply.
The Secretary of State is satisfied that parcels of open space comprised within the Order land are required for the drainage of an existing highway and that the giving in exchange of other land is unnecessary, whether in the interests of the persons, if any, entitled to rights of common or other rights or in the interests of the public, and accordingly, section 131(5) of the 2008 Act applies.
In accordance with section 132(3) of the 2008 Act, the Secretary of State is satisfied, having considered the report and recommendation of the Panel, that the parcels of open space and common land comprised within the Order land, when burdened with a new right created under this Order, will be no less advantageous than they were before the making of this Order to the following persons: (a) the persons in whom they are vested; (b) other persons, if any, entitled to rights of common or other rights; and (c) the public.
PART 1 PRELIMINARY¶
I11 Citation and commencement¶
This Order may be cited as the A122 (Lower Thames Crossing) Development Consent Order 2025 and comes into force on 15th April 2025.I22 Interpretation¶
- “the 1825 Act” means an Act for dividing and inclosing, and reducing to a Stint and improving certain unenclosed Commons and Waste Grounds and Fens, within the Manor and Parish of Orsett in the County of Essex18
- “the 1961 Act” means the Land Compensation Act 196119;
- “the 1965 Act” means the Compulsory Purchase Act 196520;
- “the 1968 Act” means the Port of London Act 196821;
- “the 1980 Act” means the Highways Act 198022;
- “the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 198123;
- “the 1984 Act” means the Road Traffic Regulation Act 198424;
- “the 1990 Act” means the Town and Country Planning Act 199025;
- “the 1991 Act” means the New Roads and Street Works Act 199126;
- “the 2000 Act” means the Transport Act 200027;
- “the 2004 Act” means the Traffic Management Act 200428;
- “the 2008 Act” means the Planning Act 2008;
- “the 2017 Regulations” means the Compulsory Purchase of Land (Vesting Declarations) (England) Regulations 201729;
- “access” includes passing and repassing with or without plant and vehicles and accessing land in the Order land from streets or other parts of Order land;
- “address” includes any number or address for the purpose of electronic transmission;
- “affected person” has the same meaning as in section 59(4) (notice of persons interested in land to which compulsory acquisition request relates) of the 2008 Act;
- “apparatus” has the same meaning as in Part 3 (street works in England and Wales) of the 1991 Act;
- “authorised development” means the development described in Part 1 (authorised works) of Schedule 1 (authorised development) and any other development authorised by this Order, or any part of it, which is development within the meaning of section 32 (meaning of “development”) of the 2008 Act;
- “authorised person” means–
- a person acting in the course of that person’s duties who—
- is an employee, agent, contractor or sub-contractor of the undertaker; or
- is authorised by the undertaker to exercise one or more of its functions under this Order; or
- a person acting in the execution of that person’s duties in the tunnel, who is—
- a constable;
- a Police Community Support Officer;
- an officer of the Driver and Vehicle Standards Agency;
- an officer of the Health and Safety Executive;
- a person authorised for the purposes of section 44 (powers of fire-fighters etc in an emergency etc)30 of the Fire and Rescue Services Act 2004;
- a person accredited by or under section 41 (accreditation under community safety accreditation schemes)31 of the Police Reform Act 2002; or
- a traffic officer.
- “begin” means beginning to carry out any material operation (as defined in section 56(4) (time when development begun) of the 1990 Act) forming part of the authorised development including preliminary works (as defined in Schedule 2 to this Order), and “begun” and “beginning” are to be construed accordingly;
- “the book of reference” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the book of reference for the purposes of this Order;
- “bridleway” has the same meaning as in section 329(1) (further provision as to interpretation) of the 1980 Act;
- “building” includes any structure or erection or any part of a building, structure or erection;
- “business day” means a day other than Saturday or Sunday which is not Christmas Day, Good Friday or a bank holiday under section 1 (bank holidays)32 of the Banking and Financial Dealings Act 1971;
- “carriageway” has the same meaning as in section 329(1) of the 1980 Act;
- “the classification of roads plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the classification of roads plan for the purposes of this Order;
- “the Crown land plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the Crown land plans for the purposes of this Order;
- “cycle track” has the same meaning as in section 329(1)33 of the 1980 Act;
- “electronic transmission” means a communication transmitted—
- by means of an electronic communications network; or
- by other means but while in electronic form;
- “the engineering drawings and sections” means the document of that description listed in Schedule 16 certified by the Secretary of State as the engineering drawings and sections for the purposes of this Order;
- “environmental statement” means—
- the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the environmental statement for the purposes of this Order; and
- the environmental statement addendum listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the environmental statement addendum for the purposes of this Order;
- “flood risk activity” has the same meaning as in regulation 2 (interpretation: general) of the Environmental Permitting (England and Wales) Regulations 201635;
- “footway” and “footpath” have the same meaning as in section 329(1) of the 1980 Act;
- “highway” has the same meaning as in section 328(1) (meaning of “highway”) of the 1980 Act;
- “highway authority” and “local highway authority” (respectively) have the same meaning as in sections 136 (highway authorities: general provision) and 329(1) of the 1980 Act;
- “horse-riding track” means a way constituting or comprised in a highway, being a way over which the public have the following, but no other, rights of way, that is to say on horseback or leading a horse;
- “the land plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the land plans for the purposes of this Order;
- “limits of deviation” means the limits of deviation referred to in article 6 (limits of deviation);
- “maintain” includes, in relation any part of the authorised development to, inspect, repair, adjust, alter, improve, landscape, preserve, remove, reconstruct, refurbish or replace, provided such works do not give rise to any materially new or materially different environmental effects to those identified in the environmental statement, and any derivative of “maintain” is to be construed accordingly;
- “MMO” means the Marine Management Organisation;
- “Order land” means the land shown on the land plans which is within the limits of land to be acquired permanently or used permanently or temporarily, and described in the book of reference;
- “the Order limits” means the limits of lands to be acquired permanently or used permanently or temporarily as shown on the land plans and works plans within which the authorised development may be carried out;
- “outline LEMP” means the outline landscape and ecology management plan listed in Schedule 16 (documents to be certified) and certified by the Secretary of State, and which is the first iteration of the landscape and ecology management plan;
- “overhead lines” includes associated apparatus which is installed for the purposes of its maintenance or operation;
- “owner”—
- in relation to land, has the same meaning as in section 7 (interpretation)37 of the Acquisition of Land Act 1981;
- in relation to a motor vehicle means the person in whose name a vehicle is registered under the Vehicle Excise and Registration Act 199438; and
- in relation to a vehicle which is the subject of a hiring agreement or hire-purchase agreement, includes the person entitled to possession of the vehicle under the agreement;
- “permit scheme” means any scheme made under Part 3 of the 2004 Act in force at the date on which this Order is made;
- “PLA” means the Port of London Authority;
- “relevant local highway authority” means in any given provision of this Order, the highway authority for the area to which the provision relates;
- “relevant planning authority” means in any given provision of this Order, the planning authority for the area to which the provision relates;
- “relevant traffic authority” means in any given provision of this Order, the traffic authority for the area to which the provision relates;
- “rights of way and access plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the rights of way and access plans for the purposes of this Order;
- “river restrictions plan” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the river restrictions plan for the purposes of this Order;
- “SACR” mean the Stakeholder Actions and Commitments Register referred to in article 61 (SACR);
- “the special category land plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the special category land plans for the purposes of this Order;
- “special road” has the same meaning as in section 329(1)39 of the 1980 Act;
- “statutory undertaker” means any statutory undertaker for the purposes of section 127(8) (statutory undertakers’ land) of the 2008 Act;
- “street” means a street within the meaning of section 4840 (streets, street works and undertakers) of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street;
- “street authority”, in relation to a street, has the same meaning as in section 49 (the street authority and other relevant authorities) of the 1991 Act;
- “streets subject to temporary restrictions of use plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the streets subject to temporary restrictions of use plans for the purposes of this Order;
- “traffic authority” has the same meaning as in section 121A (traffic authorities)41 of the 1984 Act;
- “traffic officer” means an individual designated under section 2 (designation of traffic officers) of the 2004 Act;
- “the traffic regulation measures plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the traffic regulation measures plans for the purposes of this Order;
- “the tribunal” means the Lands Chamber of the Upper Tribunal;
- “trunk road” means a highway which is a trunk road by virtue of—
- an order or direction under section 10 of that Act; or
- an order granting development consent; or
- any other enactment;
- “the tunnel area plan” means the plan of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the tunnel area plan for the purposes of this Order;
- “the tunnel” means the tunnel to be constructed under the river Thames and shown as a solid blue line on the tunnel area plan;
- “the tunnel approaches” means the southern and northern approaches to the tunnel between the barrier gantries and the portals, the extent of which is shown by dashed blue lines on the tunnel area plan;
- “the tunnel area” means the extent of the public highway to be comprised in and along the tunnels and the tunnel approaches;
- “tunnel limits of deviation plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the tunnel limits of deviation plans for the purposes of this Order;
- “undertaker” means National Highways Limited (Company No. 09346363) whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ;
- “watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, winterbournes, sewers and passages through which water flows except a public sewer or drain; and
- “the works plans” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the works plans for the purposes of this Order.
PART 2 PRINCIPAL POWERS¶
I33 Development consent, etc. granted by the Order¶
I44 Maintenance of authorised development¶
The undertaker may at any time maintain the authorised development, except to the extent that this Order, or an agreement made under this Order, provides otherwise.I55 Maintenance of drainage works¶
I66 Limits of deviation¶
I77 Benefit of Order¶
I88 Consent to transfer benefit of Order¶
PART 3 STREETS¶
I99 Application of the 1991 Act¶
-
section 56 (power to give directions as to timing of street works)48;
-
section 56A (power to give directions as to placing of apparatus)49;
-
section 58 (restrictions on works following substantial road works)50;
-
section 58A (restriction on works following substantial street works)51;
-
section 73A (power to require undertaker to re-surface street);
-
section 73B (power to specify timing etc. of re-surfacing);
-
section 73C (materials, workmanship and standard of re-surfacing);
-
section 78A (contributions to costs of re-surfacing by undertaker); and
-
Schedule 3A (restrictions on works following substantial street works)52.
-
section 54 (advance notice of certain works)53, subject to paragraph (6);
-
section 55 (notice of starting date of works)54, subject to paragraph (6);
-
section 57 (notice of emergency works)55;
-
section 59 (general duty of street authority to co-ordinate works)56;
-
section 60 (general duty of undertakers to co-operate)57;
-
section 68 (facilities to be afforded to street authority)58;
-
section 69 (works likely to affect other apparatus in the street)59;
-
section 75 (inspection fees)60;
-
section 76 (liability for cost of temporary traffic regulation); and
-
section 77 (liability for cost of use of alternative route),
I1010 Construction and maintenance of new, altered or diverted streets and other structures¶
I1111 Access to works¶
The undertaker may, for the purposes of the authorised development, form and lay out means of access, or improve (which includes altering) existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development.I1212 Temporary closure, alteration, diversion and restriction of use of streets¶
I1313 Use of private roads for construction¶
I1414 Permanent stopping up of streets and private means of access¶
I1515 Classification of roads, etc.¶
I1616 Clearways, speed limits and prohibitions¶
- “a traffic sign which indicates that the national speed limit is in force” means a traffic sign of the type shown in diagram 671 in Part 2 (signs and road markings indicating speed limits) of Schedule 10 (signs for speed limits) to the Traffic Signs Regulations and General Directions;
- “national speed limit” has the meaning given by Schedule 1 (definitions)69 to the Traffic Signs Regulations and General Directions 2016;
- “road” includes the adjacent hard shoulder and verge;
- “speed limit sign” means a traffic sign of the type shown in diagram 670 in Part 2 of Schedule 10 or diagram 6001 in Part 2 (matrix signs and light signals for motorways and all-purpose dual carriageway roads) of Schedule 15 (matrix signs and light signals for the control of moving traffic on motorways and dual carriageway roads) to the Traffic Signs Regulations and General Directions 2016 which is—
- placed on or near a road; and
- directed at traffic on the carriageway on which the vehicle is being driven;
- “variable message sign” has the meaning given by Schedule 1 (definitions) to the Traffic Signs Regulations and General Directions 2016.
I1717 Traffic regulation – local roads¶
PART 4 SUPPLEMENTAL POWERS¶
I1818 Powers in relation to relevant navigations or watercourses¶
I1919 Discharge of water¶
I2020 Protective work to land and buildings¶
I2121 Authority to survey and investigate the land¶
I2222 Removal of human remains¶
I2323 Felling or lopping of trees and removal of hedgerows¶
I2424 Trees subject to tree preservation orders¶
PART 5 POWERS OF ACQUISITION AND POSSESSION OF LAND¶
I2525 Compulsory acquisition of land¶
I2626 Compulsory acquisition of land – incorporation of the mineral code¶
Parts 2 and 3 of Schedule 2 (minerals)81 to the Acquisition of Land Act 1981 are incorporated in this Order subject to the modifications that—I2727 Time limit for exercise of authority to acquire land compulsorily¶
I2828 Compulsory acquisition of rights and imposition of restrictive covenants¶
I2929 Private rights over land¶
I3030 Modification of Part 1 of the 1965 Act¶
I3131 Application of the 1981 Act¶
I3232 Modification of the 2017 Regulations¶
I3333 Acquisition of subsoil or airspace only¶
I3434 Rights under or over streets¶
I3535 Temporary use of land for carrying out the authorised development¶
I3636 Temporary use of land for maintaining the authorised development¶
I3737 Statutory undertakers¶
|
(1)
Specified work
|
(2)
Corresponding work
|
|---|---|
| Work No. CA2 | Work No. MUT1 (outside of Thong Lane bridge) |
| Work No. MU12 | Work No. MUT1 (so far as within Thong Lane bridge) |
| Work No. MU12 | Work No. MUT2 |
| Works Nos. CA3 and CA3A | Work No. MUT3 |
| Work No. CA5 | Work No. MUT4 |
| Work No. CA5 | Work No. MUT5 |
| Work No. CA5 | Work No. MUT6 |
| Work No. CA5 | Work No. MUT7 |
| Works Nos. CA5 and CA5A | Work No. MUT8 |
| Works Nos. CA5 and CA5A | Work No. MUT9 |
| Work No. CA5 | Work No. MUT10 |
| Work No. CA5 | Work No. MUT11 |
| Work No. CA6 | Work No. MUT12 |
| Works Nos. CA6, CA7, CA8A CA8B, CA9, CA10 and CA11 | Work No. MUT13 |
| Works Nos. CA6, CA7, CA8A CA8B, CA9, CA10 and CA11 | Work No. MUT14 |
| Work No. CA6 | Work No. MUT15 (outside of A128 Brentwood Road) |
| Work No. MU39 | Work No. MUT15 (so far as within A128 Brentwood Road) |
| Works Nos. CA8A and CA8B | Work No. MUT16 |
| Work No. CA7 | Work No. MUT17 |
| Work No. CA7 | Work No. MUT18 |
| Work No. MU45 | Work No. MUT19 |
| Work No. MU54 | Work No. MUT20 (from the A1089 to the A13) |
| Works Nos. CA8A and CA8B | Work No. MUT20 (from Long Lane to Work No CA8A to CA8B) |
| Works Nos. CA9 and CA10 | Work No. MUT21 (outside of B122 High Road, Orsett) |
| Work No. MU60 | Work No. MUT21 (so far as within B122 High Road, Orsett) |
| Work No. CA11 | Work No. MUT22 |
| Work No. CA9 | Work No. MUT23 |
| Work No. CA9 | Work No. MUT24 |
| Work No. CA11 | Work No. MUT25 |
| Work No. CA13 | Work No. MUT26 |
| Work No. CA13 | Work No. MUT27 |
| Works Nos. CA13 and CA14 | Work No. MUT28 |
| Work No. CA14 | Work No. MUT29 |
| Work No. MU76 | Work No. MUT30 |
| Work No. CA15A | Work No. MUT31 |
| Work No. CA16 | Work No. MUT32 |
| Work No. OH1 | Work No. OHT1 |
| Work No. OH4 | Work No. OHT2 |
| Work No. OH3 | Work No. OHT3 |
| Work No. OH7 | Work No. OHT4 |
| Work No. OH6 | Work No. OHT5 |
| Work No. OH6 | Work No. OHT6 |
| Work No. OH7 | Work No. OHT7 |
| Work No. OH7 | Work No. OHT8 |
I3838 Apparatus and rights of statutory undertakers in stopped up streets¶
-
“relocation works” means work executed, or apparatus provided, under paragraph (2); and
-
“statutory utility” means a statutory undertaker for the purposes of the 1980 Act or a public communications provider as defined in section 151(1) (interpretation of Chapter 1)104 of the Communications Act 2003.
I3939 Recovery of costs of new connections¶
-
“public communications provider” has the same meaning as in section 151(1) (interpretation of Chapter 1) of the Communications Act 2003; and
-
“public utility undertaker” means a gas, water, electricity or sewerage undertaker.
I4040 Special category land¶
- “the excepted land” means the land identified as—
- plot 06-15 in the book of reference and the special category land plans, being the land in respect of which the Secretary of State is satisfied that section 131(5) of the 2008 Act applies; and
- plots 03-14, 04-145, 06-03, 06-56, 07-01, 07-02, 07-04, 07-05, 07-15, 07-17, 07-20, 07-22, 07-23, 07-27, 07-28, 07-41, 08-07, 08-12, 08-13, 08-14, 08-15, 20-75, 20-76, 21-25, 23-120, 23-170, 29-03, 29-04, 33-35, 35-13, 38-55, 43-07, 43-09, 43-18, 43-19, 43-35, 44-08, 46-04, 46-26 and 47-26 in the book of reference and the special category land plans, being the land in respect of which the Secretary of State is satisfied that section 132(3) of the 2008 Act applies;
- “the Orsett Fen common land” means the land identified as plots 35-13, 35-14, 35-60, 37-01, 38-55 and 38-58 in the book of reference and the special category land plans;
- “the relevant Order powers” means the powers exercisable over the special category land by the undertaker under article 25 (compulsory acquisition of land) or article 28 (compulsory acquisition of rights and imposition of restrictive covenants);
- “the specified special category land” means the land, or any part of that land, identified as plots 03-14, 04-88, 04-144, 04-250, 04-264, 04-265, 04-274, 13-03, 20-63, 23-106, 29-02, 29-09, 29-282, 29-283, 33-18, 33-35, 35-14, 35-60, 37-01, 38-58, 43-07, 43-08, 43-09, 43-22, 43-23, 43-24, 43-25, 43-31, 43-33, 43-39, 43-106, 43-109, 43-110, 44-12, 44-51, 46-06, 46-08, 46-09, 46-11, 46-12, 46-13, 46-18 and 46-55 in the book of reference and the special category land plans, being the land in respect of which the Secretary of State is satisfied that section 131(4) or section 132(4) of the 2008 Act applies;
- “the replacement land” means the land identified as plots 03-43, 03-54, 03-85, 11-79, 13-94, 20-70, 20-78, 20-79, 23-117, 29-01, 29-12, 29-16, 29-18, 29-19, 33-04, 33-13, 34-14, 34-16, 34-18, 35-52, 35-57, 37-04, 38-62, 42-19, 42-26, 42-33, 43-04, 44-19, 46-19, 47-29, 47-32 and 47-33 in the book of reference and on the special category land plans, being the replacement for the special category land;
- “right, trusts, and incidents” means all such provisions attaching to the land, and in respect of the Tilbury Green common land, the Walton Common and Parsonage Common, and the Orsett Fen common land includes all such provisions attaching to that land contained in or having effect under the 1825 Act, the Commons Regulation (West Tilbury) Provisional Order Confirmation Act 1893107, section 193 of the Law of Property Act 1925108, and the Commons Act 2006;
- “specified person” means a person other than the undertaker for whose benefit the replacement land or rights are being acquired and includes the owner of special category land on the date of the exercise of the relevant powers or a statutory undertaker;
- “the Tilbury Green common land” means the land identified as plots 20-63, 20-75, 20-76, 23-106 and 23-120 in the book of reference and the special category land plans; and
- “the Walton Common and Parsonage Common” means the land identified as plots 21-25 and 23-170 in the book of reference and the special category land.
I4141 Disregard of certain improvements, etc.¶
I4242 Set off for enhancement in value of retained land¶
I4343 Crown rights¶
PART 6 OPERATIONS¶
I4444 Power to operate, use and close the tunnel area¶
-
“emergency” means any circumstance whether existing or imminent, which the undertaker considers is likely to cause danger to—
-
persons or property, including the tunnel area or any person in or using the tunnel area; or
-
the environment; and
-
-
“relevant local authorities” means Kent County Council, Thurrock Council, and Gravesham Borough Council.
I4545 Road user charging¶
I4646 Suspension of road user charging¶
I4747 No apparatus in the tunnel area without consent¶
Regardless of anything contained in any enactment, no person is to enter upon, breakup or interfere with the tunnel or tunnel area, or any part of it, for the purpose of placing or doing anything in or in relation to any sewer, drain, main, pipe, wire or other apparatus or executing any work except with the written consent of the undertaker and in accordance with such terms and conditions as the undertaker may determine, including as to payment, such consent not to be unreasonably withheld and any disputes as to failure to consent or over terms and conditions to be subject to the arbitration provisions in article 64 (arbitration).I4848 Protection of the tunnel area, etc.¶
- “any other activity” includes any activity which constitutes a “material operation” under section 56(4) of the 1990 Act or “works” under the 1968 Act;
- “commenced” has the same meaning as the definition of commence in Schedule 2 (requirements) to this Order;
- “the restricted first and second protection zone activities” means the following activities within the part of the river Thames that is situated within the first protection zone or second protection zone shown on the river restrictions plan—
- any dredging;
- the installation of a mooring or other structure;
- any piling activities;
- any designation of any anchorage;
- any excavations, trial holes, boreholes and other investigations; or
- any other activity which might reasonably be expected to affect the safe construction, maintenance or operation of the tunnel;
- “river works licence” means a licence granted by the PLA under section 66 (licensing of works) of the 1968 Act;
- “river dredging licence” means a licence granted by the PLA under section 73 (licensing of dredging, etc.) of the 1968 Act;
- “the exempt second protection zone activities” means the following activities within the part of the river Thames that is situated within the second protection zone shown on the river restrictions plan—
- F20any dredging provided it does not result (either during the course of the dredging or on completion of the dredging) in the surface of the bed of the river Thames lying at a depth exceeding 12.5 metres below chart datum subject to the addition of any ‘over-dredge’ of 0.5 metres where this occurs in the course of a standard dredging methodology being employed;
- F20non-intrusive ground investigations, surface sampling, vibrocoring and surveys;
- F20shallow piling activities and excavations; and
- F20where such activities either alone or together do not lead to a concurrent load of 50kPA or more on the bed of the river Thames within the Order limits—
- the use of anchorages and placing of moorings and navigational marks and the grounding of a barge for any of these purposes;
- the maintenance of groynes, mooring placements, navigational marks, scour protection, river walls and revetements and the grounding of a barge for any of these purposes;
- mooring marine plant in connection with the activities in sub-paragraphs (b) and (d)(i) and (ii).
I4949 Removal of vehicles¶
- “GB registration mark” means a registration mark issued in relation to a vehicle under the Vehicle Excise and Registration Act 1994;
- “HPI Ltd” means HPI Limited (company number 04068979), whose registered office is at Capitol House, Bond Court, Leeds, Yorkshire, England, LS1 5EZ, being a company incorporated under the Companies Act 1985 and includes its successors and assigns or any body which takes on its functions in relation to vehicle identification and registration;
- “information relating to the disposal” means, in relation to a vehicle—
- any information which is sufficient to relate the information now being given to any information previously given to the same person in respect of the removal, storage or disposal of the vehicle;
- such of the specified information as has not been previously given to the same person in respect of the removal, storage or disposal of the vehicle; and
- information as to whether the vehicle was disposed of by destruction or by sale and if by sale, the sum realised;
- F21...
- “person responsible”, in relation to a vehicle, means—
- F22the owner of the vehicle at the time when it was put in the place from which it was removed as mentioned in paragraph (1), unless the owner demonstrates that the owner was not concerned in, and did not know of, the vehicle being put in the tunnel area;
- F22any person by whom the vehicle was put in that place;
- “relevant charges” means the sums and charges prescribed by the Removal, Storage and Disposal of Vehicles (Prescribed Sums and Charges) Regulations 2008112;
- “specified information”, in relation to a vehicle, means such of the following information as can be, or could have been, ascertained from an inspection of the vehicle, or has been ascertained from any other source—
- “specified sum” means a sum calculated by deducting from the proceeds of sale the relevant charges that would have been payable had the vehicle been claimed by the owner immediately before its disposal; and
- “vehicle” means any vehicle, whether or not it is in a fit state for use on roads, and includes any chassis or body, with or without wheels, appearing to have formed part of such a vehicle, and any load carried by, and anything attached to, such a vehicle.
I5050 Removal of obstructions¶
I5151 Byelaws relating to the tunnel area¶
I5252 Fixed penalty notices relating to byelaws¶
PART 7 MISCELLANEOUS AND GENERAL¶
I5353 Disapplication of legislative provisions, etc.¶
I5454 Designation of fen land¶
-
“emergency” means any circumstance whether existing or imminent, which the undertaker considers is likely to cause danger to persons or property.
-
“Fen land A” means the land identified as Area A shown in Appendix 2 of the outline LEMP;
-
“Fen land B” means the land identified as Area B shown in Appendix 2 of the outline LEMP;
-
“specified date” means—
-
in relation to Fen land A, the later of 12 months from the date of completion of the provision of water vole mitigation on that land or 18 months from the date of completion of the provision of water vole mitigation on that land where the undertaker determines, following consultation with Natural England, that period is reasonably necessary to allow for the establishment of the water vole mitigation; and
-
in relation to Fen land B, the day after the completion of the provision of open mosaic habitat and grassland on that land.
-
I5555 Application of local legislation, etc.¶
I5656 Planning permission, etc.¶
I5757 Application of landlord and tenant law¶
I5858 Defence to proceedings in respect of statutory nuisance¶
I5959 Protection of interests¶
Schedule 14 (protective provisions) has effect.I6060 Deemed marine licence¶
The marine licence set out in Schedule 15 (deemed marine licence) is deemed to have been issued under Part 4 of the 2009 Act for the licensed activities set out in Part 1, and subject to the licence conditions set out in Part 2, of that licence.I6161 SACR¶
I6262 Certification of documents, etc.¶
I6363 Service of notices¶
I6464 Arbitration¶
I6565 Financial arrangements for the Kent Downs National Landscape¶
I6666 Power to override easements and other rights¶
I6767 No double recovery¶
Compensation will not be payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law, or under two or more articles of this Order.I6868 Interface with waste operation permits¶
- “the 2016 Regulations” means the Environmental Permitting (England and Wales) Regulations 2016147 and unless otherwise specified, expressions used in this article have the same meaning as in those Regulations;
- “authorised activity” means any works or activities authorised by this Order, works carried out in connection with the authorised development, or the exercise by the undertaker of functions conferred by this Order;
- “charging scheme” means the Environment Agency (Environmental Permitting and Abstraction Licensing) (England) Charging Scheme 2022148, and includes any subsequent amendment to that scheme or any new scheme;
- “environmental scheme” means a written scheme containing appropriate measures to ensure—
- the continued effective operation of the existing permit;
- the methods to be used to remove or separate existing waste from land subject to an existing permit or land on which an authorised activity is carried out;
- monitoring of land, air and water, equivalent to that required under existing permit and measures relating to surrender which arise as a result of an authorised activity;
- continued access arrangements, including in relation to monitoring, for the permit holder in connection with land retained by the permit holder which remains subject to the existing permit; and
- an equivalent level of environmental protection to that which would be provided by either the existing permit or permit conditions complying with Schedules 7, 9 and 10 of the Regulations; and
- “existing permit” means any environmental permit in respect of a waste operation whether granted under the 2016 Regulations (or any predecessor or substituted regulations) before or after the coming into force of this Order granted by the Environment Agency on or over the Order limits, excluding any environmental permit obtained by the undertaker.
SCHEDULES
SCHEDULE 1 ¶
AUTHORISED DEVELOPMENT
Article 2
I314PART 1 AUTHORISED WORKS¶
A nationally significant infrastructure project as defined in sections 14 (nationally significant infrastructure projects: general), 16 (electric lines)149, 20 (gas transporter pipe-lines) and 22 (highways)150 of the 2008 Act, and associated development as defined in section 115(2) (development for which development consent may be granted)151 of the 2008 Act, comprising—
Work No. 1 – as shown on sheets 3, 4, 5 and 6 of the works plans and being the construction of the new A122 Lower Thames Crossing between the existing M2 junction 1 and the new A2/A122 Lower Thames Crossing junction (Work No. 2), to include—
Work No. 2 – as shown on sheets 4, 6, 7 and 11 of the works plans and being the construction of the new A2/A122 Lower Thames Crossing junction, to include—
Work No. 3 – as shown on sheets 11, 12 and 13 of the works plans and being the construction of the new A122 Lower Thames Crossing between A2/A122 Lower Thames Crossing junction and the South Portal, to include—
Work No. 4 – as shown on sheets 13, 14, 15 and 16 of the works plans and being the construction of the new A122 Lower Thames Crossing highway bored tunnels to include—
Work No. 5 – as shown on sheets 16, 19, 20, 22, 23 and 24 of the works plans and being the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct, to include—
Work No. 6 – as shown on sheets 23, 24, 25, 27 and 28 of the works plans and being the construction of the new A122 Lower Thames Crossing between northern end of Tilbury viaduct to Brentwood Road/A13 Approach, to include—
Work No. 7 – as shown on sheets 26, 28, 29, 31, 32 and 33 of the works plans and being the construction of the new A122 Lower Thames Crossing and new A13 junction, to include—
Work No. 8 – as shown on sheets 33, 35, 38, 39, 41 and 42 of the works plans and being the construction of the new A122 Lower Thames Crossing from north of the new A13 junction to the approach of the new M25 junction, to include—
Work No. 9 – as shown on sheets 39, 40, 42, 43, 44, 45, 46, 47, 48 and 49 of the works plans and being the construction of the new A122 Lower Thames Crossing junction with M25, to include—
Utilities works – Overhead Line diversion works¶
Work No. OH1 – as shown on sheets 6, 11 and 13 of the works plans and being the overhead lines diversion works (4YN Route), to include—
Work No. OH2 – as shown on sheets 4, 10, 11, 12 and 13 of the works plans and being the removal of overhead lines, between Thong Lane over the A2 (Work No. 1H) to the A226, for 2,800 metres in length.
Work No. OH3 – as shown on sheets 20, 23 and 24 of the works plans and being the overhead lines diversion works (PEA route), to include—
Work No. OH4 – as shown on sheets 20, 23, 24 and 27 of the works plans and being the overhead lines diversion works (ZJ Route), to include—
Work No. OH5 – as shown on sheets 23, 24 and 27 of the works plans and being the overhead lines diversion works (PAB route), to include—
Work No. OH6 – as shown on sheets 24, 27, 28, 29, 33 and 34 of the works plans and being the overhead lines diversion works (YYJ route), to include—
Work No. OH7 – as shown on sheets 24, 27, 28, 29, 33, 35, 38 and 41 of the works plans and being the overhead lines diversion works (ZB route), to include—
Work No. OH8 – as shown on sheet 43 of the works plans and being the overhead lines diversion works (PB route), to include—
Utilities works – Temporary Overhead Line diversion works¶
Work No. OHT1 – as shown on sheets 6 and 11 of the works plans and being the temporary overhead lines diversion works (4YN Route), to include—
Work No. OHT2 – as shown on sheets 23 and 24 of the works plans and being the temporary overhead lines diversion works (ZJ Route), to include—
Work No. OHT3 – as shown on sheet 24 of the works plans and being the temporary overhead lines diversion works (PEA Route), to include a temporary overhead line diversion between existing pylon PEA15 and existing pylon PEA17 via temporary pylon PEA16T (to a maximum height of 39 metres) (610 metres).
Work No. OHT4 – as shown on sheets 28 and 29 of the works plans and being the temporary overhead lines diversion works (ZB Route), to include a temporary overhead line diversion between existing pylon ZB018 to existing pylon ZB020 via temporary pylon ZB019T (to a maximum height of 54 metres) (720 metres).
Work No. OHT5 – as shown on sheets 28 and 29 of the works plans and being the temporary overhead lines diversion works (YYJ Route), to include a temporary overhead line diversion between proposed new pylon YYJ118R and existing pylon YYJ120 via temporary pylon YYJ119T (to a maximum height of 54 metres) (565 metres).
Work No. OHT6 – as shown on sheet 29 of the works plans and being the temporary overhead lines diversion works (YYJ route), to include a temporary overhead line diversion between existing pylon YYJ115 to proposed new pylon YYJ116R via temporary pylon YYJ116T (to a maximum height of 54 metres) (400 metres).
Work No. OHT7 – as shown on sheet 33 of the works plans and being the temporary overhead lines diversion works (ZB Route), to include a temporary overhead line diversion between existing pylon ZB025 to existing pylon ZB027 via temporary pylon ZB026T (to a maximum height of 50 metres) (685 metres).
Work No. OHT8 – as shown on sheet 38 of the works plans and being the temporary overhead lines diversion works (ZB Route), to include a temporary overhead line diversion between existing pylon ZB032 to existing pylon ZB034 via temporary pylon ZB033T (to a maximum height of 64 metres) (700 metres).
Utilities works – Gas pipeline works¶
Work No. G1a – as shown on sheets 3 and 4 of the works plans and being the installation of a medium-pressure gas pipeline commencing at a point situated north of Park Pale and terminating east of the new Thong Lane bridge over the A2 (Work No. 1H) and south of the Inn on the Lake, for 2,400 metres in length.
Work No. G1b – as shown on sheets 4, 6 and 11 of the works plans and being the installation of a medium-pressure gas pipeline commencing at a point situated south of the Inn on the Lane and terminating east of Gravesend East junction, for 2,916 metres in length.
Work No. G2 – as shown on sheet 6 of the works plans and being the installation of a high-pressure gas pipeline situated south of Claylane Wood, for 120 metres in length.
Work No. G3 – as shown on sheets 6 and 11 of the works plans and being the installation of a high-pressure gas pipeline commencing at a point situated south of Claylane Wood heading north along the western side of the new A122 Lower Thames Crossing (Work No. 3A) and terminating north of Shorne Ifield Road, for 1,615 metres in length.
Work No. G4 – as shown on sheets 11 and 13 of the works plans and being the installation of a high-pressure gas pipeline commencing at a point north-east of Claylane Wood passing under the new A122 Lower Thames Crossing (Work No. 3A) and terminating south of A226, for 2,676 metres in length.
Work No. G5 – as shown on sheet 28 of the works plans and being the installation of a high-pressure gas pipeline situated east of the realigned Brentwood Road (Work No. 6D), for 270 metres in length.
Work No. G6 – as shown on sheets 31, 32, 33 and 34 of the works plans and being the installation of a high-pressure gas pipeline commencing at a point situated south of the improved A13 road (Work No. 7F) heading north-west and terminating north of the realigned Stifford Clays Road (Work No. 7L), for 5,229 metres in length.
Work No. G6a – as shown on sheet 31 of the works plans and being the construction of a new gas compound at Stanford Road.
Work No. G6b – as shown on sheet 32 of the works plans and being the installation of an isolation valve south of the improved A13 road (Work No. 7F).
Work No. G7 – as shown on sheets 33 and 35 of the works plans and being the installation of a high-pressure gas pipeline commencing at a point situated north of Green Lane, crossing the new A122 Lower Thames Crossing (Work No. 8A) and terminating south of the new drainage pond (Work No. 8F), for 338 metres in length.
Work No. G8 – as shown on sheets 38 and 39 of the works plans and being the diversion of existing gas pipeline commencing at a point north of utility logistic hub (Work No. ULH 04) and terminating east of North Road (Work No. 8D), for 1,575 metres in length.
Work No. G9 – as shown on sheets 39 and 40 of the works plans and being the diversion of existing gas pipeline commencing at a point east of North Road (Work No. 8D) and terminating west of the new A122 Lower Thames Crossing (Work No. 9A), for 1,151 metres in length.
Work No. G10 – as shown on sheet 46 of the works plans and being the installation of a high-pressure gas pipeline situated south of Folkes Lane Wood and crossing the improved M25 road (Work No. 9E), for 630 metres in length.
Work No. TFGP1 – as shown on sheet 23 and being the installation of a high-pressure gas pipeline commencing at a point situated west of the new A122 Lower Thames Crossing, crossing under Tilbury viaduct (Work No. 6B) and terminating south of Goshem’s Farm, for 300 metres in length.
Utilities works – Multi-utility diversion works¶
Work No. MU1 – as shown on sheet 3 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, including the installation of a new substation (annotated as SS1) in a 5x5m plot west of Harlex Haulage.
Work No. MU2 – as shown on sheet 3 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, crossing under the A2 improvement works (Work No. 1A).
Work No. MU3 – as shown on sheets 3 and 4 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, in the verge of the new A2 westbound link road (Work No. 1F).
Work No. MU4 – as shown on sheets 3 and 4 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, on the outside of the proposed earthworks along the new A2 westbound link road (Work No. 1F).
Work No. MU5 – as shown on sheet 4 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, in the new Brewers Road bridge and along the improved section of Brewers Road (Work No. 1D).
Work No. MU6 – as shown on sheet 4 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, in the verge of the improved section of the Brewers Road (Work No. 1D).
Work No. MU7 – as shown on sheet 4 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, on the outside of the proposed earthworks along the new A2 eastbound link road (Work No. 1C).
Work No. MU8 – as shown on sheets 4 and 5 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, along one lane of the existing Halfpence Lane.
Work No. MU9 – as shown on sheets 4 and 6 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, along the new local road between the existing Halfpence Lane roundabout and Henhurst Road roundabout (Work No. 1E and Work No. 2V).
Work No. MU10 – as shown on sheet 4 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, along the new Thong Lane (Work No. 1H) and south of Inn on the Lake.
Work No. MU11 – as shown on sheet 4 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, along the new Thong Lane (Work No. 1H) including the installation of two new electrical substations (annotated as SS2 and SS3) in a 5x5m plot at the construction area Work No. CA2 location.
Work No. MU12 – as shown on sheet 4 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, along the new Thong Lane bridge (Work No. 1H).
Work No. MU13 – as shown on sheet 6 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor and the provision of two new substations (annotated as SS4 and SS5) in a 5x5m plot south of the new Cobham roundabout (Work No. 2U).
Work No. MU14 – as shown on sheet 6 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, south of the new Henhurst roundabout (Work No. 2E) and south of the new local road between Henhurst roundabout and the improved A2 mainline (Work No. 2X and 2Y) including the installation of a new electrical substation (annotated as SS6) in a 5x5m plot located south east of the new Henhurst roundabout.
Work No. MU15 – as shown on sheets 6, 7 and 8 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, along the north side of the improved section of the A2 (Work No. 2S) to provide permanent power supply for the South Portal (Work No. 3C) from Northfleet East Grid substation.
Work No. MU16 – as shown on sheet 6 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north and around the Gravesend East Junction north (Work No. 2Z).
Work No. MU17 – as shown on sheets 6 and 11 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor; located north of the new Gravesend East Junction link road (Work No. 2I) and terminating south of the realigned Thong Lane over the new A122 Lower Thames Crossing (Work No. 3B).
Work No. MU18 – as shown on sheet 11 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, along the new bridge to carry the realigned Thong Lane over the new A122 Lower Thames Crossing (Work No. 3B).
Work No. MU19 – as shown on sheets 11 and 13 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, from the new bridge to carry the realigned Thong Lane over the new A122 Lower Thames Crossing (Work No. 3B) to provide permanent power supply for the South Portal (Work No. 3C) from Northfleet East Grid substation.
Work No. MU20 – as shown on sheets 12 and 13 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, along the existing A226 and to provide connection the new substation (MU21).
Work No. MU21 – as shown on sheet 13 of the works plans and being the construction of a new permanent utility compound, to include the construction of a new primary substation for power supply to the South Portal (Work No. 3C).
Work No. MU22 – as shown on sheet 13 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, along the existing A226 over the new A122 Lower Thames Crossing tunnel (Work No. 4A).
Work No. MU23 – as shown on sheet 13 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, along the existing A226 at the access point to the new construction area Work No. CA3.
Work No. MU24 – as shown on sheet 13 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, along the existing A226 over the new A122 Lower Thames Crossing tunnel (Work No. 4A).
Work No. MU25 – as shown on sheet 14 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south of the new construction area Work No. CA3A.
Work No. MU26 – as shown on sheet 14 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north of the new construction area Work No. CA3A along the existing Lower Higham Road.
Work No. MU27 – as shown on sheets 16, 20, 21 and 23 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, along the new construction area Work No. CA5, to provide permanent connection to the North Portal (Work No. 5A).
Work No. MU28 – as shown on sheets 20, 23 and 24 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, between the new overhead diversion from East Tilbury to Linford (Work No. OH3).
Work No. MU29 – as shown on sheets 20 and 23 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located from the new construction area Work No. CA5 and Gun Hill, to provide permanent water supply to the new North Portal (Work No. 5A).
Work No. MU30 – as shown on sheet 23 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located around the existing Station Road.
Work No. MU31 – as shown on sheet 23 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor; located around the new viaduct to carry the new A122 Lower Thames Crossing over the Tilbury Loop railway line (Work No. 5C).
Work No. MU32 – as shown on sheet 23 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located under the new viaduct to carry the new A122 Lower Thames Crossing over the Tilbury Loop railway line (Work No. 5C).
Work No. MU33 – as shown on sheet 23 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north of the new viaduct to carry the new A122 Lower Thames Crossing over the Tilbury Loop railway line (Work No. 5C), including the installation of a new electrical substation (annotated as SS7) in a 5x5m plot located north of the reconfigured reservoir (Work No. 5K).
Work No. MU34 – as shown on sheet 24 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south of the new section of the realigned Muckingford Road (Work No. 6B).
Work No. MU35 – as shown on sheets 24 and 25 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new Muckingford Road (Work No. 6B).
Work No. MU36 – as shown on sheet 24 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located around the new Muckingford Road (Work No. 6B), including the installation of a new electrical substation (annotated as SS8) in a 5x5m plot located at the intersection with Ashlea Farm.
Work No. MU37 – as shown on sheets 24 and 27 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north of the new realigned Hoford Road (Work No. 6C).
Work No. MU38 – as shown on sheet 28 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located east of the new realigned Brentwood Road (Work No. 6D).
Work No. MU39 – as shown on sheets 28 and 32 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new realigned Brentwood Road (Work No. 6D) and along the existing Brentwood Road for connection at Orsett Cock roundabout (Work No. 7F).
Work No. MU40 – as shown on sheet 28 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located east and west of the new realigned Brentwood Road (Work No. 6D).
Work No. MU41 – as shown on sheets 28, 29 and 32 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located between the new realigned Brentwood Road (Work No. 6D) and the new A13 junction, including the installation of two new electrical substation (annotated as SS9 and SS10) in a 5x5m plot located at the Brook Farm and Heath Place.
Work No. MU42 – as shown on sheet 31 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the existing A1013 Stanford Road.
Work No. MU43 – as shown on sheet 32 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south of the realigned section of the A1013 Stanford Road (Work No. 7D), including the installation of a new electrical substation (annotated as SS14) in a 5x5m plot located east of the new realigned Rectory Road (Work No. 7J).
Work No. MU44 – as shown on sheets 26, 29 and 32 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south of the realigned section of the A1013 Stanford Road (Work No. 7D).
Work No. MU45 – as shown on sheet 32 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new realigned Rectory Road bridge (Work No. 7J), including the installation of a new electrical substation (annotated as SS15) in a 5x5m plot located west of the new realigned Rectory Road (Work No. 7J).
Work No. MU46 – as shown on sheets 28, 29, 32 and 33 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the existing Mill Lane.
Work No. MU47 – as shown on sheets 28, 29 and 32 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, connecting Hornsby Lane and the realigned section of the A1013 Stanford Road (Work No. 7D).
Work No. MU48 – as shown on sheets 28 and 29 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located west of Hornsby Lane, including the installation of a new electrical substation (SS11) in a 5x5m plot located west of Rose Cottage.
Work No. MU49 – as shown on sheet 29 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the existing Heath Road, including the installation of a new electrical substation (annotated as SS12) in a 5x5m plot located west of the new A122 Lower Thames Crossing (Work No. 7A).
Work No. MU50 – as shown on sheet 29 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the existing Heath Road north of the new substation (annotated as SS12).
Work No. MU51 – as shown on sheet 29 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new realigned Baker Street (Work No. 7V).
Work No. MU52 – as shown on sheets 29 and 33 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new realigned Baker Street (Work No. 7V), including the installation of a new electrical substation (annotate as SS13) in a 5x5m plot located west of Baker Street.
Work No. MU53 – as shown on sheet 29 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along Woolings Close.
Work No. MU54 – as shown on sheets 29 and 33 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south-west of the new improved A13 road (Work No. 7F).
Work No. MU55 – as shown on sheet 29 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along Gammonfields Way (Work No. 7U) and connecting at Long Lane.
Work No. MU56 – as shown on sheets 29 and 33 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, connecting the multi-utilities diversion Work No. MU55 and the north-east of the new realigned Stifford Clays Road (Work No. 7L).
Work No. MU57 – as shown on sheets 29 and 33 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located around the existing A13 road.
Work No. MU58 – as shown on sheet 33 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south-west of the new realigned Stifford Clays Road (Work No. 7L).
Work No. MU59 – as shown on sheet 33 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south-east of the new realigned Stifford Clays Road (Work No. 7L).
Work No. MU60 – as shown on sheets 33 and 34 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility within a multi-utility corridor, located along the new realigned Stifford Clays Road (Work No. 7L).
Work No. MU61 – as shown on sheet 38 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located around the new viaduct to carry the new A122 Lower Thames Crossing over the river Mardyke (Work No. 8B).
Work No. MU62 – as shown on sheet 38 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new bridge to carry FP136 (Work No. 8C).
Work No. MU63 – as shown on sheets 38 and 41 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located around the new bridge to carry FP136 (Work No. 8C).
Work No. MU64 – as shown on sheets 38 and 39 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north of the new A122 Lower Thames Crossing (Work No. 8A).
Work No. MU65 – as shown on sheet 38 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located under the new A122 Lower Thames Crossing (Work No. 8A).
Work No. MU66 – as shown on sheet 39 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south of the new bridge to carry North Road over the new A122 Lower Thames Crossing (Work No. 8D).
Work No. MU67 – as shown on sheet 39 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south-west of the new bridge to carry North Road over the new A122 Lower Thames Crossing (Work No. 8D).
Work No. MU68 – as shown on sheet 39 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new bridge to carry North Road over the new A122 Lower Thames Crossing (Work No. 8D).
Work No. MU69 – as shown on sheet 39 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located west of the new bridge to carry North Road over the new A122 Lower Thames Crossing (Work No. 8D).
Work No. MU70 – as shown on sheet 39 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north-west of the new bridge to carry North Road over the new A122 Lower Thames Crossing (Work No. 8D).
Work No. MU71 – as shown on sheets 39 and 40 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north and under the new A122 Lower Thames Crossing (Work No. 9A).
Work No. MU72 – as shown on sheets 42, 43 and 44 of the works plans and being the diversion of multi-utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located between the south of Ockendon Road and St Mary’s Lane.
Work No. MU73 – as shown on sheet 42 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south of Ockendon Road and under the new A122 Lower Thames Crossing (Work No. 9A).
Work No. MU74 – as shown on sheet 42 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located east of the M25.
Work No. MU75 – as shown on sheet 42 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located west of the M25.
Work No. MU76 – as shown on sheet 42 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the Ockendon Road.
Work No. MU77 – as shown on sheets 42 and 43 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north of Ockendon Road.
Work No. MU78 – as shown on sheet 43 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new public right of way over the new A122 Lower Thames Crossing (Work No. 9O).
Work No. MU79 – as shown on sheet 44 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south of St Mary’s Lane.
Work No. MU80 – as shown on sheet 44 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the existing St Mary’s Lane.
Work No. MU81 – as shown on sheet 44 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the east of the M25 (Work No. 9E) between the existing St Mary’s Lane and Latchford Farm.
Work No. MU82 – as shown on sheet 44 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located under the M25 (Work No. 9E) and south of St Mary’s Lane.
Work No. MU83 – as shown on sheet 44 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located under the M25 (Work No. 9E) and north of St Mary’s Lane.
Work No. MU84 – as shown on sheet 44 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located south of Shoebury Railway line.
Work No. MU85 – as shown on sheet 45 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located along the new public right of way under the new A122 (Work No. 9P).
Work No. MU86 – as shown on sheets 44 and 45 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located north of Shoebury Railway line.
Work No. MU87 – as shown on sheet 45 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor and the installation of poles and pole mounted transformers, located under and along the western side of the M25 (Work No. 9E).
Work No. MU88 – as shown on sheet 45 of the works plans and being the diversion of multi- utilities, to include installation or diversion of underground utilities within a multi-utility corridor, located under the M25 junction 29 along the improved A127 (Work No. 9J).
Work No. MU89 – as shown on sheet 45 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, located under the M25 junction 29 (Work No. 9G) and north of the improved A127 highway (Work No. 9J).
Work No. MU90 – as shown on sheet 45 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, located around the new public right of way over the improved section of the A127 highway (Work No. 9Z).
Work No. MU91 – as shown on sheet 45 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor, located around the new public right of way over the improved section of the A127 highway (Work No. 9Y).
Work No. MU92 – as shown on sheet 46 of the works plans and being the diversion of multi-utilities, to include the installation or diversion of underground utilities within a multi-utility corridor and the installation of a pole and pole mounted transformer, located under and along the improved section of the M25 (Work No. 9E).
Utilities works – Temporary multi-utility diversion works¶
Work No. MUT1 – as shown on sheet 4 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA2 within a multi-utility corridor located over the existing Thong Lane bridge, for 606 metres in length.
Work No. MUT2 – as show on sheet 4 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections within a multi-utility corridor located west of Thong Lane bridge, for 227 metres in length.
Work No. MUT3 – as shown on sheet 13 and 14 of the works plan and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA3 and Work No. CA3a within a multi-utility corridor located along A226, for 708 metres in length.
Work No. MUT4 – as shown on sheets 16, 20 and 21 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for supply to TBM substation located at construction area Work No. CA5 within a dual multi-utility corridor located east of the former Tilbury Power station, for 1,085 metres in length.
Work No. MUT5 – as shown on sheet 16 and 20 of the works plans and being the temporary installation of a substation to power the TBM located at construction area Work No. CA5.
Work No. MUT6 – as shown on sheets 20, 22, 23 and 24 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA5 within a multi-corridor located to the west of East Tilbury and Linford, for 3,132 metres in length.
Work No. MUT7 – as shown on sheet 20 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA5 within a multi-corridor located at Tilbury, for 320 metres in length.
Work No. MUT8 – as shown on sheets 20 and 23 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA5 within a multi-corridor located at Tilbury, for 450 metres in length.
Work No. MUT9 – as shown on sheets 20 and 23 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA5 within a multi-corridor located at Tilbury, for 500 metres in length.
Work No. MUT10 – as shown on sheet 23 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA5 within a multi-corridor located at Tilbury, for 62 metres in length.
Work No. MUT11 – as shown on sheet 22 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA5 within a multi-corridor located along Love Lane, for 532 metres in length.
Work No. MUT12 – as shown on sheet 28 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA6 within a multi-corridor located east of Brentwood Road, for 615 metres in length.
Work No. MUT13 – as shown on sheets 28, 29, 33 and 35 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction areas Work No. CA6, CA7, CA9, CA10 and Work No. CA11 within a multi-corridor from Brentwood Road to the construction area CA11, for 5,333 metres in length.
Work No. MUT14 – as shown on sheets 25, 26 and 28 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction areas Work No. CA6, CA7, CA8, CA9, CA10 and Work No. CA11 within a multi-corridor along Marshfoot Road to Brentwood Road, for 2,365 metres in length.
Work No. MUT15 – as shown on sheets 28 and 32 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA6 within a multi-corridor along Brentwood Road, for 886 metres in length.
Work No. MUT16 – as shown on sheets 28 and 29 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA8 within a multi-corridor crossing A1013 road, for 1,500 metres in length.
Work No. MUT17 – as shown on sheets 28, 29 and 32 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA7 within a multi-corridor crossing Hornsby Lane, for 486 metres in length.
Work No. MUT18 – as shown on sheets 28 and 29 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA7 within a multi-corridor between Hornsby Lane and Heath Road, for 873 metres in length.
Work No. MUT19 – as shown on sheet 32 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections within a multi-corridor between Orsett Cock gyratory and Rectory Road, for 914 metres in length.
Work No. MUT20 – as shown on sheets 29 and 33 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA8 within a multi-corridor western of A1089 road, for 1,736 metres in length.
Work No. MUT21 – as shown on sheet 33 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction areas Work No. CA9 and Work No. CA10 within a multi-corridor along Stifford Clays Road, for 1,662 metres in length.
Work No. MUT22 – as shown on sheets 33 and 35 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA11 within a multi-corridor along Fen Lane, for 1,860 metres in length.
Work No. MUT23 – as shown on sheets 30, 33 and 34 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA9 within a multi-corridor along Stifford Clays Road, for 785 metres in length.
Work No. MUT24 – as shown on sheets 33, 34, 35 and 36 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA9 within a multi-corridor along Medebridge Road, for 3,000 metres in length.
Work No. MUT25 – as shown on sheet 35 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA11 within a multi-corridor, for 931 metres in length.
Work No. MUT26 – as shown on sheets 38, 39 and 41 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA13 within a multi-corridor, for 1,655 metres in length.
Work No. MUT27 – as shown on sheets 38 and 39 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA13 within a multi-corridor, for 907 metres in length.
Work No. MUT28 – as shown on sheets 39, 42 and 43 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction areas Work No. CA13 and Work No. CA14 within a multi-corridor along North Road and Clay Tye Road, for 2,035 metres in length.
Work No. MUT29 – as shown on sheet 39 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area Work No. CA14 within a multi-corridor west of North Road, for 922 metres in length.
Work No. MUT30 – as shown on sheet 42 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the temporary diversion of Ockendon Road within a multi-corridor, for 292 metres in length.
Work No. MUT31 – as shown on sheets 42 and 43 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area CA15 within a multi-corridor along Ockendon Road, for 245 metres in length.
Work No. MUT32 – as shown on sheet 45 of the works plans and being the temporary installation of multi-utilities, to include the installation or diversion of underground utilities connections for the construction area CA16 within a multi-corridor along Warley Road, for 700 metres in length.
Environmental works¶
Work No. E1 – as shown on sheets 1 and 2 of the works plans and being the implementation of environmental works to create a compensatory habitat site for nitrogen deposition.
Work No. E2 – not used.
Work No. E3 – as shown on sheet 3 of the works plans and being the implementation of environmental mitigation works to create a site for ancient woodland planting, including the construction of a new bat barn structure (BBr1).
Work No. E4 – as shown on sheet 4 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E5 – as shown on sheets 4 and 6 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E6 – as shown on sheets 4 and 11 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure (BBr4) and new ecological ponds.
Work No. E7 – as shown on sheet 6 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure (BBr2).
Work No. E8 – as shown on sheet 6 of the works plans and being the implementation of environmental works to create a compensatory habitat site for nitrogen deposition.
Work No. E9 – as shown on sheets 6 and 11 of the works plans and being the implementation of environmental mitigation works to create a site for ancient woodland planting.
Work No. E10 – as shown on sheet 11 of the works plans and being the implementation of environmental mitigation works to create a site for ancient woodland planting, including the construction of a new bat barn structure (BBr3).
Work No. E11 – as shown on sheets 10 and 11 of the works plans and being the implementation of environmental mitigation works to create a site for ancient woodland planting.
Work No. E12 – as shown on sheet 10 of the works plans and being the implementation of environmental works to create a compensatory habitat site for nitrogen deposition.
Work No. E13 – as shown on sheets 9 and 10 of the works plans and being the implementation of environmental works to create a compensatory habitat site for nitrogen deposition.
Work No. E14 – as shown on sheets 16, 20 and 23 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E15 – as shown on sheet 19 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E16 – as shown on sheets 19 and 22 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E17 – as shown on sheets 19 and 22 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure (BBr5).
Work No. E18 – as shown on sheet 23 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E19 – as shown on sheets 23 and 24 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E20 – as shown on sheet 24 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E21 – as shown on sheet 27 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E22 – as shown on sheet 27 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E23 – as shown on sheet 27 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E24 – as shown on sheet 27 of the works plans and being the implementation of environmental mitigation works to create a site for ancient woodland planting, including the construction of a new bat barn structure (BBr6).
Work No. E25 – as shown on sheets 27 and 28 of the works plans and being the implementation of environmental works to create a compensatory habitat site for nitrogen deposition.
Work No. E26 – as shown on sheets 27 and 31 of the works plans and being the implementation of environmental works to create a compensatory habitat site for nitrogen deposition.
Work No. E27 – as shown on sheet 28 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E28 – as shown on sheet 28 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E29 – as shown on sheet 29 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E30 – as shown on sheet 29 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E31 – as shown on sheets 29 and 33 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E32 – as shown on sheet 33 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E33 – as shown on sheet 33 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E34 – as shown on sheet 33 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E35 – as shown on sheet 35 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure (BBr7).
Work No. E36 – as shown on sheets 35, 37, 38 and 41 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure (BBr8) and new ecological ponds.
Work No. E37 – as shown on sheets 35 and 37 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E38 – as shown on sheet 36 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E39 – as shown on sheet 37 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E40 – as shown on sheet 38 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E41 – as shown on sheet 39 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E42 – as shown on sheet 41 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E43 – as shown on sheet 42 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E44 – as shown on sheet 42 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E45 – as shown on sheets 42 and 43 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure (BBr8).
Work No. E46 – as shown on sheet 43 of the works plans and being the implementation of environmental mitigation works to create a site for protected species.
Work No. E47 – as shown on sheet 44 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E48 – as shown on sheet 44 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E49 – as shown on sheets 45 and 46 of the works plans and being the implementation of environmental mitigation works to create a site for ancient woodland planting.
Work No. E50 – as shown on sheets 46 and 47 of the works plans and being the implementation of environmental mitigation works to create a site for ancient woodland planting, including the construction of new ecological ponds.
Work No. E51 – as shown on sheets 46 and 47 of the works plans and being the implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.
Work No. E52 – as shown on sheets 46 and 47 of the works plans and being the implementation of environmental works to create a compensatory habitat site for nitrogen deposition.
Temporary environmental works¶
Work No. ET1 – as shown on sheets 14 and 15 of the works plans and being the temporary implementation of environmental works to create a compensatory habitat site.
Open space and common land¶
Work No. OSC1 – as shown on sheet 3 of the works plans and being the implementation of replacement open space for Shorne Woods country park.
Work No. OSC2 – not used.
Work No. OSC3 – not used.
Work No. OSC4 – as shown on sheets 11 and 13 of the works plans and being the implementation of new recreational site, to include—
Work No. OSC5 – as shown on sheets 16, 20 and 23 of the works plans and being the implementation of new replacement land, to include—
Work No. OSC6 – as shown on sheet 29 of the works plans and being the implementation of replacement open space for Ron Evans memorial field.
Work No. OSC7 – as shown on sheets 29 and 33 of the works plans and being the implementation of replacement open space for Ron Evans memorial field.
Work No. OSC8 – as shown on sheets 33, 34 and 35 of the works plans and being the implementation of replacement common land for Orsett Fen.
Work No. OSC9 – as shown on sheets 37 and 38 of the works plans and being the implementation of replacement common land for Orsett Fen.
Work No. OSC10 – as shown on sheets 42 and 43 of the works plans and being the implementation of replacement open space for Thames Chase Forest Centre.
Work No. OSC11 – as shown on sheet 44 of the works plans and being the implementation of replacement open space for Thames Chase Forest Centre.
Work No. OSC12 – as shown on sheet 47 of the works plans and being the implementation of replacement open space for Folkes Lane.
Flood compensation areas¶
Work No. FCA1 – as shown on sheet 23 of the works plans and being the construction of a new flood compensation area.
Work No. FCA2 – as shown on sheets 35, 37 and 38 of the works plans and being the construction of a new flood compensation area.
Work No. FCA3 – as shown on sheets 35 and 38 of the works plans and being the construction of a new flood compensation area.
Work No. FCA4 – as shown on sheet 38 of the works plans and being the construction of a new flood compensation area.
Work No. FCA5 – as shown on sheet 44 of the works plans and being the construction of a new flood compensation area.
Work No. FCA6 – as shown on sheet 44 of the works plans and being the construction of a new flood compensation area.
Work No. FCA7 – as shown on sheet 44 of the works plans and being the construction of a new flood compensation area.
Construction areas – Main works compounds¶
Work No. CA1 – as shown on sheet 6 of the works plans, the establishment of a construction compound for main works, located north of Gravesend East junction, of 2,980 square metres.
Work No. CA2 – as shown on sheet 4 of the works plans, the establishment of a construction compound for main works, located west of Thong Lane, of 50,605 square metres.
Work No. CA3 – as shown on sheets 11, 13 and 14 of the works plans, the establishment of a construction compound for main works, located around the south tunnel portal, of 1,634,861 square metres.
Work No. CA3A – as shown on sheet 14 of the works plans, the establishment of a satellite construction compound for main works, located north of the south tunnel portal, of 55,030 square metres.
Work No. CA3B – as shown on sheet 15 of the works plans, the establishment of a satellite construction compound for main works, located north of North Kent railway, of 31,989 square metres.
Work No. CA4 – not used.
Work No. CA5 – as shown on sheets 16, 17, 20, 21, 22 and 23 of the works plans, the establishment of a construction compound for main works, located around the north tunnel portal, of 1,880,418 square metres, to include—
Work No. CA5A – as shown on sheet 23 of the works plans, the establishment of a satellite construction compound for main works, located north of the construction compound on the north tunnel portal (Work No. CA5), of 44,512 square metres.
Work No. CA6 – as shown on sheet 28 of the works plans, the establishment of a construction compound for main works, located west of Brentwood Road, of 110,323 square metres.
Work No. CA7 – as shown on sheet 28 of the works plans, the establishment of a construction compound for main works, located, of 5,000 square metres.
Work No. CA8A – as shown on sheet 29 of the works plans, the establishment of a construction compound for main works, located west of the new A13 junction, of 42,519 square metres.
Work No. CA8B – as shown on sheet 29 of the works plans, the establishment of a construction compound for main works, located west of the new A13 junction, of 14,862 square metres.
Work No. CA9 – as shown on sheet 33 of the works plans, the establishment of a construction compound for main works, located south of Stifford Clays Road, of 39,845 square metres.
Work No. CA10 – as shown on sheet 33 of the works plans, the establishment of a construction compound for main works, located north of Stifford Clays Road, of 67,309 square metres.
Work No. CA11 – as shown on sheet 35 of the works plans, the establishment of a construction compound for main works, located south of Mardyke area, of 28,874 square metres.
Work No. CA12 – not used.
Work No. CA13 – as shown on sheets 38 and 39 of the works plans, the establishment of a construction compound for main works, located west of Mardyke area, of 42,210 square metres.
Work No. CA14 – as shown on sheets 39 and 42 of the works plans, the establishment of a construction compound for main works, located south of Ockendon road, of 224,708 square metres.
Work No. CA15A – as shown on sheet 43 of the works plans, the establishment of a construction compound for main works, located north of Ockendon road, of 32,674 square metres.
Work No. CA16 – as shown on sheet 45 of the works plans, the establishment of a construction compound for main works, located south of the existing M25 junction 29, of 24,347 square metres.
Construction areas – Utility logistics hubs¶
Work No. ULH01 – as shown on sheets 46 and 47 of the works plans, the establishment of a utility logistics hub, located east of Folkes Lane woodland, of 13,200 square metres.
Work No. ULH02 – as shown on sheet 46 of the works plans, the establishment of a utility logistics hub, located south of Folkes Lane woodland, of 2,100 square metres.
Work No. ULH03 – not used.
Work No. ULH04 – as shown on sheet 38 of the works plans, the establishment of a utility logistics hub, located north of the Mardyke area, of 14,300 square metres.
Work No. ULH05 – as shown on sheet 34 of the works plans, the establishment of a utility logistics hub, located north of Stifford Clays Road, of 13,200 square metres.
Work No. ULH06 – as shown on sheets 31 and 32 of the works plans, the establishment of a utility logistics hub, located east of Orsett Cock roundabout, of 14,800 square metres.
Work No. ULH07 – as shown on sheet 33 of the works plans, the establishment of a utility logistics hub, located north of the improved A13 junction, of 13,275 square metres.
Work No. ULH08 – as shown on sheet 29 of the works plans, the establishment of a utility logistics hub, located west of the improved A13 junction, of 17,973 square metres.
Work No. ULH09 – as shown on sheet 28 of the works plans, the establishment of a utility logistics hub, located south of the improved A13 junction, of 14,300 square metres.
Work No. ULH10 – as shown on sheet 28 of the works plans, the establishment of a utility logistics hub, located west of Brentwood Road, of 13,200 square metres.
Work No. ULH11 – as shown on sheet 24 of the works plans, the establishment of a utility logistics hub, located south of Muckingford Road, of 9,618 square metres.
Work No. ULH12 – as shown on sheets 23 and 24 of the works plans, the establishment of a utility logistics hub, located west of the new Tilbury viaduct, of 8,380 square metres.
Work No. ULH13 – as shown on sheet 11 of the works plans, the establishment of a utility logistics hub, located east of the realigned Thong Lane, of 60,765 square metres.
Work No. ULH14 – as shown on sheets 6 and 11 of the works plans, the establishment of a utility logistics hub, located north of Claylane Wood, of 52,712 square metres.
Work No. ULH15 – as shown on sheet 6 of the works plans, the establishment of a utility logistics hub, located east of the new A2/A122 Lower Thames Crossing junction, of 15,545 square metres.
Work No. ULH16 – as shown on sheet 3 of the works plans, the establishment of a temporary utility logistics hub, located north of Park Pale, of 9,416 square metres.
Ancillary works¶
For the purposes of or in connection with the construction of any of the works and other development in the Order limits, ancillary or related works and other development which is not likely to give rise to any materially new or materially different environmental effects to those assessed in the environmental statement consisting of—
I315PART 2 WORKS TO SCHEDULED MONUMENTS¶
| Scheduled Monument | Archaeological works | Works Nos. |
|---|---|---|
|
Coalhouse Fort battery and artillery defences
(Historic England List Entry Number 1013943)
| N/A | Works Nos. 5X and E15 |
| Crop mark complex, Orsett (Historic England List Entry Number 1002134) | Full archaeological excavation, including post excavation analysis, archive deposition and publication in connection with the Scheduled Monument referred to in column 1. |
Works Nos. 7L, 7K;
MU13, MU56, MU58;
OH6 and OH7
|
SCHEDULE 2 ¶
REQUIREMENTS
Articles 3 and 36
PART 1 REQUIREMENTS¶
I691 Interpretation¶
- “advanced compound areas” means the areas shown as advanced compound areas in plate 3.1 of the Code of Construction Practice;
- “AMS-OWSI” means the draft Archaeological Mitigation Strategy and Outline Written Scheme of Investigation (Appendix 6.9 of the environmental statement, application document TR010032/APP/6.3)
- “Code of Construction Practice” means the Code of Construction Practice including the Register of Environmental Actions and Commitments listed in Schedule 16 (documents to be certified) and certified as the code of construction practice by the Secretary of State and which is the first iteration of an environmental management plan;
- “commence” means beginning to carry out any material operation (as defined in section 56(4) (time when development begun) of the 1990 Act) forming part of the authorised development other than preliminary works and “commencement” is to be construed accordingly; “contaminated land” has the same meaning as that given in section 78A of the Environmental Protection Act 1990152;
- “the design principles document” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State;
- “EMP (Second Iteration)” means the second iteration of an environmental management plan to be submitted and approved under paragraph 4(2) of this Schedule;
- “EMP (Third Iteration)” means the third iteration of an environmental management plan which is a handover environmental management plan;
- “LEMP” means a landscape and ecological management plan submitted and approved under paragraph 5(1) of this Schedule;
- “the Manual of Contract Documents for Highway Works” means the document of that name published electronically by or on behalf of the strategic highway authority for England or any equivalent replacement published for that document;
- “Mitigation Route Map” means a document providing an index to, description of, and access to plans and documents prepared pursuant to paragraphs 4, 5, 9. 10, 11 and 16 of this Schedule;
- “outline traffic management plan for construction” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State;
- “preliminary works” means operations consisting of—
- archaeological investigations and pre-construction ecological mitigation (including in connection with those investigations or mitigation vegetation clearance);
- environmental surveys and monitoring;
- investigations for the purpose of assessing and monitoring ground conditions and levels;
- erection of any temporary means of enclosure;
- receipt and erection of construction plant and equipment for advanced compound areas;
- diversion and laying of underground apparatus (except Works Nos. G1a to G10, Work No. TFGP1, Works Nos. MU1 to MU92 and Works Nos. MUT1 to MUT32) for advanced compound areas;
- accesses for advanced compound areas (and vegetation clearance in connection with those accesses); and
- the temporary display of site notices or information;
- “preliminary works EMP” means Annex C of the Code of Construction Practice and includes the preliminary works REAC;
- “preliminary works REAC” means those measures in the REAC applying to the preliminary works as shown in Table 2.1 of Annex C of the Code of Construction Practice; and
- “REAC” means the register of environmental actions and commitments contained in the Code of Construction Practice.
I702 Time limits¶
The authorised development must begin no later than the expiration of 5 years beginning with the date that this Order comes into force.I713 Detailed design¶
I724 Construction and handover environmental management plans¶
- “outline materials handling plan” means the outline materials handling plan appended to the Code of Construction Practice; and
- “outline site waste management plan” means the outline site waste management plan appended to the Code of Construction Practice.
I735 Landscaping and ecology¶
I746 Contaminated land and groundwater¶
I757 Protected species¶
- “European protected species” has the same meaning as in regulations 42 (European protected species of animals) and 46 (European protected species of plants) of the Conservation of Habitats and Species Regulations 2017154; and
- “nationally protected species” means any species protected under the Wildlife and Countryside Act 1981155.
I768 Surface and foul water drainage¶
I779 Historic environment¶
I7810 Traffic management¶
I7911 Construction travel plans¶
I8012 Fencing¶
I8113 Travellers’ site in Thurrock¶
- “caravans” means caravans within the meaning of section 29(1)(a) of the Caravan Sites and Control of Development Act 1968158; and
- “Gammon Field travellers’ site” means the travellers’ site located at Long Lane, Grays, Thurrock, RM16 2QH.
I8214 Traffic monitoring¶
I8315 Interaction with Thurrock Flexible Generation Plant¶
- “commenced” has the meaning given by article 2(1) of the Thurrock Flexible Generation Plant Development Consent Order 2022159; and
- “Thurrock Power Ltd” means the limited company with the company number 10917470, whose registered office is at 1st Floor, 145 Kensington Church Street, London, England, W8 7LP.
I8416 Carbon and energy management plan¶
- “CEP (First Iteration)” means the carbon and energy management plan listed in Schedule 16 (documents to be certified) and certified by the Secretary of State and which is the first iteration of the carbon and energy management plan;
- “CEP (Second Iteration)” means the second iteration of the carbon and energy management plan to be submitted and approved under paragraph 16(1) of this Schedule; and
- “CEP (Third Iteration)” means the third iteration of the carbon and energy plan which is a handover carbon and energy management plan.
I8517 Passive provision for Tilbury link road¶
I8618 Operation of the Orsett Cock roundabout¶
I8719 Amendments to approved details¶
With respect to any requirement which requires the authorised development to be carried out in accordance with the details, plans or schemes approved under this Schedule, the approved details, plans or schemes are taken to include any amendments that may subsequently be approved in writing by the Secretary of State, or in the case of any approval under paragraph 13 (travellers’ site in Thurrock), the local planning authority.I8820 Amendments to the control documents¶
No part of the authorised development may commence until the Undertaker has made the amendments to the control documents as set out in in Part 3 (amendments to be made to the control documents) of this Schedule.PART 2 PROCEDURE FOR DISCHARGE OF REQUIREMENTS¶
I8921 Applications made to the Secretary of State under Part 1¶
I9022 Further information¶
I9123 Details of consultation¶
I9224 Register of requirements¶
I9325 Anticipatory steps towards compliance with any requirement¶
If before the coming into force of this Order the undertaker or any other person has taken any steps that were intended to be steps towards compliance with any provision of Part 1 of this Schedule, those steps may be taken into account for the purpose of determining compliance with that provision if they would have been valid steps for that purpose had they been taken after this Order came into force.PART 3 AMENDMENTS TO BE MADE TO THE CONTROL DOCUMENTS¶
I9426 Amendments to be made to the Code of Construction Practice and the REAC¶
| Where in Table 7.1 the amendment is to be made | How the amendment is to be made | Text to be substituted, inserted or omitted |
|---|---|---|
| Column 5 of row 13 (REAC ref. no. CH004) | At the end of column 5 of that row, insert | “The Thatched Cottage (LB58) shall not be demolished until the undertaker has concluded an agreement with Historic England and Essex Place Services in relation to its relocation or recording. If relocation is agreed, the building shall be dismantled in accordance with a ‘relocation brief’ agreed between the undertaker, Historic England and Essex Place Services before the commencement of dismantling works. If relocation is not agreed, the demolition shall not proceed until the completion and approval of the Level 4 Historic Building Recording. Appraisal of Murrells Cottage (LB96) has identified that this heritage asset could be an “excellent source” of original materials for potential re-use in repairs to listed buildings in the area. Murrells Cottage shall not be demolished until the undertaker has prepared a ‘materials brief’ making provision for the retrieval and storage of salvageable fixtures, fittings and structural components. Demolition must then proceed generally in accordance with the materials brief and salvaged components must be made available for local re-use.” |
| Column 5 of row 22 (REAC ref. no. GS003) | After “land instability”, insert | “and man-made geohazards including landfill at Goshems Farm Landfill” |
| Column 5 of row 63 (REAC ref. no. LV001) | After “diverted utilities,”, insert | “will protect hedgerows and trees identified for protection from removal and otherwise” |
| Column 5 of row (REAC ref. no. LV013) | Omit | “where reasonably practicable” |
| Column 5 of row 90 (REAC ref. no LV028) | Omit | “as far as reasonably practicable” |
| Column 5 of row 99 (REAC ref. no. LV037) | At the first bullet point, for “as far as reasonably practicable”, substitute | “in accordance with commitments Lv001 and LV028” |
| Column 5 of row 215 (REAC ref. no. TB012) | Omit |
|
| Column 5 of row 232 (REAC ref. no. TB028) | Omit | “, where reasonably practicable,” |
| Column 5 of row 235 (REAC ref. no. TB031) | After “with a view to avoid and/or minimise impacts”, insert | “to the extent that is required by relevant law and policy and otherwise” |
| Topic | REAC ref. no. | Name | Origin | Commitment | Achievement criteria | Party responsible | Stage | Securing mechanism in DCO |
|---|---|---|---|---|---|---|---|---|
| HRA | HR013 | Mitigation of in-combination air quality effects on Epping Forest SAC along part of the M25 | ExA Recommendation Report | Appropriate technology and infrastructure would be employed to enable, if required, the enforcement authority to enforce a 60mph speed limit in a westbound direction between junctions 26 and 27 of the M25 to ensure that there is no Adverse Effect on Integrity (“AEoI”) on Epping Forest SAC as a consequence of traffic emissions leading to increases in nitrogen deposition, NOx and/or NH3. Reasonable and appropriate funding would be provided to the highway and enforcement authority to set a 60mph limit and to undertake enforcement activities. Monitoring should commence no later than 6 months after commencement of construction of the A122 Lower Thames Crossing and remain in place for a minimum period of 4 years following commencement of operation to monitor levels of NOx, NO2 and NH3 (which can be used to determine the vehicle emission related nitrogen deposition) compared to pre-operational values. Annual reporting should be undertaken and include a review of relevant evidence, such as monitoring, traffic data and regional pollution in consultation with Natural England. The 60pmh speed limit measures are to be put in place from the commencement of operation. The Secretary of State may determine, upon receipt of a written request from National Highways that has been informed and agreed through consultation with Natural England, that such measures no longer remain required at or after the point of commencement of operation to prevent an AEoI (on the basis of pre-operation monitoring and any additional assessment undertaken by National Highways). If the outcome from monitoring and updated modelling shows relevant increases in nitrogen deposition, and/or NOx and/or NH3 which would lead to an AEoI then that speed limit control and enforcement must be in place, unless otherwise agreed with Natural England. | Establishment of annual monitoring measure and air quality threshold required to avoid AEoI in agreement with Natural England. Provision of speed enforcement technology and infrastructure as agreed with the enforcement authority. | National Highways | Operation | EMP3 Requirement 4 |
| Road Drainage and Water Environment | RDWE 060 | Water Framework Directive Compliance – non-main watercourse | ExA Recommendation Report | No culvert or equivalent covered passage affecting a non-main watercourse is to be constructed until a Structure Water Framework Directive Compliance Plan (SWFDCP) has been prepared for that structure in consultation with the Lead Local Flood Authority and the Internal Drainage Board (if relevant) or any other relevant drainage authority with responsibility for the watercourse, and agreed by the Environment Agency prior to approval by the Secretary of State. A SWFDCP must contain a detailed design for the structure(s) to which it relates to show the dimensions and internal treatments for the structure and must demonstrate either: (a) that the proposed detailed design provides full compliance with the Water Environment (Water Framework Directive) (England and Wales) Regulations 2017 (WFD Regulations), as amended by the Floods and Water (Amendment etc.) (EU Exit) Regulations 2019 (collectively the WFD Regulations); or (b) if full WFD Regulations compliance cannot be achieved, that the proposed detailed design is accompanied by information to explain: (i) why compliance cannot be achieved; (ii) demonstrating that a derogation under Regulation 19 of the WFD Regulations can be obtained; and (iii) demonstrating how the conditions in Regulations 19(3), (4) and (5) are met by the proposed detailed design. | Agreement by the Environment Agency that structures are WFD compliant or that a derogation can be obtained | National Highways | Construction | Requirement 8 |
| Road Drainage and Water Environment | RDWE061 | Drainage Authority consultation | ExA Recommendation Report | When consents and new discharges are sought under Art 19(3) F32... of the dDCO the undertaker will seek the views of the drainage authority. | Drainage authorities are consulted on Art 19(3) F32... proposals | National Highways | Construction | EMP2 Requirement 4 and Requirement 8 |
| Geology and Soils | GS032 | Minerals and waste consents on land subject to compulsory acquisition or temporary possession | ExA Recommendation Report | Where land that is subject to a remediation or restoration condition or agreement pursuant to a minerals or waste consent is taken as a consequence of compulsory acquisition and or temporary possession, the undertaker indemnifies the former operator or beneficiary of the consent against any liability arising due to enforcement by the local planning authority , where that liability arises during and as a result of the undertaker’s possession of the land. In the case of land possessed temporarily, the indemnity ceases to have effect after the land is returned to the owner. | No outstanding minerals or waste non-compliance or enforcement action on land subject to compulsory acquisition or temporary possession. | National; Highways | Construction and Operation | EMP2 and 3 Requirement 4 |
| Topic | REAC ref. no. | Name | Origin | Commitment | Achievement criteria | Party responsible | Securing mechanism in DCO | Topic |
|---|---|---|---|---|---|---|---|---|
| Terrestrial Biodiversity | TB032 | Agreements to deliver both the offsite mitigation for reintroduction of water voles and the installation and monitoring of barn owl nest boxes | Secretary of State and ES 8.5.46 and 8.5.47 | The undertaker is to enter into agreements with the Essex Wildlife Trust for the provision of— (a) an offsite project reintroducing water voles to catchments within Essex that have suffered from localised extinctions; and (b) a minimum of 12 artificial nest boxes for barn owls to be installed in land managed by the Essex Wildlife Trust >1.5km away from the project boundary and other major roads. | Agreements signed by National Highways and the Essex Wildlife Trust | National Highways | Requirement 4(1) | Terrestrial Biodiversity |
Amendments to be made to the Outline LEMP¶
I9729 Amendments to be made to the Design Principles Document¶
The Design Principles Document (document ref. TR010032/APP/7.5, version 7) is to be amended as set out in table 4, where—| Where the amendment is to be made | How the amendment is to be made | Text to be substituted, inserted or omitted |
|---|---|---|
| After paragraph 2.15.1 | Insert | “2.15.2 Where new services and utilities are proposed to be installed within or affecting SSSIs or other irreplaceable habitats, the contractor must confirm that no other reasonable option exists and that the installation options have been reviewed and that the contractor can find no alternative option which causes less harm.” |
| Table 4.2, column 3 of row 5 (DPD ref. PLA.05) | For “Fragmentation of habitats shall be reduced as far as reasonably practicable by avoiding unnecessary barriers to movement and, where necessary, including design features”, substitute | “Fragmentation of habitats shall be reduced as far as practicable by avoiding unnecessary barriers to movement and including design features” |
| Table 4.3, column 3 of row 7 (DPD ref. PRO.07) | After “Tilbury Fields (Work No. OSC5)”, insert a new indent | “Tilbury Viaduct” |
| Table 4.4, column 3 of row 9 (DPD ref. STR.09) | After “single structure as much as is”, omit | “reasonably” |
| Table 4.5, column 3 of row 4 (DPD ref. LST.04) | After “lighting on green bridges shall be minimised and where possible column heights shall be reduced”, insert | “or low-level lighting (e.g. bollard lighting) utilised” |
| Table 4.6, column 3 of row 1 (DPD ref. LSP.01) | After” However, even outside these areas, existing vegetation shall be retained as far as”, omit | “reasonably” |
| Table 5.1, column 3 of row 1 (DPD ref. S1.01) | For “existing planting along the northern edge of the A2 corridor shall be retained as far as reasonably practicable”, substitute | “existing planting along the northern edge of the A2 corridor shall be retained with losses minimised to the extent that is required by relevant law and policy and otherwise as far as practicable” |
| Table 5.1, column 3 of row 1 (DPD ref. S1.01) | After “the A2 corridor as defined in the Environmental Masterplan (Application Document 6.2, Figure 2.4)”, insert | “and where there are no wayleave/ easement, visibility splay or other highway operational safety requirements, then replacement native woodland should be provided at or as near as possible to the point of loss” |
| Table 5.1, column 3 of row 4 (DPD ref. S1.04) | After “main highway’s corridor as far as”, omit | “reasonably” |
| Table 5.5, column 3 of row 11 (DPD ref. S9.11) | After “Where possible, existing vegetation shall be retained”, omit | “as far as reasonably practicable” |
| Appendix A: Planting Palette, the page headed “LE2.11 Woodland – inc Non-native species Innerstand (cont)” | After “Only used on Thong Lane Heavyweight Green Bridge”, insert | “where non-native species are excluded” |
| Appendix D: Detailed Design Multi-disciplinary Workshop Terms of Reference | After paragraph D.1.4.a(iv), insert | “(v) Publish and share how National Highways has taken into account stakeholder feedback, providing a detailed narrative in circumstances where this was not possible, in the spirit of collaborative, open and transparent stakeholder engagement.” |
| Appendix D: Detailed Design Multi-disciplinary Workshop Terms of Reference | After paragraph D.1.5, insert | “D.1.6 Every attempt will be made to resolve disputes within the MDW’s membership. Wherever possible, decisions shall be made by consensus within the MDW meetings. However, should disputes arise these will be deferred to [the SoST or] an independent expert agreed by all parties in line with DCO Article 64 (Arbitration).” |
I9830 Amendments to be made to the Consents and Agreements Position Statement¶
In the Consents and Agreements Position Statement (document ref. TR010032/APP/8.3, version 8), after paragraph 4.1.2(a), omit sub-paragraph (b) (Consent to carry out works in a site of Special Scientific interest).I9931 Amendments to be made to the SACR¶
| Countryside and Rights of Way Act 2000, Section 85 | SACR-034 | Kent Downs National Landscape | Having regard to the duty of Section 85 of the Countryside and Rights of Way Act 2000 (as amended), to seek to further the purpose of conserving and enhancing the natural beauty of the area of outstanding natural beauty, National Highways will make funding available for appropriate projects to be undertaken within the Kent Downs National Landscape. A total of [£ ] will therefore be made available to the Kent Downs National Landscape team to fund measures and projects that meet a funding criterion that primarily conserves and enhances the natural beauty of the Kent Downs National Landscape. Projects to be funded will be in accordance with the principles of the Kent Downs AONB Management Plan or any superseding document, and will be agreed with the Kent Downs National Landscape team. The fund shall be administered by adopting a process to be agreed between the parties, including timescales for the provision of funds, which shall be substantially in accordance with the process set out in paragraphs 1.1 to 8.2 of Schedule 3 to the unilateral undertaking entered into by National Highways dated 12 December 2023 in relation to the Kent Downs AONB Compensatory Enhancement Fund [REP9-268], subject to the following modifications: (a) in paragraph 1.1, for “£4,240,000 for an AONB Compensatory Enhancement Fund to fund measures and projects that meet the funding criteria set out in paragraph 4.2 of this Schedule (the “Fund”) which includes £600,000 to manage and administer the Fund (together being “the AONB Contribution”)” substitute “[£] (“the AONB Enhancement Contribution”) for an AONB Enhancement Fund to fund measures and projects that meet the funding criteria set out in paragraph 4.2 of this Schedule (the “Fund”)”; (b) in paragraph 3.1, for “AONB Compensatory Enhancement Fund Awards Panel” substitute “AONB Enhancement Fund Awards Panel”; (c) in paragraph 4.1 for “During the Construction Period and for three years thereafter” substitute “From Commencement and for up to three years following the opening of the Authorised Development”. | National Highways | Kent Downs National Landscape | From commencement and up to three years following opening |
I316SCHEDULE 3 ¶
TEMPORARY CLOSURE, ALTERATION, DIVERSION AND RESTRICTION OF USE OF STREETS AND PRIVATE MEANS OF ACCESS
Article 12
(1) Street or private means of access to be closed, altered, diverted or restricted | (2) Extent of closure, alteration, diversion, or restriction of use by vehicles, or vehicles or any class, or persons |
|---|---|
| Three Crutches A2 slip road westbound | Sections of highway between points 2/L and 2/M and between points 2/Z and 2/O as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| Footway/cycle track NCN177 | Sections of cycle track between points 2/AH and 2/AI and between points 2/N and 4/L as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| A289 southbound to M2 southbound slip road | Section of highway between points 2/P and 2/Q as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| A289 southbound to A2 westbound (Wainscott Northern Bypass) | Section of highway between points 2/R and 2/S as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| M2 westbound to A289 northbound slip road (Wainscott Northern Bypass) | Section of highway between points 2/T and 2/U and between points 2/V and 2/W as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| Three Crutches Slip eastbound/A2 Watling Street (A2 eastbound to Old Watling Street) | Section of highway between points 2/X and 2/Y as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| A2 eastbound to A289 northbound link | Section of highway between points 2/AA and 2/AB as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| M2 southbound | Section of highway between points 2/H (existing M2/A2 boundary) and 2/AF as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| M2 northbound | Section of highway between points 2/AC and 2/B (existing M2/A2 boundary) as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| Cycle track from Park Pale to Crutches Lane | Section of cycle track between points 5/J and 4/B as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| NS161 | Section of highway between points 4/B and 4/E as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| Access road south of balancing pond | Private means of access between points 4/G and 4/F as shown on sheet 3 of the streets subject to temporary restrictions of use plans. |
| Park Pale | Section of highway between— of the streets subject to temporary restrictions of use plans. |
| A2 eastbound | Section of highway as shown on sheets 3, 4, 6 and 7 between points 2/H (existing M2/A2 boundary) on sheet 3 and 2/AE on sheet 7 of the streets subject to temporary restrictions of use plans. |
| A2 westbound | Section of highway as shown on sheets 3, 4, 6 and 7 between points 2/B (existing M2/A2 boundary) on sheet 3 and 2/AD on sheet 7 of the streets subject to temporary restrictions of use plans. |
| NS178 | Section of highway between points 5/G and 5/H as shown on sheet 4 of the streets subject to temporary restrictions of use plans. |
| Permissive path through Ashenbank Wood | Section of permissive path between points 5/M and 5/N as shown on sheet 4 of the streets subject to temporary restrictions of use plans. |
| Private means of access from The Mount | Private means of access between points 5/N and 5/O as shown on sheet 4 of the streets subject to temporary restrictions of use plans. |
| Brewers Road | Section of highway between points 5/C and 5/D as shown on sheet 4 of the streets subject to temporary restrictions of use plans. |
| A2 eastbound to Brewers Road link | Section of highway between points 5/F and 5/B as shown on sheet 4 of the streets subject to restrictions of use plans. |
| Brewers Road to A2 eastbound link | Section of highway between points 5/B and 5/E as shown on sheet 4 of the streets subject to temporary restrictions of use plans. |
| A2 westbound off-slip to Brewers Road (Halfpence Lane) roundabout | Section of highway between points 2/J and 2/K as shown on sheet 4 of the streets subject to temporary restrictions of use plans. |
| A2 westbound on-slip from Brewers Road (Halfpence Lane) roundabout | Section of highway between points 12/C and 12/D as shown on sheet 4 of the streets subject to temporary restrictions of use plans. |
| Halfpence Lane roundabout | Section of highway comprising entire roundabout, shown by point 12/E on sheet 4 of the streets subject to temporary restrictions of use plans. |
| NS195 | Section of byway between points 6/M and 6/N on sheet 4 of the streets subject to temporary restrictions of use plans. |
| Private means of access (path to HS1 railway line) from Thong Lane/Darnley Lodge Lane | Private means of access between points 6/Y and 6/Z on sheet 4 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Thong Lane/Darnley Lodge Lane to drainage pond and land north of HS1 railway line. | Private means of access between points 6/AJ on sheet 4 and 6/AO on sheet 6 and between points 6/AK, 6/AL, 6/AM and 6/AN as shown on sheets 4 and 6 of the streets subject to temporary restrictions of use plans. |
| Halfpence Lane | Section of highway between points 12/A on sheet 4 and 12/B on sheet 5 of the streets subject to temporary restrictions of use plans. |
| NS311 | Section of byway between points 6/N on sheet 4 and 6/Y on sheet 5 of the streets subject to temporary restrictions of use plans. |
| Permissive path in Jeskyns Community Woodland | Section of permissive path between points 6/V and 6/O as shown on sheet 5 of the streets subject to temporary restrictions of use plans. |
| Footway/cycle track NCN177 | Section of cycle track between points 5/I on sheet 4 and 10/E on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Thong Lane/Darnley Lodge Lane | Section of highway between points 6/E and 6/B, between points 6/F and 6/E on sheet 4 and between points 6/G and 6/H on sheet 11 of the streets subject to temporary restrictions of use plans. |
| Access (driveway) from Thong Lane to No. 37 Thong Lane | Section of private means of access at point 6/Y as shown on sheet 11 of the streets subject to temporary restrictions of use plans. |
| Access (driveway) from Thong Lane to The Bungalow | Private means of access at point 6/Z as shown on sheet 11 of the streets subject to temporary restrictions of use plans. |
| NS179 | Section of footpath between points 4/C on sheet 3 and 4/K on sheet 4 of the streets subject to temporary restrictions of use plans. |
| NS367 | Section of footpath between points 8/O and 8/N as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NS177 | Section of footpath between points 6/O on sheet 5 and 8/U on sheet 6, and between points 8/Q and 8/R on sheet 6 as shown on sheets 5 and 6 of the streets subject to temporary restrictions of use plans. |
| Permissive path through Jeskyns Community Woodland | Section of permissive path between points 8/U and 8/Y on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Section of permissive path in Jeskyns Community Woodland known as the Horse Trail | Section of permissive path between points 6/AF and 6/AG as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Jeskyns Community Woodland car park access road (parking aisle) | Section of car park access between points 8/Y and 8/H as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NG17 | Section of footpath between points 10/F and 10/E as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NS174 | Section of footpath between points 6/U and 6/P as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NS167 | Section of footpath between points 6/P and 6/Q as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NS175 | Section of footpath between points 8/S and 8/T as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| A2 westbound off-slip to Cobham services | Section of highway between points 7/A and 7/B as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Cobham services access road | Private means of access between points 7/B and 7/C as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Slip road from Cobham services to A2 westbound off-slip to Gravesend East (Marling Cross) junction south roundabout | Section of highway between points 7/C and 7/D as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Private means of access from A2 eastbound to balancing pond | Private means of access between points 7/E and 7/F as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Private means of access from A2 eastbound | Private means of access between points 7/G and 7/H as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| A2 westbound off-slip to Gravesend East (Marling Cross) junction south roundabout | Section of highway between points 2/C and 2/D as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Gravesend East junction south roundabout to Henhurst Road | Section of highway between points 8/C and 8/B as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Private means of access to electricity substation | Private means of access between points 8/AB and 8/Z as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Private means of access to electricity substation | Private means of access between points 8/AC and 8/AD as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Henhurst Road | Section of highway between points 8/A and 8/P as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Henhurst Road | Section of highway between points 8/E and 8/M as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Gravesend East junction south roundabout to A2 westbound | Section of highway between points 8/D and 8/G as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Gravesend East junction north roundabout to Gravesend East junction south roundabout | Section of highway including roundabouts and Marling Cross overbridge between points 8/D and 10/A as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| A2 eastbound to Gravesend East junction north roundabout | Section of highway between points 10/B and 10/A as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Gravesend East junction north roundabout to Hever Court Road | Section of highway between points 9/A and 10/A as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Hever Court Road/Valley Drive roundabout to A2 eastbound | Section of highway between points 2/F and 2/G as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Gravesend East junction north roundabout to Hever Court Road/Valley Drive roundabout | Section of highway between points 10/A and 2/F as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Valley Drive | Section of highway between points 2/F and 2/AG as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NS175A (Church Road to Hever Court Road including footbridge) | Section of footpath between points 8/F and 9/B as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NS365 | Section of footpath between points 9/C and 9/D as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Footway/cycle track NCN177 | Section of cycle track between—
of the streets subject to temporary restrictions of use plans. |
| Private means of access from Hever Court Road to balancing pond | Private means of access between points 10/D and 10/E as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NU48 | Section of footpath at point 9/H (junction with NCN177) as shown on sheet 8 of the streets subject to temporary restrictions of use plans. |
| Roman Road | Section of highway between points 8/I and 8/K as shown on sheet 8 of the streets subject to temporary restrictions of use plans. |
| Pepper Hill | Section of highway between points 8/K and 8/J as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| Footway/cycle track along B262 Hall Road, north of cycle track NCN177 | Section of footway/cycle between points 9/J and 51/C on sheet 8 of the streets subject to temporary restrictions of use plans. |
| Church Road | Section of highway between points 8/W and 8/X as shown on sheet 6 of the streets subject to temporary restrictions of use plans. |
| NS169 | Section of footpath between points 6/X on sheet 6 and 6/W on sheet 11 of the streets subject to temporary restrictions of use plans. |
| NU29 (footbridge to Roman Road) | Section of footpath between points 49/A and 49/B as shown on sheet 7 of the streets subject to temporary restrictions of use plans. |
| A2/A227 junction roundabout link (Wrotham Road) | Section of highway between points 50/A and 50/B as shown on sheet 7 of the streets subject to temporary restrictions of use plans. |
| Wrotham Road junction to A2 eastbound | Section of highway between points 50/C and 50/D as shown on sheet 7 of the streets subject to temporary restrictions of use plans. |
| Wrotham Road | Section of highway between points 50/E and 50/F as shown on sheet 7 of the streets subject to temporary restrictions of use plans. |
| Gravesend Road/Rochester Road (A226) | Section of highway as shown on sheets 9, 12, 13 and 14 between points 70/B on sheet 9 and 70/A on sheet 14 of the streets subject to temporary restrictions of use plans. |
| NG9 and NS165 (Muggins Lane) | Section of footpath as shown on sheets 10, 11 and 13 between points 6/AB on sheet 10 and 6/AA on sheet 13 of the streets subject to temporary restrictions of use plans. |
| Shorne Ifield Road | Section of highway between points 6/G and 6/J and from point 6/K and 6/L on sheet 11 of the streets subject to temporary restrictions of use plans. |
| NG8 | Section of footpath between points 6/R on sheet 11 and 6/S on sheet 13 of the streets subject to temporary restrictions of use plans. |
| NG7 and NS164 | Section of footway between point 6/AC and 6/AD and from points 6/T and 6/AE as shown on sheet 13 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Gravesend Road | Private means of access between points 56/H and 56/G as shown on sheet 13 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Gravesend Road | Private means of access between points 56/F and 56/E as shown on sheet 13 of the streets subject to temporary restrictions of use plans. |
| Lower Higham Road | Section of highway between points 56/A and 56/B as shown on sheet 14 of the streets subject to temporary restrictions of use plans. |
| NG3 | Section of footpath between points 56/C and 56/D as shown on sheet 14 of the streets subject to temporary restrictions of use plans. |
| NG2 (Thames and Medway Canal)/Cycle track and private means of access from Norfolk Road to Canal Road | Section of cycle track/footpath and private means of access between points 55/A and 55/B as shown on sheet 15 of the streets subject to temporary restrictions of use plans. |
| FP146 (Two Forts Way) | Section of footpath between points 52/C and 52/D as shown on sheet 16 of the streets subject to temporary restrictions of use plans. |
| Tilbury marsh access | Section of highway between point 52/E and 52/F as shown on sheet 16 of the streets subject to temporary restrictions of use plans. |
| A1089 St Andrews Road/Ferry Road | Section of highway between points 52/A and 52/B as shown on sheet 18 the streets subject to temporary restrictions of use plans. |
| Fort Road (Infrastructure Corridor) | Section of highway between points 52/B on sheet 18 and 21/D on sheet 21 and between points 53/C and 53/D on sheet 21, as shown on sheets 17, 18 and 21 of the streets subject to temporary restrictions of use plans. |
| FP51 | Section of footpath between points 14/E on sheet 19 and 14/F on sheet 22 of the streets subject to temporary restrictions of use plans. |
| FP200 | Section of footpath between points 14/D on sheet 20 and 14/C on sheet 23 of the streets subject to temporary restrictions of use plans. |
| Love Lane | Section of highway between points 14/B and 14/J as shown on sheet 22 of the streets subject to temporary restrictions of use plans. |
| Station Road/Church Road | Section of highway as shown on sheets 22 and 23 between points 14/B on sheet 22 and 14/A on sheet 23 and between points 14/x and 14/y on sheet 23 of the streets subject to temporary restrictions of use plans. |
| Coopers Shaw Road | Section of highway between points 14/H and 14/G as shown on sheet 23 of the streets subject to temporary restrictions of use plans. |
| Gun Hill | Section of highway between points 14/K and 14/L as shown on sheet 23 of the streets subject to temporary restrictions of use plans. |
| Coal Road (BR58) | Private means of access and bridleway as shown on sheets 22, 23 and 24 between points 16/F on sheet 22 and 16/C on sheet 24 of the streets subject to temporary restrictions of use plans. |
| FP67 | Section of footpath between points 16/L and 16/M as shown on sheet 23 the streets subject to temporary restrictions of use plans. |
| Low Street Lane | Section of highway between points 16/E on sheet 23 and 16/A on sheet 24 of the streets subject to temporary restrictions of use plans. |
| Coal Road (BR63) | Section of bridleway between points 16/B and 16/H as shown on sheet 24 of the streets subject to temporary restrictions of use plans. |
| FP61 | Section of footpath between points 16/C and 16/K on sheet 24 of the streets subject to temporary restrictions of use plans. |
| FP60 | Section of footpath between points 15/H and 16/J on sheet 24 of the streets subject to temporary restrictions of use plans. |
| FP66 | Section of footpath between points 16/H and 15/G as shown on sheet 24 of the streets subject to temporary restrictions of use plans. |
| Muckingford Road | Section of highway between points 15/F on sheet 24 and 15/E sheet 25 of the streets subject to temporary restrictions of use plans. |
| Hoford Road | Section of highway between points 18/C on sheet 24 and 18/B on sheet 27 of the streets subject to temporary restrictions of use plans. |
| Linford Road | Section of highway between points 15/E and 15/J as shown on sheet 25 of the streets subject to temporary restrictions of use plans. |
| FP74 | Section of highway between points 15/K and 15/L as shown on sheet 25 of the streets subject to temporary restrictions of use plans. |
| Brentwood Road | Section of highway as shown on sheets 25, 26, 28 and 32 between points 20/G on sheet 25 and 20/D on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Chadwell Hill | Section of highway between points 20/H and 20/G on sheet 25 of the streets subject to temporary restrictions of use plans. |
| Marshfoot Road | Section of highway between points 20/C and 20/H on sheet 25 of the streets subject to temporary restrictions of use plans. |
| Marshfoot Road redundant spur north | Section of highway between points 20/J and 20/K on sheet 25 of the streets subject to temporary restrictions of use plans. |
| BR112 | Section of bridleway between points 58/A and 58/B as shown on sheet 26 of the streets subject to temporary restrictions of use plans. |
| FP108 | Section of footpath between points 59/A and 59/B as shown on sheet 26 of the streets subject to temporary restrictions of use plans. |
| Buckingham Hill Road | Section of highway between points 27/A to 27/M as shown on sheet 27 of the streets subject to temporary restrictions of use plans. |
| A1089 southbound (Dock Approach Road) | Section of highway as shown on sheets 26, 29 and 33 between points 29/J on sheet 26 and 29/M on sheet 33 of the streets subject to temporary restrictions of use plans. |
| A1013 (Stanford Road) | Section of highway as shown on sheets 26, 29 and 32 between points 23/A on sheet 26 and 23/E on sheet 32 of the streets subject to temporary restrictions of use plans. |
| A1089 northbound (Dock Approach Road) to A13 eastbound slip road | Section of highway as shown on sheets 26, 29 and 33 between points 29/H on sheet 26 and 29/E on sheet 29 of the streets subject to temporary restrictions of use plans. |
| High House Lane | Private means of access between points 19/D and 19/E and between points 19/F and 19/C as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| Private means of access between Brentwood Road and FP79 | Private means of access between points 20/B and 19/G as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| FP95 | Section of footpath between points 21/B and 20/A as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| FP78 | Section of footpath between points 20/A and 19/D as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| FP107 | Section of footpath between points 22/G and 22/H as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| Hornsby Lane | Section of highway as shown on sheets 28, 29 and 32 between points 22/E on sheet 29 and 22/C on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Heath Place | Private means of access between points 22/L and 22/M as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Hornsby Lane to north of Heath Place | Private means of access between points 22/N and 22/O as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Hornsby Lane (land to west of Hornsby Lane) | Private means of access at point 22/P as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| FP79 | Section of footpath between points 21/A on sheet 28 and 21/C on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Private means of access | Private means of access between points 21/A and 19/G as shown on sheet 28 of the streets subject to temporary restrictions of use plans. |
| Access road from Brentwood Road to Orsett Golf Club and Collingwood Farm | Private means of access between points 20/F on sheet 27 and 20/E on sheet 32 as shown on sheets 27 and 32 of the streets subject to temporary restrictions of use plans. |
| Heath Road | Section of highway between points 24/A and 24/D and from point 24/C and 24/E as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| Gammonfields Way | Private means of access between points 25/A and 25/J and 25/C as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| Gammonfields Way bridleway (bridleway BR223) | Section of bridleway BR223 and permissive bridleway connecting to A1013, between points 25/A and 25/D as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| Long Lane | Section of highway between points 25/D and 25/E as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| Woolings Close | Section of highway between points 28/A and 28/B as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| Neville’s Field access road | Section of highway between points 31/A and 31/B as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| A1089 northbound to A13 westbound slip road | Section of highway between points 29/K and 29/L as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| FP97 | Section of footpath between points 25/F and 25/G as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| A13 westbound to A1089 southbound | Section of highway between points 26/A and 26/B as shown on sheet 29 of the streets subject to temporary restrictions of use plans. |
| Blackshots Lane | Section of highway between points 32/E on sheet 30 and 32/F on sheet 34 of the streets subject to temporary restrictions of use plans. |
| High Road, North Stifford | Section of highway between points 32/N and 32/O on sheet 30 of the streets subject to temporary restrictions of use plans. |
| Stifford Clays Road north of High Road, North Stifford | Section of highway between points 32/H and 32/G as shown on sheet 30 of the streets subject to temporary restrictions of use plans. |
| A1013 Stanford Road | Section of highway between points 31/C and 31/D as shown on sheet 31 of the streets subject to temporary restrictions of use plans. |
| A13 westbound | Section of highwayas shown on sheets 29, 31, 32 and 33 between points 29/C on sheet 31 and 29/D on sheet 33 of the streets subject to temporary restrictions of use plans. |
| A13 eastbound | Section of highwayas shown on sheets 29, 31, 32 and 33 between points 29/B on sheet 31 and 29/A on sheet 33 of the streets subject to temporary restrictions of use plans. |
| Permissive bridleway between Mill Lane and Baker Street | Section of permissive bridleway between Mill Lane and Baker Street as shown on sheets 29, 32 and 33 between points 31/B on sheet 29 and 22/J on sheet 32 of the streets subject to temporary restrictions of use plans. |
| FP105 | Section of footpath between points 21/F and 21/G as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Private means of access from A1013 to industrial premises | Private means of access between points 23/J and 23/H on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Private means of access from A1013 to Five Chimney Cottages | Private means of access between points 27/Q and 27/R on sheet 29 of the streets subject to temporary restrictions of use plans. |
| Private means of access from A1013 to Whitecroft Care Home | Private means of access between points 27/S and 27/T on sheet 29 of the streets subject to temporary restrictions of use plans. |
| B188 Baker Street | Section of highway between—
of the streets subject to temporary restrictions of use plans. |
| BR219 | Section of bridleway as shown on sheets 30, 35, 38 and 42 between points 61/A and 61/B on sheet 30, between points 61/C and 61/D on sheet 35 and between points 61/E on sheet 35 and 61/F on sheet 41 of the streets subject to temporary restrictions of use plans. |
| Rectory Road | Section of highway between points 23/F and 23/G on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Private means of access to field off Rectory Road | Private means of access between points 23/K and 23/L on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Orsett Cock roundabout | Section of highway comprising entire roundabout at point 44/Q as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| A13 westbound entry slip road from Orsett Cock Roundabout | Section of highway between points 44/A and 29/F as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| A13 eastbound exit slip road to Orsett Cock Roundabout | Section of highway between points 29/G and 44/B as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Orsett Cock Roundabout to Brentwood Road northbound | Section of highway between points 44/C and 44/D as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Brentwood Road southbound to Orsett Cock Roundabout | Section of highway between points 44/D and 44/E as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| A13 eastbound entry slip road from Orsett Cock Roundabout | Section of highway between points 44/H and 44/E and between points 44/K and 44/J as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| A13 westbound exit slip road to Orsett Cock Roundabout | Section of highway between points 44/F and 44/G as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Stanford Road east of Orsett Cock roundabout (exit from Orsett Cock Roundabout) | Section of highway between points 44/M and 44/L as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Stanford Road east of Orsett Cock roundabout (entry to Orsett Cock Roundabout) | Section of highway between point 44/P and 44/N as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| FP104 | Section of footpath between points 32/C and 32/D as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Brentwood Road redundant spur north (layby south of Lofthall Farm) | Section of highway between points 32/A and 32/B as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Private means of access from A1013 Stanford Road to Potash Cottages | Private means of access between points 27/U and 27/V as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Mill Lane | Private means of access between points 22/C and 22/F and from point 22/J and 22/K as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| Bridleway BR206 (Mill Lane) | Section of bridleway between points 22/J and 22/K as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| FP82 | Section of footpath between points 60/E and 60/F as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| FP93 | Section of footpath between points 60/G and 60/H as shown on sheet 32 of the streets subject to temporary restrictions of use plans. |
| FP96 | Section of footpath between points 60/C and 60/D as shown on sheet 33 of the streets subject to temporary restrictions of use plans. |
| FP207 | Section of footpath between points 60/A and 60/B as shown on sheet 33 of the streets subject to temporary restrictions of use plans. |
| High Road B188 | Section of highway between points 27/J and 27/L on sheet 33 the streets subject to temporary restrictions of use plans. |
| Private means of access from Stifford Clays Road to Baker Street Mills (1) | Private means of access between points 27/O and 27/N as shown on sheet 33 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Stifford Clays Road to Baker Street Mills (2) | Private means of access between points 27/M and 27/P as shown on sheet 33 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Stifford Clays Road opposite Springfield Farm | Private means of access between points 27/W and 27/X as shown on sheet 33 of the streets subject to temporary restrictions of use plans. |
| Stifford Clays Road | Section of highway between points 27/J on sheet 33 and 32/D on sheet 34 of the streets subject to temporary restrictions of use plans. |
| Green Lane south of gas distribution centre | Section of bridleway and private means of access between points 32/L and 32/M as shown on sheet 34 of the streets subject to temporary restrictions of use plans. |
| A13 (verge on eastbound carriageway) | Section of highway verge between points 32/J and 32/K as shown on sheet 34 of the streets subject to temporary restrictions of use plans. |
| Fen Lane | Section of highway between points 27/J and 33/E and and 27/K on sheet 33 of the streets subject to temporary restrictions of use plans. |
| Green Lane | Section of highway between points 33/E and 33/D on sheet 33 of the streets subject to temporary restrictions of use plans. |
| Green Lane west of Hobletts private access track | Section of bridleway and private means of access between points 33/D on sheet 33 and 33/C on sheet 34 of the streets subject to temporary restrictions of use plans. |
| Hobletts private access track (Green Lane) | Private means of access between points 33/D on sheet 33 and 33/G on sheet 35 of the streets subject to temporary restrictions of use plans. |
| Medebridge Road and Mollands Lane | Private means of access between points 34/A on sheet 34 and 36/P on sheet 36 of the streets subject to temporary restrictions of use plans. |
| Private means of access north of Fen Cottage | Private means of access between points 35/D and 35/E as shown on sheet 35 of the streets subject to temporary restrictions of use plans. |
| FP90 | Section of footpath between points 62/A and 62/B and between points 62/C and 62/D on sheet 35 of the streets subject to temporary restrictions of use plans. |
| FP136 | Section of footpath between—
of the streets subject to temporary restrictions of use plans. |
| Private means of access | Private means of access between points 33/F and 34/H as shown on sheet 38 of the streets subject to temporary restrictions of use plans. |
| FP151 | Section of footpath between points 35/C and 36/J as shown on sheet 39 of the streets subject to temporary restrictions of use plans. |
| FP135 | Section of footpath as shown on sheets 38, 39 and 41, between points 35/B on sheet 39 and 34/D on sheet 41 and between points 34/D and 34/L on sheet 41 of the streets subject to temporary restrictions of use plans. |
| Fen Lane, North Ockendon | Section of highway between points 34/L and 41/D as shown on sheet 41 of the streets subject to temporary restrictions of use plans. |
| B186 North Road and B186 Ockendon Road | Section of highway as shown on sheets 39 and 43, between points 35/A on sheet 39 and 38/C on sheet 43 of the streets subject to temporary restrictions of use plans. |
| FP259 | Section of footpath between points 63/A and 63/B as shown on sheet 40 of the streets subject to temporary restrictions of use plans. |
| FP210 | Section of footpath between points 36/E and 36/F and between points 36/G and 36/H as shown on sheet 40 of the streets subject to temporary restrictions of use plans. |
| M25 northbound | Section of highway as shown on sheets 40, 43, 44, 45, 46, 47, 48, 49 and 50, between points 37/A on sheet 40 and 37/B on sheet 49 of the streets subject to temporary restrictions of use plans. |
| M25 southbound | Section of highwayas shown on sheets 40, 43, 44, 45, 46, 47, 48, 49 and 50, between points 37/D on sheet 40 and 37/C on sheet 49 of the streets subject to temporary restrictions of use plans. |
| FP254 | Section of footpath between points 36/J on sheet 39 and 36/B on sheet 42 of the streets subject to temporary restrictions of use plans. |
| FP252 | Section of footpath between points 36/A and 36/D as shown on sheet 42 of the streets subject to temporary restrictions of use plans. |
| FP251 | Section of footpath between points 38/A and 38/L and between points 38/B to 38/M as shown on sheet 42 of the streets subject to temporary restrictions of use plans. |
| FP231 | Section of footpath between points 38/M and 38/N as shown on sheet 42 of the streets subject to temporary restrictions of use plans. |
| Ockendon Road B1421 | Section of highway between points 38/D on sheet 42 and 38/C on sheet 43 of the streets subject to temporary restrictions of use plans. |
| Pea Lane | Section of highway between points 38/E and 38/F on sheet 42 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Ockendon Road to Thames Chase Forest | Private means of access between points 38/J and 38/K as shown on sheet 43 of the streets subject to temporary restrictions of use plans. |
| FP230 | Section of footpath between points 39/B on sheet 42 and 39/G on sheet 43 and between points 39/G and 39/A on sheet 43 of the streets subject to temporary restrictions of use plans. |
| Permissive path in Thames Chase Forest | Section of permissive path between points 39/G and 39/C as shown on sheet on 43 of the streets subject to temporary restrictions of use plans. |
| Permissive path in Thames Chase Forest | Section of permissive path between points 39/F and 39/D as shown on sheet on 43 of the streets subject to temporary restrictions of use plans. |
| Permissive path in Thames Chase Forest | Section of permissive path between points 39/E and 39/H as shown on sheet on 43 of the streets subject to temporary restrictions of use plans. |
| Pike Lane | Section of highway between points 38/G and 38/H as shown on sheet 43 of the streets subject to temporary restrictions of use plans. |
| Clay Tye Road B186 | Section of highway between points 38/C on sheet 43 and 43/C on sheet on 44 of the streets subject to temporary restrictions of use plans. |
| B186 Warley Street | Section of highway between points 66/E on sheet 44 and 65/N on sheet on 45 of the streets subject to temporary restrictions of use plans. |
| Permissive path known as Thames Chase Culvert | Section of permissive path between points 43/F and 43/G as shown on sheet 44 of the streets subject to temporary restrictions of use plans. |
| BR289 | Section of bridleway and pedestrian/horse bridge at the southern end of the bridleway between points 43/D and 43/E as shown on sheet 44 of the streets subject to temporary restrictions of use plans. |
| St Marys Lane B187 | Section of highway between points 43/A and 43/B as shown on sheet 44 of the streets subject to temporary restrictions of use plans. |
| FP177 | Section of footpath between points 43/H and 43/I as shown on sheet 44 of the streets subject to temporary restrictions of use plans. |
| FP176 | Section of footpath between points 41/A and 41/B as shown on sheet 44 of the streets subject to temporary restrictions of use plans. |
| Codham Hall Lane | Private means of access between points 65/B and 37/S as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| BR183 | Section of bridleway between—
of the streets subject to temporary restrictions of use plans. |
| FP179 | Section of footpath between points 65/L and 65/M as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| Private means of access south of M25 junction 29 | Private means of access between points 65/A, 37/X and 37/R as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| Private means of access south of M25 junction 29 | Private means of access between points 37/X and 37/W on sheet 45 of the streets subject to temporary restrictions of use plans. |
| Private means of access from south-western quadrant of M25 junction 29 roundabout | Private means of access between points 37/U and 37/V on sheet 45 of the streets subject to temporary restrictions of use plans. |
| Private means of access to industrial estate | Private means of access between points 65/C and 65/D as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| M25 junction 29 roundabout | Section of highway comprising entire roundabout at point 37/T as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| M25 northbound exit slip road to M25 junction 29 roundabout | Section of highway between point 37/E and 37/N as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| A127 westbound entry slip road from M25 junction 29 roundabout | Section of highway between points 37/N and 37/F as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| Moor Lane | Section of highway between points 45/E and 45/F as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| A127 eastbound exit slip road to M25 junction 29 | Section of highway between points 37/G and 37/P as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| M25 southbound exit slip road to M25 junction 29 | Section of highway between points 37/Q on sheet 45 and 37/J on sheet 46 of the streets subject to temporary restrictions of use plans. |
| A127 eastbound entry slip road from M25 junction 29 | Section of highway between points 37/K and 37/Q on sheet 45 of the streets subject to temporary restrictions of use plans. |
| A127 westbound to M25 southbound slip road | Section of highway between points 37/L and 37/M as shown on sheet 46 of the streets subject to temporary restrictions of use plans. |
| Folkes Lane | Section of highway between points 45/G and 45/H on sheet 45 and between points 46/C and 46/D on sheet 46 of the streets subject to temporary restrictions of use plans. |
| Private means of access from Folkes Lane, north of Woodcroft Farm | Private means of access at point 46/E as shown on sheet 46 of the streets subject to temporary restrictions of use plans. |
| Folkes Lane Woodland Car Park Access Road and permissive path | Private means of access and permissive path between points 46/F and 46/G on sheet 46 of the streets subject to temporary restrictions of use plans. |
| FP180 | Section of footpath between points 66/D and 66/C and between points 66/A and 66/B as shown on sheet 45 of the streets subject to temporary restrictions of use plans. |
| A127 eastbound | Section of highway between points 45/B on sheet 45 and 45/A on sheet 46 of the streets subject to temporary restrictions of use plans. |
| A127 westbound | Section of highway between points 45/C on sheet 46 and 45/D on sheet 46 of the streets subject to temporary restrictions of use plans. |
| Permissive path next to Folkes Lane Woodland car park | Section of permissive path between points 46/H and 46/J on sheet 46 of the streets subject to temporary restrictions of use plans. |
| Permissive path to the east of Folkes Lane Woodland car park, leading to Folkes Lane footbridge over the M25 | Section of permissive path between points 46/F and 46/G on sheet 46 of the streets subject to temporary restrictions of use plans. |
| Folkes Lane Woodland car park access from Folkes Lane and permissive path from northern end of the car park | Section of permissive path between points 46/K and 46/L on sheet 46 of the streets subject to temporary restrictions of use plans. |
| Permissive path around the western and northern sides of Folkes Lane Woodland car park | Section of permissive path between points 46/M and 46/N on sheet 46 of the streets subject to temporary restrictions of use plans. |
| Folkes Lane footbridge over the M25 | Section of footpath between points 46/A and 46/B on sheet 46 of the streets subject to temporary restrictions of use plans. |
| BR186 | Section of bridleway between points 48/A and 48/B on sheet 48 of the streets subject to temporary restrictions of use plans. |
SCHEDULE 4 ¶
PERMANENT STOPPING UP OF STREETS AND PRIVATE MEANS OF ACCESS
Article 14
I317PART 1 HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED¶
(1) Highway to be stopped up | (2) Extent of stopping up | (3) New highway to be substituted |
|---|---|---|
| Park Pale | Existing section of public road between points 4/A and 4/B as shown on sheet 3 of the rights of way and access plans. | A new road between points 4/6, 4/4 and 4/10 and a new private means of access between points 4/1 and 4/2 as shown on sheet 3 of the rights of way and access plans. |
| Cycle track between Crutches Lane and Park Pale | Existing section of cycle track between points 4/E and 4/F as shown on sheet 3 of the rights of way and access plans. | A diverted cycle track between points 4/4 and 4/5 as shown on sheet 3 of the rights of way and access plans. |
| NS161 | Existing section of public right of way between points 4/C and 4/D on sheet 3 of the rights of way and access plans. | A diverted public right of way between points 4/8 and 4/9 as shown on sheet 3 of the rights of way and access plans. |
| Cycle track NCN177 (section south of the A2, between Three Clutches Slip Road and Park Pale Bridge) | Existing section of cycle track between points 11/A and 11/B on sheet 3 of the rights of way and access plans. | A diverted cycle track between points 11/1 and 11/7 on sheet 3 of the rights of way and access plans. |
| Cycle track NCN177 (section north of the A2, between Brewers Road, Thong Lane and Valley Drive) | Existing section of cycle track between points 5/B and 5/C on sheet 4 and between point 5/C on sheet 4 and point 5/D on sheet 6 and between points 5/D and 5/E on sheet 6 of the rights of way and access plans. | A footway/cycle/horse-riding track between points 5/13 and 5/20 and between points 5/19, 5/18, 5/17, 5/9, 12/3 and 6/11 on sheet 4 and a footway/cycle track between points 6/11 on sheet 4 and 9/1 on sheet 6 and between points 9/1, 9/2, 9/3, 8/4, 9/4, 6/30, 10/6 and 10/18 on sheet 6 of the rights of way and access plans. |
| A2 westbound | Existing section of public road, as shown on sheets 3, 4 and 6 between points 2/B on sheet 3 and 2/A on sheet 6 of the rights of way and access plans. | A new road as shown on sheets 3, 4, 6 and 7 between points 2/8 on sheet 3 and 2/1 on sheet 7 of the rights of way and access plans. |
| Brewers Road | Existing section of public road between points 5/A and 5/B as shown on sheet 4 of the rights of way and access plans. | A new bridge between points 5/1 and 5/2 as shown on sheet 4 of the rights of way and access plans. |
| Thong Lane/Darnley Lodge Lane | Existing section of public road, between points 6/A and 6/B as shown on sheet 4 of the rights of way and access plans. | A new road between points 6/1, 6/2 and 6/3 as shown on sheet 4 of the rights of way and access plans. |
| Henhurst Road | Existing section of public road between points 8/B and 8/C as shown on sheet 6 of the rights of way and access plans. | Henhurst Road between points 7/2 and 7/3, new roundabout on Henhurst Road at point 7/4, new road between Henhurst roundabout and Gravesend East junction south between points 8/6 and 8/8 and new roundabout alignment at point 8/1 as shown on sheet 6 of the rights of way and access plans. |
| Gravesend East junction south | Entire existing roundabout as shown at point 8/D on sheet 6 of the rights of way and access plans. | A new roundabout alignment at point 8/1 as shown on sheet 6 of the rights of way and access plans. |
| A2 westbound off-slip to Gravesend East junction south | Existing section of public road between points 2/C and 2/D as shown on sheet 6 of the rights of way and access plans. | A new road between points 2/39 and 8/8 as shown on sheet 6 of the rights of way and access plans. |
| Gravesend East junction north | Entire existing roundabout as shown at point 10/A on sheet 6 of the rights of way and access plans. | New roundabout alignment at point 10/1 as shown on sheet 6 of the rights of way and access plans. |
| NG17 | Existing section of public right of way between points 10/F and 10/G on sheet 6 of the rights of way and access plans. | A diverted public right of way between points 5/10 and 5/12 as shown on sheet 6 of the rights of way and access plans. |
| A2 eastbound | Existing section of public road as shown on sheets 3, 4 and 6 between points 2/H on sheet 3 and 2/E on sheet 6 of the rights of way and access plans. | A new road as shown on sheets 3, 4 and 6 between points 2/9 on sheet 3 and 2/5 on sheet 6 of the rights of way and access plans. |
| A2 eastbound on-slip from Valley Drive/Hever Court Road roundabout | Existing section of public road between points 2/F and 2/G as shown on sheet 6 of the rights of way and access plans. | A new road between points 2/12 and 2/13 as shown on sheet 6 of the rights of way and access plans. |
| NS167 | Existing section of public right of way between points 6/P and 6/Q as shown on sheet 6 of the rights of way and access plans. | A diverted public right of way between points 10/8 on sheet 6 and 10/12 on sheet 11, between points 10/12 and 6/12 on sheet 11, and between points 6/12 on sheet 11 and 6/32 on sheet 6 sheet of the rights of way and access plans. |
| NS174 | Existing section of public right of way between points 6/U and 6/S on sheet 6 of the rights of way and access plans. | A diverted public right of way between points 10/9 and 6/33 to join onto NG17 as shown on sheet 6 of the rights of way and access plans. |
| NS169 | Existing section of public right of way between points 6/AG on sheet 6 and 6/AF on sheet 11 of the rights of way and access plans. | A new public right of way between points 6/32 on sheet 6 and 6/12 on sheet 11 and between points 6/12, 10/12 and 10/21 on sheet 11 of the rights of way and access plans. |
| Thong Lane | Existing section of public road, between points 6/C and 6/D on sheet 11 of the rights of way and access plans. | A new road and bridge between points 6/5 and 6/6 on sheet 11 of the rights of way and access plans. |
| NG7 | Existing section of public right of way between points 6/AH and 6/AJ on sheet 13 of the rights of way and access plans. | A new public right of way between points 6/22, 6/20, 6/14, 6/15 and 6/31 as shown on sheet 13 of the rights of way and access plans. |
| NG8 | Existing section of public right of way between point 6/R on sheet 11 and point 6/AJ on sheet 13 of the rights of way and access plans. | A diverted public right of way between points 11/10 and 6/31 as shown on sheets 11 and 13 of the rights of way and access plans. |
| FP200 | Existing section of public right of way between point 14/G on sheet 20 and point 14/B on sheet 23 as shown on sheets 20 and 23 of the rights of way and access plans. | A new public right of way between points 14/6 and 14/5 as shown on sheets 20 and 23 of the rights of way and access plans. |
| FP61 | Existing section of public right of way between points 16/C and 16/N as shown on sheet 24 of the rights of way and access plans. | A new public right of way between points 16/1, 16/2 and 16/4 on sheet 23 and 24/6 on sheet 24 as shown on sheets 23 and 24 of the rights of way and access plans. |
| Coal Road (BR 58) | Existing section of public right of way between points 16/D on sheet 23 and 16/C as shown on sheets 24 of the rights of way and access plans. | A new public right of way between points 16/1 and 16/2 as shown on sheet 23 of the rights of way and access plans. |
| Muckingford Road | Existing section of public road, between points 15/A and 15/B on sheet 24 of the rights of way and access plans. | New roads between points 15/1 and 15/2, between points 15/3 and 15/4 and between points 15/5 and 15/6 as shown on sheet 24 of the rights of way and access plans. |
| Hoford Road | Existing section of public road, between points 18/A and 18/B on sheet 27 of the rights of way and access plans. | A new road between points 18/1 and 18/2 as shown on sheet 27 of the rights of way and access plans. |
| Brentwood Road | Existing section of public road, between points 20/A and 20/B on sheet 28 of the rights of way and access plans. | A new road between points 20/1 and 20/3 as shown on sheet 28 of the rights of way and access plans. |
| FP78 | Existing section of public right of way FP78 between points 19/K, 19/A and 19/H as shown on sheet 28 of the rights of way and access plans. | A new public right of way, running along the verge of the diverted High House Lane between points 19/1 and 19/2 as shown on sheet 28 of the rights of way and access plans. |
| FP79 | Existing section of public right of way FP79 between points 21/A and 21/B as shown on sheet 28 of the rights of way and access plans. | A new public right of way between points 21/2 and 21/4 as shown on sheet 28 of the rights of way and access plans. |
| A1013 (Stanford Road) | Existing section of public road, as shown on sheets 26, 29 and 32 between points 23/A on sheet 26 and 23/B on sheet 29 and between points 23/C and 23/J on sheet 32 sheet of the rights of way and access plans. | A new road as shown on sheets 26, 29 and 32 between points 23/4 on sheet 26 and 23/1 on sheet 32 sheet of the rights of way and access plans. |
| Gammonfields Way | Existing section of permissive bridleway and bridleway BR223 between points 25/A and 25/D as shown on sheet 29 of the rights of way and access plans. | A new highway with horse-riding track in the verge between points 25/1 and 25/2 as shown on sheet 29 of the rights of way and access plans. |
| Heath Road | Existing section of public road, between points 24/A and 24/B as shown on sheet 29 of the rights of way and access plans. | A new road between points 24/1 and 24/2 as shown on sheet 29 of the rights of way and access plans. |
| Access to Neville’s Field | Existing section of public road, between points 31/A and 31/C as shown on sheet 29 of the rights of way and access plans. | A new road between points 28/1 and 28/3 and a new private means of access between points 28/2 and 31/1 as shown on sheet 29 of the rights of way and access plans. |
| Permissive bridleway connecting to bridleway BR206 | Existing section of permissive bridleway, as shown on sheets 29, 32 and 33 between points 31/B on sheet 29 and 22/L on sheet 32 sheet of the rights of way and access plans. | A new public right of way as shown on sheets 29, 32 and 33 between points 28/2 on sheet 29 and 31/2 on sheet 32 of the rights of way and access plans. |
| FP82 | Existing section of public right of way, between points 23/E and 23/F as shown on sheet 32 of the rights of way and access plans. | A new public right of way between points 31/2 and A13 as shown on sheet 32 of the rights of way and access plans. |
| FP93 | Existing section of public right of way, between points 23/G and 23/H as shown on sheet 32 of the rights of way and access plans. | A new public right of way between points 31/2 and A13 as shown on sheet 32 of the rights of way and access plans. |
| A13 westbound off-slip to A1089 southbound | Existing section of public road, between points 26/A and 26/B as shown on sheet 29 of the rights of way and access plans. | A new road between points 29/6 on sheet 32 and 1/39 on sheet 29, as shown on sheets 29 and 32 of the rights of way and access plans. |
| Baker Street | Existing section of public road, between points 27/A to 27/B, 27/C to 27/D, 27/E to 27/F and 27/G to 27/H as shown on sheet 29 of the rights of way and access plans. | A new road between points 27/1 and 27/2 as shown on sheet 29 of the rights of way and access plans. |
| Orsett Cock junction to A13 westbound | Existing section of public road, between points 44/A and 29/F as shown on sheet 32 of the rights of way and access plans. | A new road between points 29/6 on sheet 32 and point 29/7 on sheet 29 as shown on sheets 29 and 32 of the rights of way and access plans. |
| A13 eastbound to Orsett Cock junction diverge | Existing section of public road, between points 29/G and 44/B as shown on sheet 32 of the rights of way and access plans. | A new road between points 30/1 and 32/13 as shown on sheet 32 of the rights of way and access plans. |
| Stifford Clays Road | Existing section of public road, between points 32/A and 32/B as shown on sheet 33 of the rights of way and access plans. | A new road between points 32/1 and 32/4 as shown on sheet 33 of the rights of way and access plans. |
| Green Lane (bridleway BR161) | Existing section of public right of way between points 33/A and 33/B as shown on Sheet 33 of the rights of way and access plans. | A new public right of way between points 33/1 and 33/4 as shown on sheet 33 of the rights of way and access plans. |
| BR219 | Existing section of public right of way, between point 33/C on sheet 35 and point 33/D on sheet 38 as shown on sheets 35 and 38 of the rights of way and access plans. | A new public right of way between points 33/5 on sheet 35 and 33/6 on sheet 38 as shown on sheets 35 and 38 of the rights of way and access plans. |
| FP136 | Existing section of public right of way, between points 34/A and 34/B as shown on sheet 38 of the rights of way and access plans. | A new public right of way between points 34/1 to 34/4 and between points 34/4 and 34/5 as shown on sheet 38 of the rights of way and access plans. |
| North Road | Existing section of public road, between points 35/A and 35/B as shown on sheet 39 of the rights of way and access plans. | A new road between points 35/1 to 35/4 as shown on sheet 39 of the rights of way and access plans. |
| FP252 | Existing section of public right of way, between points 36/A and 36/B as shown on sheet 42 of the rights of way and access plans. | A new public right of way extended from FP151 between points 36/3 on sheet 39 and 36/1 on sheet 42 as shown on sheets 39 and 42 of the rights of way and access plans. |
| FP251 | Existing section of public right of way, between points 38/P and 38/N as shown on sheet 42 of the rights of way and access plans. | A new public right of way between points 45/3 and 45/4 as shown on sheet 42 of the rights of way and access plans. |
| FP230 | Existing section of public right of way, between point 39/B on sheet 42 and point 39/A on sheet 43, as shown on sheets 42 and 43 of the rights of way and access plans. | A new public right of way between points 39/2, 39/3, 39/5 and 39/6 as shown on sheet 43 of the rights of way and access plans. |
| BR183 | Existing section of public right of way, between points 41/F and 41/G as shown on sheet 45 of the rights of way and access plans. | A new public right of way between points 37/28 and 37/29 as shown on sheet 45 of the rights of way and access plans. |
| M25 northbound off-slip to M25 junction 29 | Existing section of public road, between points 37/E and 37/N as shown on sheet 45 of the rights of way and access plans. | A new road as shown on sheets 42, 43, 44 and 45 between points 37/5 on sheet 42 and 37/16 on sheet 45 of the rights of way and access plans. |
| Footway in the highway verge of the M25 Junction 29 roundabout | Existing section of footway, between points 41/C and 41/D as shown on sheets 45 of the rights of way and access plans. |
as shown on sheet 45 of the rights of way and access plans. |
I318PART 2 HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS NOT TO BE PROVIDED¶
|
(1)
Highway to be stopped up
|
(2)
Extent of stopping up
|
|---|---|
| A2 westbound off-slip to Brewers Road (Halfpence Lane) roundabout | Existing section of public road between points 2/J and 2/K as shown on sheet 4 of the rights of way and access plans. |
| A2 westbound on-slip from Brewers Road (Halfpence Lane) roundabout | Existing section of public road between points 12/C and 12/D as shown on sheet 4 of the rights of way and access plans. |
| A2 westbound to Cobham services slip | Existing section of public road, between points 7/A and 7/B as shown on sheet 6 of the rights of way and access plans. |
| Street (cul-de-sac) off Henhurst Road | Existing section of public road between points 8/A and 8/H as shown on sheet 6 of the rights of way and access plans. |
| NS367 | Existing section of public right of way between points 8/A and 8/U as shown on sheet 6 of the rights of way and access plans. |
| Low Street Lane | Existing section of public road, between points 16/A and 16/B as shown on sheet 24 of the rights of way and access plans. |
| FP60 | Existing section of public right of way between points 15/E and 15/F as shown on sheet 24 of the rights of way and access plans. |
| Hornsby Lane | Existing section of public road, between points 22/A and 22/B as shown on sheet 28 of the rights of way and access plans. |
| Long Lane | Existing section of public right of way between points 25/D and 25/F as shown on sheet 29 of the rights of way and access plans. |
| FP97 | Existing section of public right of way between points 25/H and 25/I as shown on sheet 29 of the rights of way and access plans. |
| Bridleway BR206 | Existing section of public right of way between points 22/J and 22/D as shown on sheet 32 of the rights of way and access plans. |
| FP207 | Existing section of public right of way between points 31/D and 31/E as shown on sheet 33 of the rights of way and access plans. |
| FP251 | Existing section of public right of way between points 38/L and 38/M as shown on sheet 42 of the rights of way and access plans. |
| Layby on northern side of Ockendon Road to the west of FP230 and the M25 | Existing section of public road, between points 39/C and 39/D as shown on sheet 42 of the rights of way and access plans. |
I319PART 3 OTHER STREETS OR PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED¶
|
(1)
Street or private means of access to be stopped up
|
(2)
Extent of stopping up
|
(3)
New street or private means of access to be substituted
|
|---|---|---|
| Private means of access from Thong Lane to Inn on the Lake | Existing private means of access stopped up between points 6/E and 6/AK as shown on sheet 4 of the rights of way and access plans. | A new means of access between points 6/4 and 6/42 as shown on sheet 4 of the rights of way and access plans. |
| Private means of access from Henhurst road roundabout | Existing private means of access stopped up between points 8/L and 7/C shown on sheet 6 of the rights of way and access plans. | A new means of access between points 8/11 and 8/24 as shown on sheet 6 of the rights of way and access plans. |
| Private means of access from Henhurst road roundabout to National Rail | Existing private means of access stopped up between points 8/J and 8/Q as shown on sheet 6 of the rights of way and access plans. | A new means of access between points 8/5 and 8/23 as shown on sheet 6 of the rights of way and access plans. |
| Private means of access to drainage pond from Hever Court Road | Existing private means of access stopped between points 10/H and 10/K as shown on sheet 6 of the rights of way and access plans. | A new means of access between points 10/19 and 10/20 as shown on sheet 6 of the rights of way and access plans. |
| High House lane | Existing private means of access stopped up between points 19/A and 19/B and between point 19/C and 19/J as shown on sheet 28 of the rights of way and access plans. | New private means of access between points 19/1 and 19/2 and between points 19/3 and 19/5 as shown on sheet 28 of the rights of way and access plans. |
| Private means of access between Brentwood Road and FP79 | Existing private means of access stopped up between points 21/D and 21/E as shown on sheet 28 of the rights of way and access plans. | A new private means of access between points 20/2 and 21/4 as shown on sheet 28 of the rights of way and access plans. |
| Private means of access running alongside FP79 | Existing private means of access stopped up between points 21/A and 21/B as shown on sheet 28 of the rights of way and access plans. | New private means of access between points 21/1 and 21/5 and between points 20/2 and 21/4 as shown on sheet 28 of the rights of way and access plans. |
| Heath Road | Existing private mean of access, between points 24/C and 24/F as shown on sheet 29 of the rights of way and access plans. | A new private means of access between points 24/4 and 24/5 as shown on sheet 29 of the rights of way and access plans. |
| Gammonfields Way | Existing private means of access linking to bridleway BR223 between points 25/A, 25/J and 25/D as shown on sheet 29 of the rights of way and access plans. | A new highway with horse-riding track in the verge between points 25/1 and 25/2 as shown on sheet 29 of the rights of way and access plans. |
| Woolings Close | Existing private means of access, at point 28/A as shown on sheet 29 of the rights of way and access plans. | A new road between points 28/1 and 28/3 as shown on sheet 29 of the rights of way and access plans. |
| Private means of access to industrial premises off the A1013 east of Rectory Road | Existing private means of access, at point 23/D as shown on sheet 32 of the rights of way and access plans. | A new private means of access at point 23/6 as shown on sheet 32 of the rights of way and access plans. |
| Private means of access off Stifford Clays Road | Existing means of access, between points 32/C and 32/D as shown on sheet 33 of the rights of way and access plans. | A new private means of access between points 32/3, 32/6 and 32/5 as shown on sheet 33 of the rights of way and access plans. |
| Green Lane | Existing private means of access, between points 33/A and 33/B as shown on sheet 33 of the rights of way and access plans. | A new private means of access between points 33/1 and 33/4 as shown on sheet 33 of the rights of way and access plans. |
| Private means of access to pylon adjacent to M25 | Existing private means of access, between points 41/C and 41/E as shown on sheet 45 of the rights of way and access plans. | A new private means of access as shown on sheets 44 and 45 between points 41/4 and 41/5 on sheet 45 of the rights of way and access plans. |
I320PART 4 OTHER STREETS OR PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS NOT TO BE PROVIDED¶
|
(1)
Street or private means of access to be stopped up
|
(2)
Extent of stopping up
|
|---|---|
| Private means of access (path to HS1 railway line) from Thong Lane | Existing private means of access between points 6/F and 6/G as shown on sheet 4 of the rights of way and access plans. |
| Private means of access from Thong Lane to drainage pond and land north of HS1 railway line | Existing private means of access between points 6/H on sheet 4 and 6/I on sheet 6 and between points 6/J and 6/K and 6/L and 6/M as shown on sheets 4 and 6 of the rights of way and access plans. |
| Private means of access (field access) from Thong Lane | Existing private means of access at point 6/N as shown on sheet 4 of the rights of way and access plans. |
| Private means of access from Henhurst Road | Existing private means of access between points 8/I, 8/H and 8/K as shown on sheet 6 of the rights of way and access plans. |
| Private means of access to sub station | Existing private means of access at point 13/A as shown on sheet 6 of the rights of way and access plans. |
| Private means of access to drainage pond | Existing private means of access at point 13/B as shown on sheet 6 of the rights of way and access plans. |
| Private means of access (field access) from Muckingford Road near High Ash | Existing private means of access at point 15/O as shown on sheet 24 of the rights of way and access plans. |
| Private means of access (field access) from Heath Road | Existing private means of access at point 24/G as shown on sheet 29 of the rights of way and access plans. |
| Gammonfields Way | Existing private means of access between points 25/D and 25/B as shown on sheet 29 of the rights of way and access plans. |
| Mill Lane | Existing private means of access, between points 22/C and 22/K and between points 22/J and 22/D as shown on sheet 32 of the rights of way and access plans. |
| Private means of access from south-eastern quadrant of M25 junction 29 roundabout | Existing private means of access between points 41/H, 41/K and 41/J as shown on sheet 45 of the rights of way and access plans. |
SCHEDULE 5 ¶
CLASSIFICATION OF ROADS, ETC.
Article 15
I321PART 1 SPECIAL ROADS¶
|
(1)
Road
|
(2)
Extent
|
|---|---|
| M2 eastbound | Between points 2/6 and 2/9 as shown on sheet 1 of the classification of roads plans. |
| A289 southbound to M2 southbound | Between points 2/7 and 2/18 as shown on sheet 1 of the classification of roads plans. |
| M2 westbound | Between points 2/2 and 2/8 as shown on sheet 1 of the classification of roads plans. |
| M2 northbound to A289 northbound | Between points 2/2 and 2/31 as shown on sheet 1 of the classification of roads plans. |
| M25 northbound | Improved M25 northbound carriageway, between points 37/1 on sheet 4 and 37/2 on sheet 5, as shown on sheets 4 and 5 of the classification of roads plans. |
| M25 southbound | Improved M25 southbound carriageway, between points 37/3 on sheet 4 and 37/4 on sheet 5, as shown on sheets 4 and 5 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound to M25 northbound | Between points 1/9 and 37/7 as shown on sheet 4 of the classification of roads plans. |
| M25 northbound to M25 junction 29 link road | Between point 37/5 and 37/6 as shown on sheet 4 of the classification of roads plans. |
| M25 northbound on-slip at M25 junction 29 | Between points 37/17 and 37/10 as shown on sheet 5 of the classification of roads plans. |
| M25 southbound off-slip at M25 junction 29 | Between points 37/13 and 37/18 as shown on sheet 5 of the classification of roads plans. |
| M25 southbound on-slip at M25 junction 29 | Between points 37/19 and 37/12 as shown on sheet 5 of the classification of roads plans. |
I322PART 2 TRUNK ROADS¶
|
(1)
Road
|
(2)
Extent
|
|---|---|
| A2 eastbound | Between points 2/5 and 2/9 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound | Between points 2/1 and 2/8 as shown on sheet 1 of the classification of roads plans. |
| A2 eastbound Link road slip to Brewers Road | Between points 5/4 and 5/5 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound Link road slip to Cobham roundabout | Between points 2/20 and 2/40 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound to Cobham roundabout | Between points 2/3 and 2/39 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road roundabout to A2 eastbound | Between points 2/15 and 2/25 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to Gravesend East junction south | Between points 2/16 and 8/4 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to A2 westbound | Between points 2/16 and 2/21 as shown on sheet 1 of the classification of roads plans. |
| Brewers Road to A2 Eastbound link road | Between points 5/4 and 5/6 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound link road | Between points 2/19 and 2/10 as shown on sheet 1 of the classification of roads plans. |
| A2 eastbound link road | Between points 11/2 and 2/11 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road roundabout to A122 Lower Thames Crossing northbound link | Between points 2/15 and 1/3 as shown on sheet 1 of the classification of roads plans. |
| A2 eastbound to Gravesend East Junction north | Between points 2/5 and 10/15 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound | Between points 2/1 and 2/19 as shown on sheet 1 of the classification of roads plans. |
| A2 eastbound to A122 Lower Thames Crossing northbound link | Between points 2/17 and 1/2 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to A2 westbound link | Between points 1/1 and 2/16 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound link road to A122 Lower Thames Crossing northbound link | Between points 2/22 and 1/3 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound to A122 Lower Thames Crossing northbound link | Between points 2/24 and 1/5 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to A2 eastbound | Between points 1/4 and 2/13 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to A2 eastbound link road | Between points 1/1 and 11/2 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound entry slip road from Gravesend East junction south | Between points 8/9 and 2/34 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound | Between points 1/3 on sheet 1 and 37/6 on sheet 4, as shown on sheets 1, 2, 3 and 4 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound | Between points 1/4 on sheet 1 and 1/10 on sheet 4, as shown on sheets 1, 2, 3 and 4 of the classification of roads plans. |
| A13 westbound to A122 Lower Thames Crossing northbound and to A122 Lower Thames Crossing southbound | Between points 29/8 and 1/15 as shown on sheet 3 of the classification of roads plans. |
| A13 westbound to A122 Lower Thames Crossing southbound | Between points 1/15 and 1/16 as shown on sheet 3 of the classification of roads plans. |
| A13 westbound to A122 Lower Thames Crossing northbound, from diverge point with A13 westbound to A122 Lower Thames Crossing southbound | Between points 1/15 on sheet 3 and 1/31 on sheet 4, as shown on sheets 3 and 4 of the classification of roads plans. |
| A1089 northbound to A122 Lower Thames Crossing northbound | Between points 1/12 on sheet 3 and 1/14 on sheet 4, as shown on sheets 3 and 4 of the classification of roads plans. |
| A1089 northbound to A122 Lower Thames Crossing southbound | Between points 1/13 and 1/22 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound to Orsett Cock roundabout and A13 eastbound | Between points 1/18 and 29/5 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound and southbound to A13 eastbound | Between points 29/5 and 1/19 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound and southbound to the merge with the A13 eastbound link to Orsett Cock roundabout | Between points 29/5 and 1/20 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to Orsett Cock roundabout and A13 eastbound | Between points 1/23 and 1/24 as shown on sheet 3 of the classification of roads plans. |
| Orsett Cock roundabout to A1089 southbound | Between points 1/17 and 39/3 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound to M25 junction 29 northbound link road | Between points 1/9 and 37/6 as shown on sheet 4 of the classification of roads plans. |
| M25 northbound to M25 junction 29 link road | Between point 37/6 on sheet 4 and point 37/16 on sheet 5, as shown on sheets 4 and 5 of the classification of roads plans. |
| M25 northbound to A127 westbound dedicated off-slip | Between points 37/20 and 37/21 as shown on sheet 5 of the classification of roads plans. |
I323PART 3 GLA ROADS¶
|
(1)
Road
|
(2)
Extent
|
|---|---|
| M25 to A127 westbound link (A127 westbound entry slip road from M25 junction 29) | Between point 37/16 and 37/8 as shown on sheet 5 of the classification of roads plans. |
| A127 eastbound to M25 link (A127 eastbound exit slip road to M25 junction 29) | Between point 37/9 and 37/17 as shown on sheet 5 of the classification of roads plans. |
I324PART 4 CLASSIFIED ROADS¶
|
(1)
Road
|
(2)
Extent
|
|---|---|
| Brewers Road | Between points 5/1 and 5/4 as shown on sheet 1 of the classification of roads plans. |
| New local road between Cobham roundabout and Halfpence Lane roundabout | Between points 6/1 and 2/37 as shown on sheet 1 of the classification of roads plans. |
| New local road between Cobham roundabout and Henhurst Road roundabout | Between points 2/38 and 7/1 as shown on sheet 1 of the classification of roads plans. |
| Cobham roundabout | Length of road comprising entire roundabout at point 2/4 as shown on sheet 1 of the classification of roads plans. |
| Henhurst Road roundabout | Length of road comprising entire roundabout at point 7/4 as shown on sheet 1 of the classification of roads plans. |
| Henhurst Road | Between points 7/3 and 7/2 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction south roundabout | Length of road comprising entire roundabout at point 8/1 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction south roundabout to Henhurst roundabout | Between points 8/8 and 8/6 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction south roundabout to Gravesend East junction north roundabout | Between points 8/10 and 8/3 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction north roundabout | Length of road comprising entire roundabout at point 10/1 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road roundabout | Length of road comprising entire roundabout at point 10/16 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road to Gravesend East junction north | Between points 10/3 and 10/13 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction north roundabout to Hever Court Road roundabout | Between points 10/14 and 10/16 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road roundabout to Valley drive | Between points 10/17 and 10/2 as shown on sheet 1 of the classification of roads plans. |
| Thong Lane over A2 | Between points 6/2 and 6/3 as shown on sheet 1 of the classification of roads plans. |
| Thong Lane over A122 Lower Thames Crossing | Between points 6/5 and 6/6 as shown on sheet 1 of the classification of roads plans. |
| Muckingford Road | Between points 15/2 and 15/7 as shown on sheet 3 of the classification of roads plans. |
| Brentwood Road | Between points 20/1 and 20/3 as shown on sheets 3 of the classification of roads plans. |
| A1013 Stanford Road | Between points 23/4 and 23/1 as shown on sheet 3 of the classification of roads plans. |
| B188 Baker Street | Between points 27/1 and 27/2 as shown on sheet 3 of the classification of roads plans. |
| Orsett Cock roundabout to A13 westbound link | Between points 29/6 and 29/7 as shown on sheet 3 of the classification of roads plans. |
| A13 eastbound link to Orsett Cock roundabout | Between points 30/1 and 30/2 as shown on sheet 3 of the classification of roads plans. |
| Stifford Clays Road | Between points 32/1 and 32/4 as shown on sheets 3 of the classification of roads plans. |
| B186 North Road | Between points 35/1 and 35/4 as shown on sheet 4 of the classification of roads plans. |
| B1421 Ockendon Road | Between points 38/1 and 38/2 as shown on sheet 4 of the classification of roads plans. |
| M25 Junction 29 roundabout | Length of road comprising entire roundabout at point 37/15 as shown on sheet 5 of the classification of roads plans. |
| M25 southbound to A127 eastbound link | Between point 37/18 and 37/14 as shown on sheet 5 of the classification of roads plans. |
| A127 westbound to M25 southbound link | Between point 37/11 and 37/19 as shown on sheet 5 of the classification of roads plans. |
I325PART 5 UNCLASSIFIED ROADS¶
|
(1)
Road
|
(2)
Extent
|
|---|---|
| Park Pale | Between points 4/6 and 4/4 as shown on sheet 1 of the classification of roads plans. |
| Hoford Road | Between points 18/2 and 18/5 as shown on sheet 3 of the classification of roads plans. |
| Hornsby Lane | Between points 22/1 and 22/4 and between points 22/2 and 22/3 as shown on sheet 3 of the classification of roads plans. |
| Rectory Road | Between points 23/2 and 23/5 as shown on sheet 3 of the classification of roads plans. |
| Heath Road | Between points 24/1 and 24/2 as shown on sheet 3 of the classification of roads plans. |
| Gammonfields Way and Long Lane | Between points 25/1 and 25/2 as shown on sheet 3 of the classification of roads plans |
| Access roads off Muckingford Road | Between points 15/5 and 15/6, and between points 15/3 and 15/4, as shown on sheet 3 of the classification of roads plans. |
| Woolings Close | Between points 28/1 and 31/1 as shown on sheet 3 of the classification of roads plans. |
I326PART 6 OTHER PUBLIC RIGHTS OF WAY AND PERMISSIVE PATHS¶
|
(1)
Road
|
(2)
Extent
|
|---|---|
| Diverted footway/cycle track along Park Pale | Between points 4/4 and 4/5 as shown on sheet 3 of the rights of way and access plans. |
| Diverted footway/cycle track NCN177 | Between points 11/1 and 11/7 as shown on sheet 3 of the rights of way and access plans. |
| Footway/cycle track in the verge of Park Pale | Between points 11/7 and 11/3 and between points 11/4 and 11/9 as shown on sheet 3 of the rights of way and access plans. |
| Public footpath NS179, re-designated to bridleway | Between points 11/8 on sheet 3 and 5/14 on sheet 4, as shown on sheets 3 and 4 of the rights of way and access plans. |
| New bridleway between NS179 and Brewers Road | Between points 5/14 and 5/3 as shown on sheet 4 of the rights of way and access plans. |
| New footway/cycle/horse-riding track across Brewers Road bridge to form part of NCN177 | Between points 5/13 and 5/20 as shown on sheet 4 of the rights of way and access plans. |
| New footway/cycle/horse-riding track in the verge of Brewers Road to form part of NCN177, from west of Brewers Road bridge to Cobham Hall access road | Between points 5/19 and 5/18 as shown on sheet 4 of the rights of way and access plans. |
| Footway/cycle track redesignated to footway/cycle/horse-riding track in the verge of Brewers Road to form part of NCN177, from Cobham Hall access road to Halfpence Lane roundabout | Between points 5/17, 5/9, 12/3 and 6/11 as shown on sheet 4 of the rights of way and access plans. |
| Horse-riding track in the verge of Thong Lane | Between points 6/51 and 6/52 as shown on sheet 4 of the rights of way and access plans. |
| Footway/cycle/horse-riding track in the verge of Thong Lane | Between points 6/8 and 6/48 as shown on sheet 4 of the rights of way and access plans. |
| New section of cycle track east of Thong Lane connecting to footway/cycle/horse-riding track in the verge of Thong Lane | Between points 6/47 and 6/3 as shown on sheet 4 of the rights of way and access plans. |
| New section of cycle track west of Thong Lane connecting to new bridleway to the west of Thong | Between points 6/45 and 6/50 as shown on sheet 4 of the rights of way and access plans. |
| New bridleway to the west of Thong | Between points 6/49 on sheet 4 and /12 on sheet 11, as shown on sheets 4, 6 and 11 of the rights of way and access plans. |
| Bridleway link from Thong Lane to Darnley Trail | Between points 6/9 and 6/41 as shown on sheet 4 of the rights of way and access plans. |
| Footway/cycle track in the highway verge from Halfpence Lane roundabout to Valley Drive, to form part of NCN177 | Between points 6/11 on sheet 4 and 9/1 on sheet 6 and between points 9/1, 9/2, 9/3, 9/4, 6/30, 10/6 and 10/18 on sheet 6, as shown on sheets 4 and 6 of the rights of way and access plans. |
| Darnley Trail (permissive path) between Halfpence Lane roundabout and road leading to Scalers Hill House | Between points 6/11 and A11 as shown on sheet 4 of the rights of way and access plans. |
| Byway NS195 | Between points 6/44 and 6/46 as shown on sheet 4 of the rights of way and access plans. |
| Byway NS311 | Between points 6/46 on sheet 4 and 6/53 on sheet 5 as shown on sheets 4 and 5 of the rights of way and access plans. |
| Permissive path between NS311 and Jeskyns Community Woodland (overlaps with a section of footpath NS177) | Between point 6/53 on sheet 5 and point 8/21 and 8/22 on sheet 6, as shown on sheets 5 and 6 of the rights of way and access plans. |
| Section of improved public footpath NS177 | Between points 6/54 on sheet 5 and 6/56 on sheet 6 as shown on sheets 5 and 6 of the rights of way and access plans. |
| New bridleway between Jeskyns Community Woodland and Church Road | Between points 6/35 and 8/25 as shown on sheet 6 of the rights of way and access plans. |
| Public footpath NS175A re-designated to cycle track | Between points 8/26, 8/27, 8/28 and 10/4 as shown on sheet 6 of the rights of way and access plans. |
| Permissive path leading to Jeskyns Community Woodland car park | Between points 8/20 and 8/21 as shown on sheet 6 of the rights of way and access plans. |
| Footway/cycle track in the highway verge from Hever Court Road to Valley Drive | Between points 10/21, 10/5, 10/6 and 10/18 as shown on sheet 6 of the rights of way and access plans. |
| Cycle track between Hever Court Road and Valley Drive re-designated to bridleway | Between points 10/5 and 10/22 as shown on sheet 6 of the rights of way and access plans. |
| Public footpath NG17 (western end) extended and re-designated to bridleway from Valley Drive to NS174 | Between points 10/7 and 10/9 as shown on sheet 6 of the rights of way and access plans. |
| Bridleway from NG17 to NS169 | Between points 10/9 on sheet 6 and 10/10 on sheet 11, as shown on sheets 6 and 11 of the rights of way and access plans. |
| Bridleway NS174 diverted and replaced by a public footpath | Between points 10/9 and 6/33 as shown on sheet 6 of the rights of way and access plans. |
| Diverted public footpath NS167 | Between points 10/8 and 6/32 as shown on sheets 6 and 11 of the rights of way and access plans. |
| Section of diverted public footpath NS167 re-designated to bridleway | Between points 10/12 and 6/10 as shown on sheet 11 of the rights of way and access plans. |
| Public footpath NS169 re-designated to cycle track | Between points 10/10 and 10/11 as shown on sheet 11 of the rights of way and access plans. |
| Bridleway from public right of way NS169 to diverted public right of way NS167 | Between points 10/10 and 10/12 as shown on sheet 11 of the rights of way and access plans. |
| Bridleway on Thong Lane over the A122 Lower Thames Crossing bridge | Between points 6/6 and 6/12 as shown on sheet 11 of the rights of way and access plans. |
| Bridleway from Thong Lane over the A122 Lower Thames Crossing bridge to NG9 | Between points 6/5 on sheet 11 and 6/16 on sheet 13, as shown on sheets 11 and 13 of the rights of way and access plans. |
| Bridleway | Between points 6/14 and 6/17 as shown on sheet 13 of the rights of way and access plans. |
| Public footpath | Between points 6/13 and 6/18 as shown on sheet 13 of the rights of way and access plans. |
| Public footpath | Between points 6/19 and 6/20 as shown on sheet 13 of the rights of way and access plans. |
| Public footpath NG7 (north-western section) | Between points 6/21 and 6/22 as shown on sheet 13 of the rights of way and access plans. |
| Public footpath NG7 (central section replaced by a bridleway) | Between points 6/22 and 6/31 as shown on sheet 13 of the rights of way and access plans. |
| Footpath NG8 (northern section) redesignated to bridleway | Between points 6/31 and 6/55 as shown on sheet 13 of the rights of way and access plans. |
| New bridleway from A226 Rochester Road | Between points 6/23 and 6/15 as shown on sheet 13 of the rights of way and access plans. |
| New bridleway from A226 Gravesend Road to Shorne Ifield Road | Between points 6/24 on sheet 13 and 6/25 on sheet 11, as shown on sheets 11 and 13 of the rights of way and access plans. |
| New footway/cycle/horse-riding track in the verge of the A226 Gravesend Road | Between points 6/29 on sheet 12 and 6/28 on sheet 13, as shown on sheets 12 and 13 of the rights of way and access plans. |
| New bridleway between bridleway from the A226 Gravesend Road to Shorne Ifield Road and Thong Lane over the A122 Lower Thames Crossing bridge | Between points 6/27 and 6/26 as shown on sheet 11 of the rights of way and access plans. |
| Public footpath FP146 (Two Forts Way) redesignated to cycle track | Between points 14/7 and 14/12 as shown on sheet 16 of the rights of way and access plans. |
| New public footpath linking FP146 (Two Forts Way) to FP200 | Between points 14/8 on sheet 16 and 14/23 on sheet 20, as shown on sheets 16 and 20 of the rights of way and access plans. |
| New permissive path linking FP146 (Two Forts Way) to FP200 (branch off main path) | Between points 14/20 and 14/21 as shown on sheet 20 of the rights of way and access plans. |
| New permissive path link through Tilbury Fields | Between points 14/9 on sheet 16 and 14/19 on sheet 20, as shown on sheets 16 and 20 of the rights of way and access plans. |
| New public footpath linking Tilbury Fields to FP200 | Between points 14/10 on sheet 16 and 14/23 on sheet 20, and between points 14/19 and 14/22 on sheet 20, as shown on sheets 16 and 20 of the rights of way and access plans. |
| New permissive path linking Tilbury Fields to FP200 (branch off main path) | Between points 14/18 and 14/11 as shown on sheet 16 of the rights of way and access plans. |
| New permissive path linking Tilbury Fields to FP200 (branch off main path) | Between points 14/16 and 14/17 as shown on sheet 16 of the rights of way and access plans. |
| New permissive path linking FP146 (Two Forts Way) to the Tilbury Field earthwork | Between points 14/13 and 14/15 as shown on sheet 16 of the rights of way and access plans. |
| Eastern section of FP200 redesignated to bridleway | Between points 13/2 and 13/3 as shown on sheet 19 of the rights of way and access plans. |
| New bridleway connecting to FP200 | Between points 13/3 on sheet 19 and 14/23 on sheet 20 and between points 14/23 and 14/25 on sheet 20 as shown on sheets 19 and 20 of the rights of way and access plans. |
| Section of FP200 near (south of) Station Road redesignated to bridleway | Between points 14/25 on sheet 20 and 14/24 on sheet 23, as shown on sheets 20 and 23 of the rights of way and access plans. |
| New permissive path adjacent East Tilbury Battery | Between points 13/4 on sheet 19 and 13/6 on sheet 22 as shown on sheets 19 and 22 of the rights of way and access plans. |
| New bridleway link from southern end of FP200 to Station Road | Between points 13/3 on sheet 19 and 13/10 on sheet 22 as shown on sheets 19 and 22 of the rights of way and access plans. |
| New permissive path connecting FP147 to Princess Margaret Road | Between points 13/5 and 13/7 as shown on sheet 22 of the rights of way and access plans. |
| New permissive path link to Princess Margaret Road | Between points 13/8 and 13/9 as shown on sheet 22 of the rights of way and access plans. |
| New footway/cycle/horse-riding track in the verge of Station Road | Between points 13/11 on sheet 22 and 13/12 on sheet 23 as shown on sheets 22 and 23 of the rights of way and access plans. |
| New bridleway from FP200 to Station Road | Between points 14/6 and 13/13 as shown on sheet 23 of the rights of way and access plans. |
| Public footpath FP200 – diverted section | Between points 14/6 and 14/5 as shown on sheets 20 and 23 of the rights of way and access plans. |
| Public footpath FP200 – improved northern section | Between points 14/5 and A9 as shown on sheet 23 of the rights of way and access plans. |
| Bridleway BR58 (Coal Road) – diverted section | Between points 16/1 and 16/2 as shown on sheet 23 of the rights of way and access plans. |
| Bridleway BR58 (Coal Road) – improved section | Between points 16/2 and 16/4 as shown on sheet 23 of the rights of way and access plans. |
| Improved public footpath FP61 | Between points 16/3 and 24/6 as shown on sheet 24 of the rights of way and access plans. |
| Diverted public footpath FP61 (diversion to reconnect to BR58) | Between points 16/4 on sheet 23 and 24/6 on sheet 24 as shown on sheets 23 and 24 of the rights of way and access plans. |
| New footway/cycle track in the verge of Muckingford Road between Beechcroft Avenue and Blue Anchor Lane | Between points 15/10 and 24/7 as shown on sheet 24 of the rights of way and access plans. |
| New footway/cycle/horse-riding track in the verge of Muckingford Road and Linford Road between Blue Anchor Lane and Turnpike Lane | Between points 24/7 on sheet 24 and 24/8 on sheet 25, as shown on sheets 24 and 25 of the rights of way and access plans. |
| New footway/cycle track in the verge of Linford Road between Turnpike Lane and Atherton Gardens | Between points 24/8 and 15/7 as shown on sheet 25 of the rights of way and access plans. |
| Realigned public footpath FP78 re-designated to bridleway along new alignment (in the verge) of High House Lane | Between points 19/1 and 19/2 as shown on sheet 28 of the rights of way and access plans. |
| Public footpath FP95 re-designated to bridleway | Between points 21/1 and F2 as shown on sheet 28 of the rights of way and access plans. |
| New bridleway between FP95 and FP79 | Between points F2 and 21/2 as shown on sheet 28 of the rights of way and access plans. |
| Public footpath FP79 diverted and redesignated to bridleway | Between points 21/2 and 21/4 as shown on sheet 28 of the rights of way and access plans. |
| Public footpath FP79 re-designated to bridleway north of A122 Lower Thames Crossing | Between points 21/4 on sheet 28 and 21/3 on sheet 32, as shown on sheets 28 and 32 of the rights of way and access plans. |
| Footway/cycle track in the verge of the A1013 Stanford Road | Between points 23/7 on sheet 26 and 23/8 on sheet 32, as shown on sheets 26, 29 and 32 of the rights of way and access plans. |
| Gammonfields Way bridleway | Between points 25/1 and 25/2 as shown on sheet 29 of the rights of way and access plans. |
| New bridleway through Blackshots | Between points 28/6 on sheet 29 and 28/7 on sheet 33, as shown on sheets 29 and 33 of the rights of way and access plans. |
| New horse-riding track in the verge of the A1013 Stanford Road, between FP79 and A1013/Rectory Road junction | Between points 21/3 and 23/10 as shown on sheet 32 of the rights of way and access plans. |
| Footway/cycle track in the verge of Rectory Road | Between points 32/14 and 32/15 as shown on sheet 32 of the rights of way and access plans. |
| Horse-riding track in the verge of Rectory Road | Between points 32/14 and 23/11 as shown on sheet 32 of the rights of way and access plans. |
| Footway/cycle track in the verge of Baker Street | Between points 27/1 and 27/2 as shown on sheet 29 of the rights of way and access plans. |
| Bridleway between Mill Lane (bridleway BR206) and Neville’s Field/Woolings Close | Between points 28/2 on sheet 29 and 31/2 on sheet 32, as shown on sheets 29 and 32 of the rights of way and access plans. |
| Bridleway between Mill Lane (bridleway BR206) and Rectory Road | Between points 31/2 and A13 as shown on sheet 32 of the rights of way and access plans. |
| Footway/cycle track in the verge of Stifford Clays Road | Between points 32/1 and 32/4 as shown on sheet 33 of the rights of way and access plans. |
| Cycle track from Stifford Clays Road to Green Lane | Between points 32/2 and 32/16 as shown on sheet 33 of the rights of way and access plans. |
| Green Lane bridleway | Between points 33/1 and 33/4 as shown on sheet 33 of the rights of way and access plans |
| Bridleway from Green Lane to bridleway BR219 | Between points 33/2 on sheet 33 and 33/7 on sheet 35, as shown on sheets 33 and 35 of the rights of way and access plans. |
| Bridleway BR219 | Between points 33/7 on sheet 35 and 41/7 on sheet 41, as shown on sheets 35 and 41 of the rights of way and access plans. |
| Public footpath from FP136 to BR219 | Between points 34/6 and 33/5 as shown on sheet 38 of the rights of way and access plans. |
| Improved public footpath FP136 | Between points 34/6 and 34/1 as shown on sheet 38 of the rights of way and access plans. |
| Diverted public footpath FP136 | Between points 34/1 and 34/4 as shown on sheet 38 of the rights of way and access plans. |
| Public footpath FP136 re-designated to bridleway | Between points 34/5 on sheet 38 and 41/7 on sheet 41, as shown on sheets 38 and 41 of the rights of way and access plans. |
| Bridleway from FP135 to FP136 | Between points 34/5 on sheet 38 and 34/3 on sheet 41, as shown on sheets 38 and 41 of the rights of way and access plans. |
| Public footpath FP135 re-designated to bridleway | Between points G3 on sheet 39 and s34/3 on sheet 41, as shown on sheets 38, 39 and 41 of the rights of way and access plans. |
| Bridleway adjacent to B186 North Road | Between points 35/5 and 35/8 as shown on sheet 39 of the rights of way and access plans. |
| Footway/cycle/horse-riding track in the verge of the B186 North Road | Between points 35/8 and 35/6 as shown on sheet 39 of the rights of way and access plans. |
| Public footpath FP151 re-designated to bridleway | Between points 36/2 and 36/3 as shown on sheet 39 of the rights of way and access plans. |
| Public footpath FP254 re-designated to bridleway | Between points 36/3 on sheet 39 and 41/8 on sheet 42 as shown on sheets 39 and 42 of the rights of way and access plans. |
| Public footpath FP252 re-designated to bridleway | Between points 36/3 on sheet 39 and 36/1 on sheet 42 as shown on sheets 39 and 42 of the rights of way and access plans. |
| Diverted public footpath FP251 | Between points 45/3 and 45/4 as shown on sheet 42 of the rights of way and access plans. |
| Bridleway adjacent to Dennis Road | Between points 36/5 and 40/4 as shown on sheet 40 of the rights of way and access plans. |
| Footway/cycle/horse-riding track in the verge of Dennis Road/Dennises Lane | Between points 40/4 on sheet 40 and 36/4 on sheet 42 and between points 36/6 and 36/7 on sheet 42 as shown on sheets 40 and 42 of the rights of way and access plans. |
| Permissive path to the west of diverted public footpath FP230 | Between points 39/1 and 39/2 as shown on sheet 43 of the rights of way and access plans. |
| Diverted public footpath FP230 | Between points 39/2, 39/3, 39/5 and 39/7 as shown on sheet 43 of the rights of way and access plans. |
| Permissive path in Thames Chase Forest overlapping with diverted public footpath FP230 | Between points 39/2, 39/3, 39/5 and 39/7 as shown on sheet 43 of the rights of way and access plans. |
| Section of diverted public footpath FP230 re-designated to bridleway | Between points 39/6 and 39/7 as shown on sheet 43 of the rights of way and access plans. |
| Permissive path between diverted public footpath FP230 and bridleway connecting Clay Tye Road to FP230 | Between points 39/5 and 43/5 as shown on sheet 43 of the rights of way and access plans. |
| Bridleway connecting Clay Tye Road to diverted public footpath FP230 | Between points 43/5 and 39/4 as shown on sheet 43 of the rights of way and access plans. |
| New permissive path linking Thames Chase Forest Centre to BR289 | Between points 40/1 on sheet 43 and 43/3 and 43/4 on sheet 44 as shown on sheets 43 and 44 of the rights of way and access plans. |
| New permissive path connection to culvert by M25 | Between points 43/3 and 40/2 as shown on sheet 44 of the rights of way and access plans. |
| Bridleway BR183 (southern section, south of the M25) | Between points 41/1 on sheet 44 and 37/28 on sheet 45 as shown on sheets 44 and 45 of the rights of way and access plans. |
| Bridleway BR183 (diverted section, south of the M25) | Between points 37/28 and 37/29 as shown on sheet 45 of the rights of way and access plans. |
| Bridleway BR183 (northern section, south of the M25) | Between points 37/29 and 37/30 as shown on sheet 45 of the rights of way and access plans. |
| New bridleway to the north of existing bridleway BR183 | Between points 37/30 and 37/24 as shown on sheet 45 of the rights of way and access plans. |
| Footway/cycle track in the highway verge of the A127 westbound off-slip at the M25 junction 29 and in the highway verge of the A127 westbound | Between points 37/24 and 42/3 as shown on sheet 45 of the rights of way and access plans. |
| Bridleway link and footbridge across the A127 to BR183, east of the M25 junction 29 | Between points 45/8 and 45/7 as shown on sheet 45 of the rights of way and access plans. |
| Stairs to southern side of footbridge across the A127 | Between points 45/12 and 45/13 as shown on sheet 45 of the rights of way and access plans. |
| Cycle track between the footway/cycle track in the highway verge of the A127 westbound and the footbridge across the A127 | Between points 41/6 and 45/10 as shown on sheet 45 of the rights of way and access plans. |
| Cycle track between the footway in the highway verge of the A127 eastbound and the footbridge across the A127 | Between points 42/4 and 45/11 as shown on sheet 45 of the rights of way and access plans. |
| Cycle track (ramp) connecting to the footbridge across the A127 | Between points 45/11 and 45/21 as shown on sheet 45 of the rights of way and access plans. |
| Stairs to northern side of footbridge across the A127 | Between points 45/14 and 45/15 as shown on sheet 45 of the rights of way and access plans. |
| Footway/cycle track in the highway verge of the M25 junction 29 roundabout and A127 eastbound off-slip | Between points 37/25 and 37/26 as shown on sheet 45 of the rights of way and access plans. |
| Bridleway link and footbridge across the A127, west of the M25 junction 29 | Between points 45/5 and 45/6 as shown on sheet 45 of the rights of way and access plans. |
| Stairs to southern side of footbridge across the A127 | Between points 45/16 and 45/17 as shown on sheet 45 of the rights of way and access plans. |
| Stairs to northern side of footbridge across the A127 | Between points 45/19 and 45/20 as shown on sheet 45 of the rights of way and access plans. |
| Cycle track between the footway/cycle track in the highway verge of the A127 eastbound and the footbridge across the A127 west of the M25 junction 29 | Between points 45/9 and 45/18 as shown on sheet 45 of the rights of way and access plans. |
SCHEDULE 6 ¶
TRAFFIC REGULATION MEASURES
Article 16
I327PART 1 SPEED LIMITS¶
Note 1: Where roads are to become subject to the national speed limit as indicated in the column headed “speed limit” in this Part of this Schedule and as shown on the plans relating to this Schedule (the traffic regulation measures plans), speed limits are to apply in accordance with the applicable speed limit for such roads in accordance with the provisions of the 1984 Act and which are indicated in parenthesis for information only and such speed limits are not effected by article 16 (clearways, speed limits and prohibitions) of this Order.
Note 2: Where existing speed limits (to be retained) are shown in this Part of this Schedule or on the traffic regulation measures plans which relate to it, this is for information only and such speed limits are not subject to this Order.
Existing northbound lanes of the M2 between points 2/2 and 2/8 shown as dot and dashed magenta line on sheet 3 of the traffic regulation measures plans. Existing Variable Mandatory Speed Limit Existing southbound lanes of the M2 between points 2/29 and 2/6 shown as solid magenta line on sheet 3 of the traffic regulation measures plans. Existing National Speed Limit (70 miles per hour) M2 northbound to A289 northbound between points 2/33 and 2/31 shown as solid magenta line on sheet 3 of the traffic regulation measures plans. Existing National Speed Limit (70 miles per hour) A289 southbound to M2 southbound between points 2/7 and 2/18 shown as solid magenta line on sheet 3 of the traffic regulation measures plans. Existing National Speed Limit (70 miles per hour) A289 southbound to A2 westbound link road between points 2/28 and 2/27 shown as solid magenta line on sheet 3 of the traffic regulation measures plans. Existing National Speed Limit (70 miles per hour) Brewers Road to A2 eastbound link Road between points 5/6 and 5/4 shown as dashed light blue line on sheet 4 of the traffic regulation measures plans. 60 miles per hour A2 eastbound link road to Brewers Road between points 5/5 and 5/13 and between 5/13 and 5/4 shown as dashed light blue line on sheet 4 of the traffic regulation measures plans. 60 miles per hour A2 eastbound between points 2/29 on sheet 3 and 13/1 on sheet 6 shown as dashed red line on sheets 3, 4 and 6 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) A2 eastbound between points 13/1 on sheet 6 and 2/36 on sheet 7 shown as dot and dashed red line on sheets 6 and 7 of the traffic regulation measures plans. Variable Mandatory Speed Limit A2 westbound between points 2/8 on sheet 3 and 2/24 on sheet 4 shown as dot and dashed red line on sheets 3 and 4 of the traffic regulation measures plans. Variable Mandatory Speed Limit A2 westbound between points 2/24 on sheet 4 and 2/21 on sheet 6 shown as dashed red line on sheet 4 and 6 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) A2 link road eastbound between points 2/11 on sheet 3 and 2/17 on sheet 6 shown as dashed light blue line on sheets 3, 4 and 6 of the traffic regulation measures plans. 60 miles per hour A2 link Road westbound between points 2/27 on sheet 3 and 2/19 on sheet 6 shown as dashed light blue line on sheets 3, 4 and 6 of the traffic regulation measures plans. 60 miles per hour Brewers Road between points 5/7 and 5/8 shown as dashed green line on sheet 4 of the traffic regulation measures plans. 40 miles per hour Brewers Road to Halfpence Lane roundabout between points 5/12 and 5/9 shown as dashed green line on sheet 4 of the traffic regulation measures plans. 40 miles per hour Halfpence Lane roundabout entire circulatory carriageway starting and ending at point 12/2 shown as dashed green line on sheet 4 of the traffic regulation measures plans. 40 miles per hour Thong Lane between points 6/2 and 6/43 shown as dashed orange line on sheet 4 of the traffic regulation measures plans. 30 miles per hour Thong Lane between points 6/5 and 6/6 shown as dashed orange line on sheet 11 of the traffic regulation measures plans. 30 miles per hour Cobham roundabout entire circulatory carriageway starting and ending at point 2/4 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour New local road between Cobham roundabout and Halfpence Lane roundabout between points 6/1 on sheet 4 and 2/37 on sheet 6 shown as dashed green line on sheets 4 and 6 of the traffic regulation measures plans. 40 miles per hour New local road between Cobham roundabout and Henhurst roundabout between points 2/38 and 7/1 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour A2 westbound to Cobham roundabout between points 2/3 and 2/39 shown as dashed red line on sheet 6 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) Gravesend East junction southern roundabout entire circulatory carriageway starting and ending at point 8/1 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour Gravesend East junction south to A2 westbound between points 2/30 and 2/32 shown as dashed red line on sheet 6 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) Eastbound and westbound lanes between Henhurst Road roundabout and Gravesend East junction south between points 8/6 and 8/8 shown as dashed green lines on sheet 6 of the traffic regulation measures plans. 40 miles per hour A2 westbound link Road to A122 Lower Thames Crossing northbound between points 2/22 on sheet 4 and 1/5 on sheet 6 shown as dot and dashed red line on sheets 4 and 6 of the traffic regulation measures plans. Variable mandatory Speed limit A2 westbound to A122 Lower Thames Crossing northbound between points 2/24 on sheet 4 and 1/2 on sheet 6 shown as dot and dashed red line on sheets 4 and 6 of the traffic regulation measures plans. Variable mandatory Speed limit A122 Lower Thames Crossing southbound to A2 eastbound between points 2/25 on sheet 4 and 1/4 on sheet 11 shown as dashed red line on sheets 4, 6 and 11 of the traffic regulation measures plans. National Speed limit (70 miles per hour) A122 Lower Thames Crossing southbound to A2 eastbound link road between points 11/2 on sheet 4 and 1/4 on sheet 11 shown as dashed red line on sheets 4, 6 and 11 of the traffic regulation measures plans. National Speed limit (70 miles per hour) A2 westbound link road to Cobham roundabout between points 2/20 and 2/40 shown as dashed light blue line on sheet 6 of the traffic regulation measures plans. 60 miles per hour Henhurst Road between points 7/3 and 7/2 shown as dashed magenta line on sheet 6 of the traffic regulation measures plans. National Speed Limit (60 miles per hour) Henhurst Road roundabout entire circulatory carriageway starting and ending at point 7/4 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour A122 Lower Thames Crossing southbound to Gravesend East junction south roundabout between points 2/16 and 8/4 shown as dashed magenta line on sheet 6 of the traffic regulation measures plans. National Speed Limit (60 miles per hour) Gravesend East junction northern roundabout entire circulatory carriageway starting and ending at point 10/1 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour A2 eastbound to Gravesend East junction north between points 2/35 and 10/15 shown as solid magenta line on sheet 6 of the traffic regulation measures plans. Existing National Speed Limit (70 miles per hour) Northbound and southbound Lanes between Gravesend East junction north and Gravesend East junction south between points 8/10 and 8/3 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour Hever Court Road roundabout entire circulatory carriageway starting and ending at point 10/6 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour Hever Court Road between points 10/3 and 10/13 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour Gravesend East junction north roundabout to Hever Court Road roundabout between points 10/14 and 10/16 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour Valley Drive between points 10/17 and 10/5 shown as dashed green line on sheet 6 of the traffic regulation measures plans. 40 miles per hour Hever Court Road roundabout to A2 eastbound between points 2/15 and 2/13 shown as dashed orange line on sheet 6 of the traffic regulation measures plans. 30 miles per hour Hever Court Road roundabout to A122 Lower Thames Crossing northbound between points 2/14 on sheet 6 and 1/3 on sheet 11 shown as dot and dashed red line on sheets 6 and 11 of the traffic regulation measures plans. Variable mandatory Speed limit A2 eastbound to A122 Lower Thames Crossing northbound between points 13/1 and 2/17 shown as dot and dashed red line on sheet 6 of the traffic regulation measures plans. Variable mandatory Speed limit A2 eastbound to A122 Lower Thames Crossing northbound between points 2/17 and 1/2 shown as dot and dashed red line on sheet 6 of the traffic regulation measures plans. Variable mandatory Speed limit A2 eastbound to A122 Lower Thames Crossing northbound between points 1/2 on sheet 6 and 1/3 on sheet 11 shown as dot and dashed red line on sheets 6 and 11 of the traffic regulation measures plans. Variable mandatory Speed limit A122 Lower Thames Crossing southbound to A2 westbound between points 1/1 and 2/16 shown as dashed red line on sheet 6 of the traffic regulation measures plans. National Speed limit (70 miles per hour) A122 Lower Thames Crossing southbound to A2 westbound between points 2/16 and 2/41 shown as dashed magenta line on sheet 6 of the traffic regulation measures plans. National Speed Limit (60 miles per hour) A122 Lower Thames Crossing northbound between points 1/3 on sheet 11 and 1/9 on sheet 43 shown as dot and dashed red line on sheets 11, 13, 14, 15, 16, 20, 23, 24, 27, 28, 29, 33, 35, 38, 39, 42 and 43 of the traffic regulation measures plans. Variable mandatory Speed limit A122 Lower Thames Crossing southbound between points 1/4 on sheet 11 and 1/10 on sheet 43 shown as dot and dashed red line on sheets 11, 13, 14, 15, 16, 20, 23, 24, 27, 28, 29, 33, 35, 38, 39, 42 and 43 of the traffic regulation measures plans. Variable mandatory Speed limit Muckingford Road between points 15/8 and 15/2 shown as dashed dark blue line on sheet 24 of the traffic regulation measures plans. 50 miles per hour Brentwood Road between points 20/5 and 20/3 shown as dashed dark blue line on sheet 28 of the traffic regulation measures plans. 50 miles per hour Brentwood Road between points 20/1 and 20/5 shown as dashed orange line on sheet 28 of the traffic regulation measures plans. 30 miles per hour Hornsby Lane between points 22/2 and 22/3 and between 22/1 and 22/4 and between 22/5 and 22/6 shown as dashed magenta line on sheet 28 of the traffic regulation measures plans. National Speed Limit (60 miles per hour) A1013 (Stanford Road) between points 23/4 on sheet 26 and 23/6 on sheet 29 shown as dashed green line on sheets 26 and 29 and of the traffic regulation measures plans. 40 miles per hour A1013 (Stanford Road) between points 23/6 on sheet 29 and 23/1 on sheet 32 shown as dashed dark blue line on sheets 29 and 32 of the traffic regulation measures plans. 50 miles per hour Gammonfields Way between points 25/1 and 25/3 shown as dashed dark green line on sheet 29 of the traffic regulation measures plans. 20 miles per hour Long Lane between points 25/2 and 25/3 shown as dashed dark green line on sheet 29 of the traffic regulation measures plans. 20 miles per hour Heath Road between points 24/1 and 24/2 shown as dashed orange line on sheet 29 of the traffic regulation measures plans. 30 miles per hour B188 Baker Street between points 27/3 and 27/2 shown as dashed green line on sheet 29 of the traffic regulation measures plans. 40 miles per hour B188 Baker Street between points 27/1 and 27/3 shown as dashed orange line on sheet 29 of the traffic regulation measures plans. 30 miles per hour Rectory Road between points 23/2 and 23/5 shown as solid green line on sheet 32 of the traffic regulation measures plans. 40 miles per hour Orsett Cock roundabout to A1089 southbound between points 39/3 on sheet 29 and 1/17 on sheet 32 shown as dashed red line on sheets 29and 32 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) A13 westbound to A122 Lower Thames Crossing southbound between points 1/16 on sheet 28 and 1/15 on sheet 32 shown as dot and dashed red line on sheets 28, 29 and 32 of the traffic regulation measures plans. Variable Mandatory Speed limit A1089 northbound to A122 Lower Thames Crossing northbound and southbound between points 1/12 on sheet 29 and 1/13 on sheet 33 shown as dot and dashed red line on sheets 29 and 33 of the traffic regulation measures plans. Variable Mandatory Speed limit A1089 northbound to A122 Lower Thames Crossing southbound between point 1/13 and 1/22 shown as dot and dashed red line on sheet 33 of the traffic regulation measures plans. Variable Mandatory Speed limit A1089 northbound to A122 Lower Thames Crossing northbound between point 1/13 and 1/14 shown as dot and dashed red line on sheet 33 of the traffic regulation measures plans. Variable Mandatory Speed limit A122 Lower Thames Crossing northbound to A13 eastbound between points 1/19 on sheet 32 and 1/18 on sheet 29 shown as dashed red line on sheets 29 and 32 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) A122 Lower Thames Crossing to Orsett Cock roundabout between points 29/5 and 1/20 shown as dashed red line on sheet 32 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) A13 eastbound to Orsett Cock roundabout between points 30/1 and 30/2 shown as dashed red lined on sheet 32 of traffic regulation measures plans. National Speed Limit (70 miles per hour) Orsett Cock roundabout to A13 westbound between points 29/6 on sheet 32 and 29/7 on sheet 29 shown as dashed red line on sheets 29 and 32 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) Orsett Cock roundabout to A1089 southbound between points 1/17 on sheet 32 and 39/3 on sheet 29 shown as dashed red line on sheets 29 and 32 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) A122 Lower Thames Crossing southbound to A13 eastbound/ Orsett Cock roundabout between points 1/24 on sheet 29 and 1/23 on sheet 33 and shown as dashed red line on sheets 29 and 33 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) Stifford Clays Road between points 32/1 and 32/3 shown as dashed dark blue line on sheet 33 of the traffic regulation measures plans. 50 miles per hour Stifford Clays Road between points 32/3 and 32/4 shown as dashed orange line on sheet 33 of the traffic regulation measures plans. 30 miles per hour B186 North Road between points 35/1 and 35/4 shown as dashed green line on sheet 39 of the traffic regulation measures plans. 40 miles per hour M25 northbound between points 37/1 on sheet 42 and 37/2 on sheet 46 shown as dash and dot red line on sheets 42, 43, 44, 45 and 46 of the traffic regulation measures plans. Variable Mandatory Speed Limit M25 southbound between points 1/11 on sheet 43 and 37/4 on sheet 46 shown as dash and dot red line on sheets 43, 44, 45 and 46 of the traffic regulation measures plans. Variable Mandatory Speed Limit A122 Lower Thames Crossing northbound to M25 northbound between points 1/9 on sheet 43 and 37/7 on sheet 44 shown as dot and dashed red line on sheets 43 and 44 of the traffic regulation measures plans. Variable Mandatory Speed Limit M25 southbound on-slip at M25 junction 29 between points 37/12 on sheet 44 and 37/23 on sheet 45 shown as dash and dot red line on sheets 44 and 45 of the traffic regulation measures plans. Variable Mandatory Speed Limit A122 Lower Thames Crossing northbound to M25 Junction 29 link road between points 1/9 and 37/6 shown as dashed red line on sheet 43 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) Connecting road (northbound exit slip) from M25 northbound to M25 junction 29 between points 37/5 on sheet 42 and 37/6 on sheet 43 point shown as dashed red line on sheets 42 and 43 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) Connecting road (northbound exit slip) from M25 northbound to M25 junction 29 between points 37/6 on sheet 43 and 37/20 on sheet 45 shown as dashed red line on sheet 43, 44 and 45 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) M25 northbound to A127 westbound dedicated off-slip between points 37/21 and 37/16 shown as dashed red line on sheet 45 of the traffic regulation measures plans. National Speed Limit (70 miles per hour) A127 westbound to M25 southbound dedicated on-slip between points 37/22 and 37/23 shown as dot and dash red line on sheet 45 of the traffic regulation measures plans. Variable Mandatory Speed Limit
I328PART 2 CLEARWAYS AND OTHER RESTRICTIONS¶
|
(1)
Road name, number and length
|
(2)
Measure
|
|---|---|
| A2 westbound between points 2/8 on sheet 3 and 2/21 on sheet 6 as shown as black circle line on sheet 3, 4 and 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, hard shoulders, and slip roads) |
| A2 eastbound between points 2/29 on sheet 3 and 13/1 on sheet 6 shown as black circle line on sheet 3, 4 and 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, hard shoulders, and slip roads) |
| A289 southbound to A2 westbound link road between points 2/28 and 2/27 shown as black circle line on sheet 3 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 link road eastbound between points 2/11 on sheet 3 and 2/17 on sheet 6 shown as black circle line on sheet 3, 4 and 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 link road westbound between points 2/27 on sheet 3 and 2/19 on sheet 6 shown as black circle line on sheets 3, 4 and 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, hard shoulders, and slip roads) |
| Northbound lanes of A122 Lower Thames Crossing between points 1/3 on sheet 11 and 1/9 on sheet 43 shown as black circle line on sheets 11, 13, 14, 15, 16, 20, 23, 24, 27, 28, 29, 33, 35, 38, 39, 42 and 43 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Southbound lanes of A122 Lower Thames Crossing between point 1/4 on sheet 11 and 1/10 on sheet 43 shown as black circle line on sheets 11, 13, 14, 15, 16, 20, 23, 24, 27, 28, 29, 33, 35, 38, 39, 42, and 43 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Halfpence Lane roundabout to Thong Lane between points 6/1 and 6/2 shown as black circle line on sheet 4 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| New local road between Cobham roundabout and Halfpence Lane roundabout between points 6/1 on sheet 4 and 2/37 on sheet 6 shown as black circle line on sheet 4 and 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| New local road between Cobham roundabout and Henhurst roundabout between points 2/38 and 7/1 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 westbound to Cobham roundabout between points 2/3 and 2/39 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A122 Lower Thames Crossing southbound to Gravesend East junction south between points 2/16 and 8/4 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A122 Lower Thames Crossing southbound to A2 westbound between points 2/16 and 2/41 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 westbound link road to Cobham roundabout between points 2/20 and 2/40 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Cobham roundabout at points 2/4 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Eastbound and westbound Lanes between Henhurst road roundabout and Gravesend East junction south between points 8/6 and 8/8 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 westbound link road to A122 Lower Thames Crossing northbound between points 2/22 on sheet 4 and 1/5 on sheet 6 shown as black circle line on sheet 4 and 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 westbound to A122 Lower Thames Crossing northbound between points 2/24 on sheet 2 and 1/2 on sheet 4 shown as black circle line on sheet 2 and 4 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A122 Lower Thames Crossing southbound to A2 eastbound between points 2/25 on sheet 4 and 1/4 on sheet 11 shown as black circle line on sheet 4, 6 and 11 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A122 Lower Thames Crossing southbound to A2 eastbound link road between points 11/2 on sheet 4 and 1/4 on sheet 11 shown as black circle line on sheet 4, 6 and 11 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A122 Lower Thames Crossing southbound to A2 westbound between points 1/1 and 2/16 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 eastbound to A122 Lower Thames Crossing northbound between points 13/1 and 1/2 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 eastbound to A122 Lower Thames Crossing northbound between points 1/2 on sheet 6 and 1/3 on sheet 11 shown as dot and dashed red line on sheets 6 and 11 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Hever Court Road roundabout to A122 Lower Thames Crossing northbound between points 2/14 on sheet 6 and 1/3 on sheet 11 shown as black circle line on sheets 6 and 11 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Hever Court Road roundabout to A2 eastbound between points 2/15 and 2/13 shown as black circle line on sheet 6 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A13 westbound to A122 Lower Thames Crossing southbound between points 1/16 on sheet 28 and 29/8 on sheet 32 shown as black circle line on sheets 28, 29 and 32 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A1089 northbound to A122 Lower Thames Crossing northbound and southbound between points 1/12 on sheet 29 and 1/13 on sheet 33 shown as black circle line on sheets 29 and 33 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A1089 northbound to A122 Lower Thames Crossing southbound between points 1/13 and 1/22 shown as black circle line on sheet 33 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A1089 northbound to A122 Lower Thames Crossing northbound between points 1/13 and 1/14 shown on sheet 33 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads, and laybys) |
| A122 Lower Thames Crossing northbound to A13 eastbound between points 1/19 on sheet 32 and 1/18 on sheet 29 shown as black circle line on sheets 29 and 32 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A122 Lower Thames Crossing northbound to Orsett Cock roundabout between points 29/5 and 1/20 shown as black circle line on sheet 32 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A13 eastbound to Orsett cock roundabout between points 30/1 and 30/2 shown as black circle line on sheet 32 of Traffic Regulation Measures Plans. | Clearway (to include verges, hard strips, and slip roads) |
| Orsett Cock roundabout to A13 westbound between points 29/6 on sheet 32 and 29/7 on sheet 29 shown as black circle line on sheets 29 and 32 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Orsett Cock roundabout to A1089 southbound between points 1/17 on sheet 32 and 39/3 on sheet 29 shown as dashed red line on sheets 29 and 32 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A122 Lower Thames Crossing southbound to A13 eastbound/ Orsett Cock roundabout between points 1/24 on sheet 29 and 1/23 on sheet 33 shown as black circle line on sheets 29 and 33 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A122 Lower Thames Crossing northbound to Junction 29 link road between points 1/9 and 37/6 shown as black circle line on sheet 43 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Connecting road (northbound exit slip) from M25 northbound to M25 junction 29 between points 37/5 on sheet 42 and 37/6 on sheet 43 point shown as black circle line on sheets 42 and 43 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| Connecting road (northbound exit slip) from M25 northbound to M25 junction 29 between points 37/6 on sheet 43 and 37/20 on sheet 45 shown as black circle line on sheet 43, 44 and 45 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| M25 northbound to A127 westbound dedicated off-slip between points 37/21 and 37/16 shown as black circle line on sheet 45 of the traffic regulation measures plans. | Clearway (to include verges, hard strips, and slip roads) |
| A2 eastbound between points 2/29 on sheet 3 and 13/1 on sheet 6 shown on sheets 3, 4 and 6 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| Hever Court Road roundabout to A2 eastbound between points 2/15 and 2/13 shown on sheet 6 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A2 westbound between points 2/8 on sheet 3 and 2/19 on sheet 6 shown on sheets 3, 4 and 6 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A122 Lower Thames Crossing southbound to A2 eastbound between points 2/25 on sheet 4 and 1/4 on sheet 11 shown on sheets 4, 6 and 11 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A2 eastbound to A122 Lower Thames Crossing northbound between points 2/17 and 1/2 shown on sheet 6 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A2 eastbound to A122 Lower Thames Crossing northbound between points 1/2 on sheet 6 and 1/3 on sheet 11 shown on sheets 6 and 11 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| Hever Court Road roundabout to A122 Lower Thames Crossing northbound between points 2/14 on sheet 6 and 1/3 on sheet 11 shown on sheets 6 and 11 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A122 Lower Thames Crossing southbound to A2 eastbound link road between points 11/2 on sheet 4 and 1/4 on sheet 11 shown on sheet 2, 4 and 9 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A2 westbound to A122 Lower Thames Crossing northbound between points 2/24 on sheet 4 and 1/3 on sheet 11 shown on sheet 4, 6 and 11 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A2 westbound link road to A122 Lower Thames Crossing northbound between points 2/22 on sheet 4 and 1/5 on sheet 6 shown on sheet 4 and 6 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| Northbound lanes of A122 Lower Thames Crossing between points 1/3 on sheet 11 and 1/9 on sheet 43 shown on sheets 11, 13, 14, 15, 16, 20, 23, 24, 27, 28, 29, 33, 35, 38, 39, 42 and 43 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| Southbound lanes of A122 Lower Thames Crossing between points 1/4 on sheet 11 and 1/10 on sheet 43 shown on sheets 11, 13, 14, 15, 16, 20, 23, 24, 27, 28, 29, 33, 35, 38, 39, 42 and 43 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A13 westbound to A122 Lower Thames Crossing southbound between points 29/8 on sheet 32 and 1/16 on sheet 28 shown on sheets 28, 29 and 32 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A13 westbound to A122 Lower Thames Crossing northbound between points 1/15 on sheet 32 and 1/31 on sheet 35 shown on sheets 29, 32, 33 and 35 of the traffic regulation measures plans | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A1089 northbound to A122 Lower Thames Crossing northbound and southbound between points 1/12 on sheet 29 and 1/13 on sheet 33 shown on sheets 29 and 33 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A1089 northbound to A122 Lower Thames Crossing southbound between points 1/13 and 1/22 shown on sheet 33 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A1089 northbound to A122 Lower Thames Crossing northbound between points 1/13 and 1/14 shown on sheet 33 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A122 Lower Thames Crossing southbound to A13 eastbound/ Orsett Cock roundabout between points 1/24 on sheet 29 and 1/23 on sheet 33, as shown on sheets 29 and 33 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A122 Lower Thames Crossing northbound to A13 eastbound between points 1/19 on sheet 32 and 1/18 on sheet 29 shown on sheets 29 and 32 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A122 Lower Thames Crossing northbound to Orsett Cock roundabout between points 29/5 and 1/20 shown on sheet 32 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
| A122 Lower Thames Crossing northbound to M25 Junction 29 link road between points 1/9 and 37/6 shown on sheet 43 of the traffic regulation measures plans. | Prohibition of pedestrians, bicycles, motorcycles with engines less than 50 cubic centimetres, mopeds, invalid carriages, agricultural vehicles, horses ridden or accompanied, animals and vehicles drawn by animals |
I329PART 3 VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS¶
|
(1)
Road name, number and length
|
(2)
Title of Order
|
(3)
Variations
|
|---|---|---|
| Thong Lane at point 6/1 on sheet 4 of the traffic regulation measures plans | Gravesham Borough Council (Thong Lane) (Width Restriction) Order 1981 | Order to be varied to alter the southern termination point (point 6/1 on sheet 4 of the traffic regulation measures plans) of the existing width limit on Thong Lane. The southern termination point of the width limit will be moved to point 6/2 on sheet 4 of the traffic regulation measures plans. |
| Hornsby Lane between points 22/3 and 22/2 on sheet 28 of the traffic regulation measures plans. | The Borough of Thurrock (Brentwood Road, Chadwell St Mary) (7.5t Weight Restriction) Order 2012 | Order to be varied so that the restriction is disapplied between points 22/3 and 22/2 on sheet 28 of the traffic regulation measures plans. |
| Muckingford Road between points 15/8 and 15/2 on sheet 24 of the traffic regulation measures plans. | The Borough of Thurrock (Muckingford Road/ Linford Road, Linford & A1306 Arterial Road Purfleet) Order 2015 | Order to be varied to move 30m eastwards, to point 15/2 on sheet 24 of the traffic regulation measures plans, the eastern termination point of the 50 miles per hour speed limit restriction on Muckingford Road. |
I330SCHEDULE 7 ¶
TREES SUBJECT TO TREE PRESERVATION ORDERS
Article 24
|
(1)
Type of tree
|
(2)
Work to be carried out
|
(3)
Relevant part of the authorised development
|
(4)
TPO reference
|
|---|---|---|---|
| Woodland | Felling | Works Nos. 1E, E5, 1L | TPO No. 1960001(Gravesham) |
| Woodland | Felling | Works Nos. 1H, E4, E6, E10, MUT1, MU10, ULH13, OH2 | TPO No. 1972-001(Gravesham) |
| Woodland | Felling | Works Nos. 2I, 2Q, 2H, E9, G1b, G2, G3, OH1, ULH14 | TPO No. 1999-001 (Gravesham) |
| Woodland | Felling | Works Nos. E20, MU36, OH3, OH4, OHT2 | TPO No. 28/1991 (Thurrock) |
| Individual trees | Felling | Works Nos. E20, MUT6 | TPO No. 12/1999 (Thurrock) |
| Woodland | Felling | Works Nos. 6A, 6C, E23, E24, MU37 | TPO No. 07/1990 (Thurrock) |
| Area and individual trees | Felling | Works Nos. 7X, MU43 | TPO No. 01/1983 (Thurrock) |
| Individual trees | Felling | Works Nos. E44, MU72, MU75, MU76, MUT30 | TPO No. 4-88 (London Borough of Havering) |
| Area and individual trees | Felling | Works Nos. E48, FCA6, FCA7 | TPO No. 12-92 (London Borough of Havering) |
| Woodland, tree group and individual trees | Felling | Works Nos. 9A, 9D, 9E, 9N, MU73, MU75, MU76, MUT30 | TPO No. 1-06 (London Borough of Havering) |
| Tree group and individual trees | Felling | Works Nos. 9B, 9E, 9N, MU74, MU76 | TPO No. 13-72 (London Borough of Havering) |
| Individual tree | Felling | Works Nos. 9A, 9N, MU75, MU76, MUT30 | TPO No. 14-97 (London Borough of Havering) |
| Area | Felling | Works Nos. 9D, 9J, 9Y, MU91 | TPO No. 19-1991 (London Borough of Havering) |
| Area and individual tree | Felling | Works Nos. E51, ULH02 | TPO No. 20-81 (London Borough of Havering) |
| Area | Felling | Works No. 9J, 9Y, MU91 | TPO No. 16-07 (London Borough of Havering) |
I331SCHEDULE 8 ¶
LAND OF WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Articles 28 and 35
|
(1)
Plot Reference Number shown on Land Plan
|
(2)
Purpose(s) for which rights over land may be acquired or restrictive covenants may be imposed
|
|---|---|
| 01-01, 01-03, 01-05, 01-08, 01-09, 01-10, 01-11, 01-13, 01-15, 01-16, 01-17, 01-18, 01-19, 01-20, 01-21 and 01-22 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition, and the rights for access to maintain those environmental works |
| 02-04, 02-05, 02-06, 02-07, 02-08, 02-09, 02-10 and 02-11 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition, and the rights for access to maintain those environmental works |
| 03-02, 03-03, 03-14, 03-16 and 03-17 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 03-07 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 03-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 03-87 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 03-96, 03-98, 03-112, 03-135, 03-139, 03-140, 03-141, 03-142, 03-143, 03-144 and 03-146 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-03, 04-14, 04-38, 04-63, 04-93, 04-94 and 04-98 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 04-07, 04-12, 04-17, 04-45, 04-101 and 04-122 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 04-08, 04-16, 04-61, 04-72, 04-109, 04-128 and 04-154 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-42, 04-58 and 04-92 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-89 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-99 and 04-145 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 04-138 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-140, 04-223, 04-228, 04-244, 04-246, 04-247, 04-249, 04-251, 04-252, 04-266 and 04-268 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 04-148, 04-149, 04-151, 04-152 and 04-153 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-215, 04-229, 04-243 and 04-259 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-225 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-226 and 04-227 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 04-274 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 05-07, 05-08, 05-09, 05-10, 05-11, 05-12, 05-13, 05-14, 05-15, 05-16, 05-17 and 05-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 06-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 06-18, 06-19, 06-91, 06-96, 06-98, 06-99, 06-102, 06-104, 06-107, 06-111, 06-112, 06-113, 06-114 and 06-115 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 06-46 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 06-54 | Provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 06-55 and 06-64 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 06-56 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 06-67 and 06-117 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 06-72, 06-78 and 06-131 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 06-121 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 06-132, 06-207 and 06-208 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 06-136, 06-137, 06-139, 06-151 and 06-209 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 06-144 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 06-152 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 06-158 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 06-182, 06-188 and 06-204 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 06-187 and 06-205 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 07-01, 07-02, 07-04, 07-05, 07-09, 07-11, 07-15, 07-17, 07-20, 07-22, 07-23, 07-26, 07-27, 07-28, 07-29, 07-40, 07-41 and 07-42 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 08-06, 08-07, 08-08, 08-09, 08-10, 08-11, 08-12, 08-13, 08-14 and 08-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 10-05, 10-06, 10-07, 10-08, 10-09 and 10-10 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition, and the rights for access to maintain those environmental works |
| 11-15 | Installation of a medium-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 11-24 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 11-38 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 11-39 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 11-40 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 11-43, 11-46, 11-47 and 11-48 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 11-50 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 11-64 and 11-70 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 11-73 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 12-02 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 12-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 12-08, 12-09, 12-12, 12-13, 12-14, 12-15, 12-16, 12-17, 12-18, 12-19 and 12-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 13-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 13-13, 13-14, 13-15, 13-16, 13-17 and 13-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 13-19, 13-20, 13-21, 13-24, 13-25, 13-26, 13-27, 13-28, 13-29, 13-30, 13-31, 13-32, 13-33, 13-34, 13-40, 13-42 and 13-45 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 13-54, 13-55, 13-56, 13-63, 13-70, 13-71, 13-72, 13-85, 13-89 and 13-90 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 13-65 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 13-67 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 13-74 and 13-75 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 13-79 | Provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 16-02, 16-04, 16-05, 16-10, 16-11, 16-12, 16-17, 16-18, 16-19, 16-20, 16-21, 16-30, 16-31 and 16-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 16-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 16-44, 16-49, 16-54, 16-55, 16-56, 16-57, 16-58, 16-59, 16-60, 16-62, 16-63 and 16-68 | Construction of a new outfall from the north portal to the River Thames and the rights to construct, operate, protect and maintain the outfall |
| 19-05 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 20-01, 20-13, 20-47, 20-50, 20-57, 20-75 and 20-76 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 20-06, 20-07, 20-08 and 20-09 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 20-10, 20-11, 20-12, 20-15, 20-16, 20-17, 20-23, 20-24, 20-25, 20-28 and 20-32 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 20-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 20-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 20-19 and 20-20 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 20-21 and 20-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 20-41 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 20-42 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 20-48, 20-49, 20-55, 20-56 and 20-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 20-99 | Construction of a new outfall from the north portal to the River Thames and the rights to construct, operate, protect and maintain the outfall |
| 21-13, 21-14, 21-15, 21-16, 21-17, 21-20, 21-23, 21-25, 21-26, 21-28 and 21-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 21-24, 21-33, 21-35 and 21-36 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 22-04, 22-05, 22-06, 22-08, 22-10 and 22-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 22-25, 22-27, 22-29, 22-30, 22-31, 22-32, 22-33, 22-34, 22-36, 22-37, 22-38, 22-41, 22-42, 22-43, 22-44, 22-49, 22-50, 22-51, 22-52, 22-53, 22-54 and 22-55 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-01, 23-02, 23-03, 23-04, 23-05, 23-06, 23-07, 23-08, 23-09, 23-10, 23-11, 23-12, 23-13, 23-14, 23-15, 23-18 and 23-170 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-16 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-17 and 23-20 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works |
| 23-21 and 23-22 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 23-24, 23-25, 23-108, 23-110, 23-112, 23-120, 23-123, 23-127, 23-138, 23-142, 23-143 and 23-146 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-26 and 23-28 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-30 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works; and installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain |
| 23-32, 23-182, 23-183 and 23-184 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-41, 23-46 and 23-48 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-44, 23-45, 23-49, 23-53, 23-55 and 23-58 | Provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 23-47 | Construction of a new flood compensation area and the rights and restrictive covenants to construct, protect, operate, access and maintain the flood compensation area; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-50 | Construction of a new flood compensation area and the rights and restrictive covenants to construct, protect, operate, access and maintain the flood compensation area; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works. |
| 23-54, 23-56, 23-60, 23-66, 23-67, 23-69 and 23-71 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-57 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-59 and 23-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-63 and 23-65 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-64 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-72 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-76 | Construction of a new flood compensation area and the rights and restrictive covenants to construct, protect, operate, access and maintain the flood compensation area; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-88, 23-90 and 23-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-95 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-97 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 23-104, 23-105, 23-107 and 23-109 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-125 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-128, 23-129, 23-130, 23-132, 23-135, 23-136, 23-139, 23-150, 23-151, 23-153, 23-161, 23-162, 23-169, 23-175, 23-176, 23-177, 23-178 and 23-179 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-133 and 23-148 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-154 and 23-157 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 23-181 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 24-01, 24-03, 24-05, 24-160, 24-161, 24-162 and 24-163 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 24-06, 24-07 and 24-12 | Provision for access for utility works, and the rights for access to maintain those utility works; and provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 24-08, 24-25, 24-30 and 24-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-17, 24-22, 24-23, 24-27, 24-28, 24-29, 24-31 and 24-42 | Provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 24-34 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-43 and 24-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 24-45 and 24-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-46, 24-56, 24-59, 24-68, 24-90, 24-126, 24-129 and 24-130 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 24-53, 24-63, 24-67, 24-69, 24-80, 24-81 and 24-82 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-83, 24-92, 24-93, 24-98 and 24-99 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-84 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-95 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-96, 24-103 and 24-105 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-109 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-112 and 24-113 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-120, 24-121 and 24-123 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-124 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 24-133, 24-192 and 24-193 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 24-136 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 24-153 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 24-191 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 25-01, 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-08, 25-09, 25-10, 25-11, 25-12, 25-13, 25-14, 25-15, 25-16, 25-17, 25-18, 25-19, 25-20, 25-21, 25-22, 25-23, 25-24, 25-25, 25-26, 25-27, 25-28, 25-29, 25-30, 25-31, 25-32, 25-33, 25-34, 25-35, 25-36, 25-37, 25-38, 25-39, 25-40, 25-41, 25-42, 25-43, 25-44, 25-45, 25-46, 25-47, 25-48, 25-49, 25-50, 25-51, 25-52, 25-53, 25-54, 25-55, 25-56, 25-57, 25-58, 25-59, 25-60, 25-61, 25-62, 25-63, 25-64, 25-65, 25-66, 25-67, 25-68, 25-69, 25-70, 25-71, 25-72, 25-73, 25-74, 25-75, 25-76, 25-77, 25-78, 25-81, 25-82, 25-83, 25-84, 25-85, 25-86, 25-87, 25-88, 25-89, 25-90, 25-91 and 25-92 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 25-93, 25-95, 25-98, 25-99, 25-101, 25-102, 25-106, 25-109 and 25-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 26-17, 26-18, 26-19, 26-20, 26-21, 26-22, 26-23, 26-25, 26-26, 26-27, 26-28, 26-29, 26-30, 26-31, 26-32, 26-33, 26-35, 26-36, 26-37, 26-38, 26-39, 26-40, 26-41, 26-42, 26-44, 26-45, 26-46, 26-47, 26-48, 26-49, 26-50, 26-51, 26-52, 26-53, 26-54, 26-55, 26-56, 26-57, 26-58, 26-59, 26-60, 26-61, 26-62, 26-63, 26-64, 26-65 and 26-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 27-01 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 27-02, 27-09, 27-11 and 27-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 27-06 and 27-16 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 27-25, 27-27, 27-36, 27-37, 27-38 and 27-39 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 27-41, 27-42, 27-44, 27-51, 27-53 and 27-54 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 27-45, 27-47, 27-48, 27-50, 27-57, 27-58, 27-59, 27-60, 27-61 and 27-62 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 27-67, 27-68, 27-69, 27-70, 27-71, 27-74, 27-75, 27-76, 27-80, 27-82, 27-96 and 27-101 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 27-77, 27-78, 27-79, 27-81, 27-83, 27-84, 27-86, 27-88, 27-89, 27-91, 27-92, 27-93, 27-94, 27-95, 27-98, 27-99, 27-100, 27-102 and 27-103 | Provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 28-01 and 28-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-02 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-03, 28-13 and 28-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-04 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-05 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-08 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-09 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-21 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-27, 28-30 and 28-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-37 and 28-39 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-38, 28-98, 28-100 and 28-103 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-42 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-45 and 28-46 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-49, 28-52, 28-53, 28-54, 28-56, 28-57, 28-59, 28-61, 28-69, 28-70, 28-71, 28-72 and 28-73 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-50 and 28-51 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-60 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-64 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-67 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-106 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-124 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-125 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-127 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-128 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-129 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-131 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-132 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-133 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-134 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-135 | Provision for access for utility works, and the rights for access to maintain those utility works |
| 28-137 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-139 and 28-141 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 28-143 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 28-144 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 29-03 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-04 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-10 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-17 and 29-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-26 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-61, 29-62, 29-63 and 29-65 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-113 | Improvements to Woolings Close, and the rights and restrictive covenants to construct, protect, operate, access and maintain the improvements |
| 29-115 | Improvements to Woolings Close, and the rights and restrictive covenants to construct, protect, operate, access and maintain the improvements; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-140 and 29-211 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-202 and 29-205 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-212 and 29-215 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-213 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-231, 29-238 and 29-242 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-236 and 29-237 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-247 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-248 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-249 and 29-250 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-258 and 29-268 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-262 and 29-267 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-263 and 29-266 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-264 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-277 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 29-282 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 29-283 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 30-01, 30-02, 30-04, 30-05, 30-06, 30-07, 30-08, 30-09, 30-10 and 30-11 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works |
| 30-74, 30-75, 30-76, 30-77, 30-78, 30-79 and 30-80 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 31-07 and 31-11 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 31-10, 31-14, 31-16, 31-17, 31-20, 31-21 and 31-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 31-15 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-05 and 32-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-11, 32-15, 32-16 and 32-17 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-25 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-33, 32-35 and 32-36 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-39, 32-44, 32-48, 32-55, 32-84, 32-135, 32-157, 32-164 and 32-169 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-58 and 32-59 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-63 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-93 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-103, 32-116, 32-118, 32-120, 32-130, 32-138, 32-143 and 32-144 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 32-110 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-111, 32-122, 32-124, 32-125, 32-128, 32-129 and 32-133 | Provision for access for works involving the installation of a high-pressure gas pipeline, and rights for access to maintain the pipeline |
| 32-136 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-139, 32-140, 32-141, 32-142, 32-145, 32-148, 32-155, 32-159, 32-160, 32-168, 32-170, 32-171, 32-172, 32-173, 32-174 and 32-179 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 32-156 and 32-163 | Installation of a isolation valve, and the rights and restrictive covenants to construct, protect, operate, access and maintain the valve |
| 32-177 and 32-178 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works |
| 33-01 and 33-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-02 and 33-08 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-05 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 33-17 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 33-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-30 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 33-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 33-36 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-47, 33-49, 33-53, 33-54, 33-55, 33-82, 33-83, 33-84, 33-93, 33-94, 33-100, 33-101, 33-104, 33-106, 33-108, 33-115, 33-116, 33-118, 33-154, 33-155, 33-173, 33-178, 33-184, 33-188, 33-221, 33-300, 33-301 and 33-302 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-67 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-68 and 33-70 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-69, 33-71, 33-77, 33-78, 33-79, 33-80 and 33-81 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-86, 33-88 and 33-89 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-87 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-90, 33-91, 33-99, 33-103, 33-105, 33-107, 33-114, 33-119, 33-129, 33-134, 33-146, 33-152, 33-157, 33-158, 33-159, 33-160, 33-162, 33-165, 33-168, 33-169, 33-170, 33-172, 33-174, 33-176, 33-177, 33-181, 33-183, 33-187, 33-190, 33-192, 33-195, 33-196, 33-197, 33-199, 33-200, 33-202, 33-203, 33-205, 33-206, 33-208, 33-209, 33-210, 33-211, 33-212, 33-215, 33-217, 33-219, 33-220, 33-222, 33-225, 33-227, 33-228, 33-230, 33-231, 33-232, 33-233, 33-236, 33-238, 33-239, 33-240, 33-241, 33-243, 33-244, 33-245, 33-246, 33-247, 33-251, 33-252, 33-256, 33-258, 33-260, 33-261, 33-267, 33-269, 33-271, 33-272, 33-274, 33-275, 33-279, 33-283, 33-284, 33-286 and 33-287 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-98 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-109, 33-113, 33-117, 33-120, 33-121, 33-122, 33-123, 33-124, 33-125, 33-126, 33-127, 33-128, 33-130, 33-131, 33-132, 33-133, 33-135, 33-136, 33-137, 33-138, 33-139, 33-140, 33-141, 33-142, 33-143, 33-144, 33-145, 33-147, 33-148, 33-149, 33-150, 33-151, 33-153, 33-156, 33-161, 33-163, 33-164, 33-166, 33-167, 33-171, 33-180, 33-185 and 33-186 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-110 and 33-112 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-175, 33-248, 33-250, 33-266, 33-270, 33-273 and 33-277 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 33-182, 33-189 and 33-191 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-194 and 33-229 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 33-201 and 33-207 | Improvements to Woolings Close, and the rights and restrictive covenants to construct, protect, operate, access and maintain the improvements |
| 33-253, 33-262 and 33-264 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-278 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 33-290 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 34-01, 34-03 and 34-05 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 34-02, 34-06, 34-15, 34-17, 34-19, 34-23, 34-24, 34-25, 34-26, 34-41, 34-42, 34-43, 34-47 and 34-48 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 34-30, 34-31 and 34-45 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 34-33, 34-38, 34-39 and 34-40 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 34-44 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 35-01, 35-03 and 35-07 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 35-02 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 35-05, 35-06, 35-19, 35-20, 35-21, 35-53, 35-54 and 35-56 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 35-09 and 35-55 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 35-13 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; construction of a new flood compensation area and the rights and restrictive covenants to construct, protect, operate, access and maintain the flood compensation area; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 35-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 35-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 35-34 and 35-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 35-36, 35-42, 35-58, 35-59 and 35-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 36-01 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 36-02 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 36-03 and 36-05 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works |
| 36-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 37-05 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 37-06 and 37-07 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works |
| 38-01 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 38-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 38-13 | Utility works including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 38-14 and 38-24 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 38-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 38-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 38-22 | Diversion of existing gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 38-25 and 38-38 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 38-31 | Diversion of existing gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 38-32 | Diversion of existing gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 38-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 38-34 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works |
| 38-35 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 38-40, 38-41, 38-42, 38-43, 38-44, 38-46, 38-49, 38-51, 38-52, 38-59, 38-60, 38-61, 38-64 and 38-65 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 38-47 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; construction of a new flood compensation area and the rights and restrictive covenants to construct, protect, operate, access and maintain the flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 38-53, 38-54 and 38-55 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and construction of a new flood compensation area, including rights and restrictive covenants to construct, protect, operate, access and maintain the flood compensation area |
| 39-04 | Diversion of existing gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 39-06 and 39-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-13, 39-17, 39-20, 39-21, 39-27 and 39-28 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-18, 39-29 and 39-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-23 | Diversion of existing gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-30 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-31 and 39-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-50, 39-52, 39-54, 39-55, 39-57 and 39-59 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-65 and 39-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-67 | Diversion of existing gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-72 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-78 | Diversion of existing gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 39-82 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works |
| 39-83 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 40-22 | Diversion of existing gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 41-01 and 41-02 | Provision for access for environmental mitigation works to create a site for protected species, and the rights for access to maintain those environmental works |
| 41-03 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 41-04, 41-05, 41-08 and 41-32 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 41-10 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 41-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 41-13, 41-14, 41-44, 41-48 and 41-49 | Provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 41-23 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 41-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 41-33, 41-34, 41-35, 41-36, 41-37, 41-38, 41-40, 41-41, 41-42 and 41-43 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 42-01, 42-02 and 42-03 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 42-05, 42-06 and 42-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-08 and 42-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-09, 42-10 and 42-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-17 and 42-21 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-23 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-25 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-34 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-115 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-131, 42-132, 42-133 and 42-134 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-139, 42-140, 42-141, 42-142, 42-143, 42-144, 42-145, 42-146, 42-147, 42-148, 42-149, 42-150, 42-151, 42-152, 42-153, 42-154, 42-155, 42-156, 42-157, 42-158, 42-159, 42-160, 42-161, 42-162, 42-163, 42-164, 42-165, 42-166, 42-167, 42-168, 42-169, 42-170, 42-171, 42-172, 42-173, 42-174, 42-175, 42-177, 42-178, 42-179, 42-180, 42-181, 42-182, 42-184 and 42-185 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 42-176 and 42-183 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 43-01, 43-02, 43-03 and 43-05 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 43-07, 43-09, 43-18 and 43-108 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 43-19 | Implementation of environmental mitigation works to create a site for protected species, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 43-35, 43-47, 43-53, 43-106, 43-107, 43-109 and 43-110 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 43-54, 43-55, 43-56, 43-57, 43-58, 43-59, 43-60, 43-61, 43-62, 43-81, 43-89, 43-91, 43-92 and 43-103 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 43-96, 43-97, 43-99 and 43-100 | Provision for access for overhead lines diversion works, and the rights for access to maintain those overhead line diversion works |
| 43-104 and 43-105 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons, and the rights and restrictive covenants to construct, protect, operate, access and maintain those overhead lines diversion works |
| 43-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-01, 44-02, 44-03 and 44-06 | Construction of a new flood compensation area, including rights and restrictive covenants to construct, protect, operate, access and maintain the flood compensation area |
| 44-05 | Construction of a new flood compensation area, including rights and restrictive covenants to construct, protect, operate, access and maintain the flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-08, 44-13, 44-14 and 44-94 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-09 and 44-17 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-10, 44-44 and 44-84 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-16 and 44-90 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-68 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-80 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-81 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-86 and 44-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-88 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-89, 44-95 and 44-96 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-98, 44-99 and 44-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 44-112, 44-120, 44-121, 44-122, 44-123 and 44-124 | Provision for access for utility works, and the rights for access to maintain those utility works |
| 45-10, 45-11, 45-19, 45-21, 45-23, 45-24, 45-25, 45-26, 45-29, 45-31, 45-33, 45-38, 45-42, 45-50, 45-52, 45-62 and 45-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 45-71, 45-72, 45-99 and 45-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 45-87, 45-89 and 45-108 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, the installation of poles and pole mounted transformers, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 45-110 and 45-112 | Provision for access for utility works, and the rights for access to maintain those utility works |
| 45-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, the installation of poles and pole mounted transformers, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 45-120 | Construction of protection measures for retention of the existing infrastructure, and the rights and restrictive covenants to construct, protect, operate, access and maintain those protection measures |
| 45-121 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, the installation of poles and pole mounted transformers, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 45-155, 45-160 and 45-169 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 45-158, 45-165, 45-168, 45-171, 45-172, 45-173 and 45-174 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 45-175, 45-176 and 45-177 | Provision for access for utility works, and the rights for access to maintain those utility works |
| 46-04 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
| 46-06 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works; and installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 46-08, 46-09, 46-11, 46-12, 46-13 and 46-55 | Installation of a high-pressure gas pipeline, and the rights and restrictive covenants to construct, protect, operate, access and maintain the pipeline |
| 46-23, 46-24 and 46-25 | Provision for access for utility works, and the rights for access to maintain those utility works |
| 46-26 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works |
| 47-26 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds, and the rights and restrictive covenants to construct, protect, operate, access and maintain those environmental mitigation works |
SCHEDULE 9 ¶
MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS
Article 28
Compensation enactments¶
Application of Part 1 of the 1965 Act¶
I1056 Application of the 2017 Regulations¶
References to land in the Schedule to the 2017 Regulations are, in the appropriate contexts, to be read (according to the requirements of the context) as referring to, or as including references to—I332SCHEDULE 10 ¶
LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS IN AND ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED
Articles 33, 35 and 36
I332In this Schedule, “the level of the surface of the land” means—
I332at the time of this Order coming into force.
13-38 14 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 13-41 13 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 13-46 14 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-47 14 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-48 14 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works ; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 13-50 16 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 14-04, 14-07, 14-08, 14-09, 14-10, 14-12, 14-13 and 14-14 1 metre Acquisition of subsoil and rights (including restrictive covenants) for provision of a directional drill pipe from construction compound. 14-05 7 metres Acquisition of subsoil and rights (including restrictive covenants) for provision of a directional drill pipe from construction compound. 14-06 4 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 14-11 9 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 14-15 11 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 14-16, 14-17 and 14-18 9 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the rights and restrictive covenants to construct, protect, operate, access and maintain those utility works. 15-10 27 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-11 and 15-12 23 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-13 23 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-14 and 15-15 3 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-16 23 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 15-17 and 15-18 20 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 15-19 19 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 15-20 18 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel. 16-42 13 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 16-43 21 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works. 16-70 7 metres Acquisition of subsoil and rights (including restrictive covenants) for construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal on the south side of the river Thames in the borough of Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works.
I333SCHEDULE 11 ¶
LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
Article 35
|
(1)
Plot Reference Number shown on Land Plans
|
(2)
Purpose for which temporary possession may be taken
|
(3)
Relevant part of the authorised development
|
|---|---|---|
| 01-01, 01-03, 01-05, 01-08, 01-09, 01-10, 01-11, 01-13, 01-15, 01-16, 01-17, 01-18, 01-19, 01-20, 01-21 and 01-22 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E1 |
| 02-04, 02-05, 02-06, 02-07, 02-08, 02-09, 02-10 and 02-11 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E1 |
| 03-02, 03-03, 03-14, 03-16 and 03-17 | Installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1a and MU1 |
| 03-04 and 03-08 | Improvement works to the existing public right of way along footpath NS179. | Work No. 1K |
| 03-07 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU2, MU3 and MU4 |
| 03-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU4 |
| 03-36 and 03-80 | To facilitate the construction of a new public right of way from drainage pond to the improved public right of way south of the improved A2 mainline, and to provide temporary storage, laydown areas and working space. | Work No. 1K |
| 03-87 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU3 |
| 03-96, 03-98, 03-112, 03-135, 03-139, 03-140, 03-141, 03-142, 03-143, 03-144 and 03-146 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU1 |
| 04-03 and 04-14 | Installation of a medium-pressure gas pipeline. | Work No. G1b |
| 04-07, 04-12, 04-17, 04-45, 04-101 and 04-122 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E5 |
| 04-08, 04-16, 04-61, 04-72, 04-109, 04-128 and 04-154 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU9 |
| 04-25, 04-28 and 04-46 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L |
| 04-37 | Construction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House; and improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Works Nos. 1E and 1L |
| 04-38 | Temporary construction compound at surface for facilitating main works; and installation of a medium-pressure gas pipeline. | Works Nos. CA2 and G1b |
| 04-42 | Temporary construction compound at surface for facilitating main works; installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. CA2, G1b, MU10 and OH2 |
| 04-58 and 04-92 | Installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. G1b, MU10 and OH2 |
| 04-63, 04-93, 04-94 and 04-98 | Installation of a medium-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. G1b and OH2 |
| 04-89 | Implementation of environmental mitigation works to create a site for protected species; installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E4, G1a, G1b, MU10, MU11 and MUT1 |
| 04-96, 04-100 and 04-103 | To facilitate the construction of a new bridge to carry the realigned Thong Lane over the improved section of the A2 mainline, and to provide temporary storage, laydown areas and working space. | Work No. 1H |
| 04-99 and 04-145 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E4 |
| 04-108, 04-137 and 04-141 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E4 |
| 04-123 | Construction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House. | Work No. 1E |
| 04-138 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU10 |
| 04-140, 04-223, 04-228, 04-244, 04-246, 04-247, 04-249, 04-251, 04-252, 04-266 and 04-268 | Installation of a medium-pressure gas pipeline. | Work No. G1a |
| 04-148, 04-149, 04-151, 04-152 and 04-153 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU8 |
| 04-200, 04-233, 04-257 and 04-258 | Improvement works to the existing public right of way along footpath NS179. | Work No. 1K |
| 04-215, 04-229, 04-243 and 04-259 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU4 |
| 04-225 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU5 |
| 04-226 and 04-227 | Installation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1a and MU5 |
| 04-253, 04-254 and 04-255 | To facilitate the installation of a medium-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G1a |
| 04-274 | Implementation of environmental mitigation works to create a site for protected species; and installation of a medium-pressure gas pipeline. | Works Nos. E4 and G1a |
| 04-276 | Temporary construction compound at surface for facilitating main works and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. CA2 and OH2 |
| 05-01, 05-02 and 05-03 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L |
| 05-04, 05-05 and 05-06 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L |
| 05-07, 05-08, 05-09, 05-10, 05-11, 05-12, 05-13, 05-14, 05-15, 05-16, 05-17 and 05-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU8 |
| 06-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU15 and MU16 |
| 06-08, 06-09 and 06-11 | Improvement works to a section of the existing public right of way from Church Road to existing public right of way footpath NS175. | Work No. 2P |
| 06-18, 06-19, 06-98, 06-102, 06-104, 06-107, 06-111, 06-112, 06-113, 06-114 and 06-115 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU16 |
| 06-46 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH1 |
| 06-54 | Provision for access for overhead lines diversion works. | Work No. OH1 |
| 06-55 and 06-64 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU14 |
| 06-56 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland; implementation of environmental mitigation works to create a site for protected species Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 1L, E5 and OH1 |
| 06-67 and 06-117 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU14 and MU9 |
| 06-72, 06-78 and 06-131 | Installation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G1b and MU16 |
| 06-75 | Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland. | Work No. 1L |
| 06-91, 06-96 and 06-99 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 2Q and MU16 |
| 06-109 and 06-123 | Construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174. | Work No. 2Q |
| 06-110 | To facilitate the construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174, and to provide temporary storage, laydown areas and working space. | Work No. 2Q |
| 06-116 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E5 |
| 06-121 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E5, MU14, MU9, OH1 and OHT1 |
| 06-132, 06-136, 06-137, 06-139, 06-151, 06-207, 06-208 and 06-209 | Installation of a medium-pressure gas pipeline. | Work No. G1b |
| 06-135 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH1 |
| 06-144 | Installation of a medium-pressure gas pipeline Installation of a high-pressure gas pipeline. | Works Nos. G1b and G2 |
| 06-152 | Installation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b, G2, G3, MU17, OH1 and OHT1 |
| 06-153 | Construction of a new permissive path between the improved public right of way and Jeskyns Community woodland. | Work No. 1L |
| 06-158 | Installation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b, G2, G3, MU17 and OH1 |
| 06-182, 06-188 and 06-204 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E5 |
| 06-187 and 06-205 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU9 |
| 07-01, 07-02, 07-04, 07-05, 07-09, 07-11, 07-15, 07-17, 07-20, 07-22, 07-23, 07-26, 07-27, 07-28, 07-29, 07-40, 07-41 and 07-42 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU15 |
| 08-06, 08-07, 08-08, 08-09, 08-10, 08-11, 08-12, 08-13, 08-14 and 08-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU15 |
| 09-02, 09-03, 09-04, 09-05, 09-06, 09-07, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 09-21, 09-22, 09-23, 09-24, 09-25, 09-26, 09-27, 09-28, 09-29, 09-30, 09-31, 09-32, 09-33, 09-34, 09-35, 09-36, 09-37, 09-38, 09-39, 09-40, 09-41, 09-42, 09-43, 09-44, 09-45, 09-46, 09-47, 09-48, 09-49, 09-50, 09-51, 09-52, 09-53, 09-54, 09-55, 09-56, 09-57, 09-58, 09-59, 09-60, 09-61, 09-62, 09-63, 09-64, 09-65, 09-66, 09-67, 09-68 and 09-69 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 |
| 10-02 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 |
| 10-05, 10-06, 10-07, 10-08, 10-09 and 10-10 | Provision for access for environmental works to create a compensatory habitat site for nitrogen deposition. | Work No. E13 |
| 11-02, 11-03, 11-04, 11-05, 11-06 and 11-07 | Improvements works of a section of the existing public right of way footpath NS169. | Work No. 2Q |
| 11-15 | Installation of a medium-pressure gas pipeline Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G1b and OH1 |
| 11-24 | Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G3 and OH1 |
| 11-38 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU18 and OH1 |
| 11-39 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons | Works Nos. G3, MU18 and OH1 |
| 11-40 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH1 |
| 11-43, 11-46, 11-47 and 11-48 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU18 |
| 11-50 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G3 and MU18 |
| 11-52, 11-53 and 11-54 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G3 |
| 11-56, 11-57, 11-59, 11-60, 11-61, 11-62, 11-65, 11-67 and 11-76 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 |
| 11-63 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 |
| 11-64 and 11-70 | Installation of a high-pressure gas pipeline. | Work No. G4 |
| 11-68 and 11-69 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G4 |
| 11-71 | Overhead lines diversion works, including the removal of existing overhead lines and supports; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. OH2 and ULH13 |
| 11-73 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3, G4 and OH1 |
| 11-75 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH13 |
| 12-01, 12-03 and 12-04 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 |
| 12-02 | Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G4 and OH1 |
| 12-05 and 12-07 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 |
| 12-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU20 and OH1 |
| 12-08, 12-09, 12-12, 12-14, 12-15, 12-17, 12-18 and 12-19 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 |
| 12-13 and 12-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU20 |
| 12-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports. | Works Nos. MU20 and OH2 |
| 12-21, 12-22, 12-23, 12-24, 12-25, 12-26, 12-27, 12-28, 12-29, 12-30, 12-31, 12-32, 12-33, 12-34, 12-35, 12-36, 12-37, 12-38, 12-39, 12-40, 12-41, 12-42, 12-43, 12-44, 12-45, 12-46, 12-47, 12-48, 12-49, 12-50, 12-51, 12-52, 12-53, 12-54, 12-55, 12-56, 12-57, 12-58, 12-59, 12-60, 12-61, 12-62, 12-63, 12-64, 12-65, 12-66 and 12-67 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 |
| 13-04 and 13-05 | Construction of a new public right of way, including the upgrade of a section of the existing footpath NG7 from the new public right of way between the existing Thong Lane to the new Thong Lane bridge over the A122 Lower Thames Crossing and Thong Lane; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Works Nos. 3N and CA3 |
| 13-06, 13-07, 13-11, 13-22, 13-66, 13-69, 13-81 and 13-88 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3 |
| 13-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU23 and MUT3 |
| 13-13, 13-14, 13-15, 13-16, 13-17 and 13-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU23 |
| 13-19, 13-21, 13-24, 13-25, 13-26, 13-27, 13-28, 13-29, 13-30, 13-31, 13-32, 13-33, 13-34, 13-40 and 13-45 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT3 |
| 13-20 and 13-42 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MUT3 |
| 13-38, 13-41 and 13-50 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Works Nos. 4A and CA3 |
| 13-46 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU20, MU22, MU24 and MUT3 |
| 13-47 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU20, MU24 and MUT3 |
| 13-48 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, CA3, MU24 and MUT3 |
| 13-53, 13-60, 13-61 and 13-62 | Construction of a public right of way, including the upgrade of a section of existing footpath NG8 between the new public right of way from Thong Lane bridge over the A122 Lower Thames Crossing to NG7 and the A226; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for temporary access for overhead lines diversion works. | Works Nos. 3P, CA3 and OH1 |
| 13-54, 13-55, 13-56, 13-70 and 13-71 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 |
| 13-63, 13-72, 13-85, 13-89 and 13-90 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA3 and MU20 |
| 13-65 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3, G4 and OH1 |
| 13-67 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; provision for temporary access for overhead lines diversion works. | Works Nos. CA3, G4 and OH1 |
| 13-68 and 13-77 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA3 and OH1 |
| 13-73 and 13-76 | Overhead lines diversion works, including the removal of existing overhead lines and supports. | Work No. OH2 |
| 13-74 and 13-75 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA3 and OH1 |
| 13-78 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH1 |
| 13-79 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for access for overhead lines diversion works. | Works Nos. CA3 and OH1 |
| 14-01 | Provision for temporary outfall of drainage from temporary satellite construction compound to existing ditch; and implementation of temporary environmental works to create a compensatory habitat site. | Works Nos. 4C and ET1 |
| 14-02 and 14-03 | Provision for temporary outfall of drainage from temporary satellite construction compound to existing ditch. | Work No. 4C |
| 14-11 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel ; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, 4B, CA3, CA3A, MU25, MU26 and MUT3 |
| 14-16, 14-17 and 14-18 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 4A, 4B and MU26 |
| 14-19 and 14-20 | Temporary satellite construction compound at surface for facilitating main works. | Work No. CA3A |
| 15-01, 15-09, 15-21, 15-22 and 15-23 | Temporary satellite construction compound at surface for facilitating main works. | Work No. CA3B |
| 15-02 | Provision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA3B |
| 15-03, 15-04, 15-05, 15-06 and 15-07 | Provision for repairs to existing culvert. | Work No. CA3B |
| 15-08 | Implementation of temporary environmental works to create a compensatory habitat site. | Work No. ET1 |
| 15-17, 15-18 and 15-19 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel Temporary satellite construction compound at surface for facilitating main works. | Works Nos. 4A, 4B and CA3B |
| 16-02, 16-04, 16-05, 16-10, 16-11, 16-12, 16-17, 16-18, 16-19, 16-20, 16-21, 16-30, 16-31 and 16-32 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 |
| 16-03, 16-06, 16-07, 16-08, 16-09, 16-13, 16-14, 16-15, 16-16, 16-23, 16-24, 16-25, 16-26, 16-27, 16-28, 16-29, 16-33, 16-34, 16-35 and 16-40 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 |
| 16-22 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal. | Works Nos. CA5, MU27, MUT4 and MUT5 |
| 16-44, 16-60, 16-62 and 16-63 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A, 5O and CA5 |
| 16-47, 16-64, 16-67 and 16-69 | Provision for temporary outfall of drainage to the River Thames from the north portal of the A122 Lower Thames Crossing. | Work No. 5A |
| 16-49, 16-54, 16-55, 16-56, 16-57, 16-58 and 16-59 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A and CA5 |
| 16-62 and 16-63 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A, 5O and CA5 |
| 16-65 and 16-66 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 |
| 16-68 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames. | Work No. 5A |
| 16-70 | Construction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new public right of way along the existing footpath FP146 and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 4A, 5O and CA5 |
| 17-01, 17-02, 17-03, 17-04, 17-05 and 17-06 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 |
| 17-08 and 17-09 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 |
| 18-01, 18-02, 18-03, 18-04, 18-05, 18-06, 18-07, 18-08, 18-09 and 18-10 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 |
| 19-02, 19-14 and 19-35 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E15 |
| 19-04, 19-06, 19-08, 19-10, 19-11, 19-15, 19-16, 19-21, 19-22, 19-26, 19-27 and 19-28 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R |
| 19-05 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure. | Work No. E17 |
| 19-36 | Construction of a new public right of way along the eastern section of FP200 and a new public right of way between Coalhouse Fort and FP200. | Work No. 5R |
| 19-37 | Construction of a new water inlet with self-regulating valve. | Work No. 5X |
| 19-38 | Construction of a new public right of way along the eastern section of FP200. | Work No. 5R |
| 20-01 and 20-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 |
| 20-02, 20-03, 20-04, 20-05, 20-26, 20-27, 20-29, 20-30, 20-31, 20-33, 20-34, 20-35, 20-36, 20-37, 20-38, 20-39, 20-40, 20-43, 20-44, 20-46, 20-54, 20-71, 20-72, 20-90, 20-91, 20-92, 20-93, 20-95 and 20-97 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 |
| 20-06, 20-07, 20-08 and 20-09 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 |
| 20-10, 20-12, 20-15, 20-16, 20-17, 20-28 and 20-32 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH3 |
| 20-11, 20-23, 20-24 and 20-25 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA5 and OH3 |
| 20-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27 and OH4 |
| 20-18 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA5, MU28, OH3 and OH4 |
| 20-19 and 20-20 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 |
| 20-21 and 20-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28 and OH4 |
| 20-41 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27, MU29, MUT7, MUT8 and MUT9 |
| 20-42 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal. | Works Nos. CA5, MU27, MUT4 and MUT5 |
| 20-47, 20-48, 20-49, 20-50, 20-55, 20-56, 20-57 and 20-61 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU27 |
| 20-75 and 20-76 | Construction of a new public rights of way along the existing footpath FP200; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 5U, CA5 and MU27 |
| 20-87 and 20-102 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R |
| 20-99 | Construction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Works Nos. 5A and CA5 |
| 21-01, 21-02, 21-03, 21-04, 21-05, 21-06, 21-07, 21-08, 21-09, 21-11, 21-12 and 21-37 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 |
| 21-13, 21-15, 21-16, 21-17, 21-23, 21-25, 21-26, 21-28 and 21-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 |
| 21-14 and 21-20 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU27 |
| 21-18, 21-19, 21-27, 21-30 and 21-31 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 |
| 21-24 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 |
| 21-32 and 21-34 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach. | Work No. CA5 |
| 21-33, 21-35 and 21-36 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27 and MUT4 |
| 22-01, 22-11, 22-13, 22-19, 22-21, 22-22, 22-23, 22-24, 22-35, 22-39, 22-47, 22-48, 22-56, 22-57, 22-58, 22-60, 22-61, 22-62, 22-63, 22-64, 22-65, 22-66, 22-67, 22-68, 22-69, 22-70, 22-71, 22-73, 22-74, 22-75, 22-76, 22-78, 22-79, 22-80, 22-81, 22-82, 22-83, 22-84, 22-85, 22-86, 22-87, 22-88, 22-89, 22-90 and 22-91 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E16 |
| 22-02, 22-15 and 22-18 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT6 |
| 22-03, 22-07, 22-09, 22-12, 22-16, 22-17, 22-20 and 22-116 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 |
| 22-04, 22-05, 22-06, 22-08, 22-10 and 22-14 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MUT6 |
| 22-25, 22-27, 22-29, 22-30, 22-31, 22-32, 22-34 and 22-37 | Provision for temporary access for environmental mitigation works to create a site for protected species; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E16 and MUT11 |
| 22-33, 22-36, 22-38, 22-41, 22-42, 22-43, 22-44, 22-49, 22-50, 22-51, 22-52, 22-53, 22-54 and 22-55 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT11 |
| 23-01, 23-02, 23-03, 23-04, 23-05, 23-06, 23-07, 23-08, 23-09, 23-10, 23-11, 23-12, 23-13, 23-14, 23-15, 23-18 and 23-170 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU29 |
| 23-16 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E18 and MU29 |
| 23-17 and 23-20 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E18 |
| 23-21 and 23-22 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E18 |
| 23-23 and 23-38 | Temporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct. | Work No. CA5 |
| 23-24, 23-25, 23-110, 23-112, 23-123, 23-127, 23-138, 23-142, 23-143 and 23-146 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU27 |
| 23-26 and 23-28 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27 and OH4 |
| 23-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28 and OH4 |
| 23-30 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. Installation of a high-pressure gas pipeline. | Works Nos. CA5, CA5A, MU27, MU28, MU29, MU30, MUT7, MUT8, MUT9, OH3, OH4 and TFGP1 |
| 23-32, 23-182, 23-183, 23-184, 23-185 and 23-186 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT8 |
| 23-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU28, MU29 and MUT8 |
| 23-35 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH5 |
| 23-39, 23-40 and 23-42 | Provision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach. | Work No. CA5 |
| 23-41, 23-46 and 23-48 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 |
| 23-43, 23-119, 23-124, 23-126, 23-155, 23-159, 23-166, 23-167 and 23-174 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. | Work No. CA5 |
| 23-44, 23-45, 23-49, 23-53, 23-55 and 23-58 | Provision for access for overhead lines diversion works. | Work No. OH4 |
| 23-47 | Modification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5K, FCA1, MU33 and OH4 |
| 23-50 | Construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. FCA1, MU33, OH4, OH5, OHT2 and ULH12 |
| 23-52 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory Temporary satellite construction compound at surface for facilitating main works. | Works Nos. CA5 and CA5A |
| 23-54, 23-56, 23-60, 23-66, 23-67, 23-69 and 23-71 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 |
| 23-57 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU33 and OH4 |
| 23-59 and 23-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU28 |
| 23-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU33 and OH4 |
| 23-63 and 23-65 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28, MU30, MUT9 and OH4 |
| 23-64 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU27, MU28, MU30, MU32, MUT9 and OH4 |
| 23-72 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, OH3 and OH4 |
| 23-76 | Modification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5K, FCA1, MU28, MU33 and OH3 |
| 23-88, 23-90 and 23-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28 and OH3 |
| 23-95 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU30, MU31, MU32 and OH3 |
| 23-97 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU30 and OH3 |
| 23-115, 23-116 and 23-180 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU28 |
| 23-100 | Temporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA5 and OH3 |
| 23-101 and 23-111 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Works Nos. CA5 and OH3 |
| 23-104, 23-105, 23-107, 23-109, 23-178 and 23-179 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU33 |
| 23-108 and 23-120 | Construction of a new public rights of way along the existing footpath FP200; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 5U and MU27 |
| 23-114 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH3 |
| 23-122 | Provision for temporary access for utility works. | Work No. MU27 |
| 23-125 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MU31 |
| 23-128, 23-129, 23-130, 23-132, 23-135, 23-136, 23-139, 23-150, 23-151, 23-153, 23-161 and 23-162 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5 and MUT6 |
| 23-133 and 23-148 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MU27, MUT10 and MUT6 |
| 23-154 and 23-157 | Temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA5, MUT10 and MUT6 |
| 23-160 | To facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space. | Work No. 5R |
| 23-163, 23-164, 23-165 and 23-168 | Provision for temporary access for environmental mitigation works to create a site for protected species. | Work No. E16 |
| 23-169, 23-175, 23-176 and 23-177 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT6 |
| 23-181 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E18, MU29 and MUT8 |
| 24-01, 24-03, 24-05, 24-160, 24-161, 24-162 and 24-163 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU35 |
| 24-06, 24-07 and 24-12 | Provision for access for utility works; provision for access for overhead lines diversion works. | Works Nos. MU37, OH6 and OH7 |
| 24-08, 24-25, 24-30 and 24-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU37, OH6 and OH7 |
| 24-09, 24-164, 24-166, 24-167, 24-171, 24-172, 24-173, 24-175, 24-178, 24-180, 24-181, 24-183, 24-186, 24-187, 24-188, 24-189 and 24-190 | To facilitate the construction of a new bridge to carry the realigned Muckingford Road over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space. | Work No. 6B |
| 24-17, 24-22, 24-23, 24-27, 24-28, 24-29, 24-31 and 24-42 | Provision for access for overhead lines diversion works. | Work No. OH5 |
| 24-24 and 24-26 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU37 |
| 24-34 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 |
| 24-43 and 24-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU36 and OH5 |
| 24-45 and 24-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU34, MU36 and OH5 |
| 24-46, 24-56, 24-59, 24-68, 24-90, 24-126, 24-129 and 24-130 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU36 |
| 24-47, 24-48 and 24-74 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH5 |
| 24-53, 24-63, 24-67, 24-69, 24-80 and 24-81 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 |
| 24-71 | Temporary possession of property, to facilitate the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU36 |
| 24-82 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. OH5 and ULH12 |
| 24-83, 24-92, 24-93, 24-98 and 24-99 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH3, OH4, OHT2 and OHT3 |
| 24-84 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH3, OH4 and OHT2 |
| 24-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH3, OH4 and OHT2 |
| 24-95 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU36, MUT6, OH3, OH4, OHT2 and OHT3 |
| 24-96, 24-103 and 24-105 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH4 and OHT2 |
| 24-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU28, MU36, OH3, OH4, OHT2 and OHT3 |
| 24-109 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU36, OH4, OHT2 and OHT3 |
| 24-112 and 24-113 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU34 and OH4 |
| 24-120, 24-121 and 24-123 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W and OH4 |
| 24-124 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W, MU28, OH3 and OH4 |
| 24-125 and 24-128 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH3 |
| 24-133, 24-192 and 24-193 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT6 |
| 24-136 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works. | Works Nos. MU34, MU35, MU36, MUT6 and OH4 |
| 24-139 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT6 |
| 24-153 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU34 |
| 24-191 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 5W, MU28, MU34, MUT6, OH3 and OH4 |
| 24-194, 24-195, 24-196, 24-197, 24-198 and 24-199 | Construction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61. | Work No. 5W |
| 25-01, 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-08, 25-09, 25-10, 25-11, 25-12, 25-13, 25-14, 25-15, 25-16, 25-17, 25-18, 25-19, 25-20, 25-21, 25-22, 25-23, 25-24, 25-25, 25-26, 25-27, 25-28, 25-29, 25-30, 25-31, 25-32, 25-33, 25-34, 25-35, 25-36, 25-37, 25-38, 25-39, 25-40, 25-41, 25-42, 25-43, 25-44, 25-45, 25-46, 25-47, 25-48, 25-49, 25-50, 25-51, 25-52, 25-53, 25-54, 25-55, 25-56, 25-57, 25-58, 25-59, 25-60, 25-61, 25-62, 25-63, 25-64, 25-65, 25-66, 25-67, 25-68, 25-69, 25-70, 25-71, 25-72, 25-73, 25-74, 25-75, 25-76, 25-77, 25-78, 25-81, 25-82, 25-83, 25-84, 25-85, 25-86, 25-87, 25-88, 25-89, 25-90, 25-91 and 25-92 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT14 |
| 25-79 and 25-80 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT14 |
| 25-93, 25-95, 25-98, 25-99, 25-101, 25-102, 25-106, 25-109 and 25-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU35 |
| 26-17, 26-18, 26-19, 26-20, 26-21, 26-22, 26-23, 26-25, 26-26, 26-27, 26-28, 26-29, 26-30, 26-31, 26-32, 26-33, 26-35, 26-36, 26-37, 26-38, 26-39, 26-40, 26-41, 26-42, 26-44, 26-45, 26-46, 26-47, 26-48, 26-49, 26-50, 26-51, 26-52, 26-53, 26-54, 26-55, 26-56, 26-57, 26-58, 26-59, 26-60, 26-61, 26-62, 26-63, 26-64, 26-65 and 26-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT14 |
| 26-24, 26-34 and 26-43 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT14 |
| 27-01 | Implementation of environmental mitigation works to create a site for protected species. | Works Nos. E21 and E22 |
| 27-02, 27-09, 27-11 and 27-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU37, OH6 and OH7 |
| 27-06 and 27-16 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 |
| 27-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU37 |
| 27-25, 27-27, 27-36, 27-37, 27-38 and 27-39 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU37 |
| 27-35 | To facilitate the construction new highway, three-lane dual carriageway, and to provide temporary storage, laydown areas and working space; provision for temporary access for overhead lines diversion works. | Works Nos. 6C and OH5 |
| 27-40, 27-49, 27-52, 27-55, 27-56, 27-65 and 27-72 | Provision for temporary access for overhead lines diversion works | Work No. OH5 |
| 27-41, 27-42, 27-44, 27-51, 27-53 and 27-54 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH5 |
| 27-45, 27-47, 27-48, 27-50, 27-57, 27-58, 27-59, 27-60, 27-61 and 27-62 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E21 |
| 27-66 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH4 |
| 27-67, 27-68, 27-69, 27-71, 27-74, 27-75, 27-76, 27-80, 27-82, 27-96 and 27-101 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH4 |
| 27-70 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; provision for temporary access for overhead lines diversion works. | Works Nos. OH4 and OH5 |
| 27-77, 27-78, 27-79, 27-81, 27-83, 27-84, 27-86, 27-88, 27-89, 27-91, 27-92, 27-93, 27-94, 27-95, 27-98, 27-99, 27-100, 27-102 and 27-103 | Provision for access for overhead lines diversion works. | Work No. OH4 |
| 28-01 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4, OHT5 and ULH9 |
| 28-02 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MU48 and MUT16 |
| 28-03, 28-13 and 28-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MUT16, MUT18, OH6 and OHT5 |
| 28-04 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6 and OHT5 |
| 28-05 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, CA7, MU40, MU41, MU47, MUT13, MUT16, MUT17 and MUT18 |
| 28-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4 and OHT5 |
| 28-08 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA7, E28 and MU41 |
| 28-09 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6, OH7 and OHT5 |
| 28-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18 and OHT5 |
| 28-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MU48, MUT16 and MUT18 |
| 28-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47, MUT16 and MUT18 |
| 28-16 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH9 |
| 28-21 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, OH6 and OHT5 |
| 28-27 and 28-30 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, MU41 and MU47 |
| 28-31 | Construction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place. | Work No. 7S |
| 28-34, 28-58, 28-104 and 28-107 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU40 |
| 28-35 | Construction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S, MU41 and MU47 |
| 28-37 and 28-39 | Construction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7S and MU47 |
| 28-38, 28-98, 28-100 and 28-103 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40 and MUT13 |
| 28-42 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA6, E27, MU41 and MU47 |
| 28-43 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU47 |
| 28-45 and 28-46 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU41 |
| 28-47 and 28-63 | Temporary construction compound at surface for facilitating main works. | Work No. CA6 |
| 28-49, 28-52, 28-53, 28-54, 28-56, 28-57, 28-59, 28-61, 28-69, 28-70, 28-71, 28-72 and 28-73 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor | Work No. MUT14 |
| 28-50 and 28-51 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT14 |
| 28-60 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU40, MUT13, OH6 and OH7 |
| 28-62 | Temporary construction compound at surface for facilitating main works; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. CA6 and ULH10 |
| 28-64 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA6, E27 and MU41 |
| 28-65 and 28-68 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road. | Work No. 7X |
| 28-67 | Construction of a new private means of access from the improved Brentwood Road; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. 7B, CA6, MU40, MU41, MUT12, MUT13, MUT15 and ULH10 |
| 28-106 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU38, MU40, OH6 and OH7 |
| 28-124 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU39, MU40, MUT12 and MUT15 |
| 28-125 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor | Works Nos. MU39, MU40 and MUT12 |
| 28-127 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40 and MUT12 |
| 28-128 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU40 and MUT12 |
| 28-129 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MU40 |
| 28-131 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39, MU40 and MUT15 |
| 28-132 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G5, MU39, MU40 and MUT15 |
| 28-133 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT15 |
| 28-134 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU40, MU41 and MUT12 |
| 28-135 | Provision for access for utility works. | Work No. MU40 |
| 28-137 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU38 and MUT12 |
| 28-139 and 28-141 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU38 |
| 28-143 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6 and OH7 |
| 28-144 | Installation of a high-pressure gas pipeline. | Work No. G5 |
| 28-145 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G5 |
| 29-03 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA8A, E30, MU54, MU55, MU56, MUT20, OH6, OH7 and OHT6 |
| 29-04 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E30, MU55, MU56, MUT20, OH6 and OH7 |
| 29-05 | The establishment of a temporary utilities logistic hub for facilitating utility works. | Work No. ULH8 |
| 29-10 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU56 |
| 29-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU55, MU56, MUT16, OH6, OH7 and OHT6 |
| 29-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU56, OH6 and OHT6 |
| 29-17 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6 |
| 29-20 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. CA8A, MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6 |
| 29-26 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH6 |
| 29-29, 29-33, 29-39 and 29-51 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU44 |
| 29-31 | Overhead lines diversion works, including the removal of existing overhead lines and pylons. | Works Nos. OH6 and OH7 |
| 29-49 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU55, MUT16, MUT20, OH6 and OH7 |
| 29-61, 29-62, 29-63 and 29-65 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52 and MUT13 |
| 29-113 | Improvements to Woolings Close. | Work No. 7G |
| 29-115 | Improvements to Woolings Close; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7G and MU53 |
| 29-140 and 29-211 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU53 |
| 29-202 and 29-205 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU50 |
| 29-212 and 29-215 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 |
| 29-213 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU49, MUT16, OH6 and OH7 |
| 29-231, 29-238 and 29-242 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU49, MUT16, MUT18, OH6 and OH7 |
| 29-236 and 29-237 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU49 and OH7 |
| 29-245, 29-251 and 29-256 | To facilitate the construction of a realigned section of Rectory Road, and to provide temporary storage, laydown areas and working space. | Work No. 7J |
| 29-247 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU49 and MUT18 |
| 29-248 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU47, MU48, MUT16, MUT18, OH6, OH7, OHT4 and OHT5 |
| 29-249 and 29-250 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU49 |
| 29-258 and 29-268 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU41 and MUT13 |
| 29-262 and 29-267 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU47 and MUT16 |
| 29-263 and 29-266 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU47 |
| 29-264 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 |
| 29-277 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6, OH7, OHT4 and OHT5 |
| 29-282 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E30 and MU57 |
| 29-283 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E30, MU54, MU55, MU57, MUT20 and OH6 |
| 30-01, 30-02, 30-04, 30-05, 30-06, 30-07, 30-08, 30-09, 30-10 and 30-11 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; provision for temporary access for overhead lines diversion works. | Works Nos. CA13, E38, OH6 and OH7 |
| 30-12, 30-14, 30-17, 30-19, 30-20, 30-21, 30-22, 30-23, 30-24, 30-25, 30-26, 30-27, 30-28, 30-29, 30-30, 30-31, 30-32, 30-33, 30-34, 30-35, 30-36, 30-37, 30-38, 30-39, 30-40, 30-41, 30-42, 30-43, 30-44, 30-45, 30-46, 30-47, 30-48, 30-49, 30-50, 30-51, 30-52, 30-53, 30-54, 30-55, 30-56, 30-57, 30-58, 30-59, 30-60, 30-61, 30-62, 30-63, 30-64, 30-65, 30-66, 30-67, 30-68, 30-69, 30-71, 30-72 and 30-73 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA9 |
| 30-74, 30-75, 30-76, 30-77, 30-78, 30-79 and 30-80 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 |
| 31-02, 31-08, 31-09, 31-13, 31-18 and 31-19 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 |
| 31-05 and 31-06 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH6 |
| 31-07 and 31-11 | Installation of a high-pressure gas pipeline. | Work No. G6 |
| 31-10, 31-14, 31-16, 31-17, 31-20, 31-21 and 31-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU42 |
| 31-15 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU42 |
| 32-05 and 32-18 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 |
| 32-07, 32-12, 32-13, 32-14, 32-57, 32-66, 32-92, 32-102, 32-115, 32-117, 32-119, 32-134, 32-137, 32-147, 32-149, 32-152 and 32-186 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 |
| 32-11, 32-15, 32-16 and 32-17 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU46 |
| 32-25 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU46, MU47 and MUT17 |
| 32-33, 32-35 and 32-36 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU47 |
| 32-39, 32-44, 32-48, 32-55, 32-135, 32-157, 32-164 and 32-169 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU43 |
| 32-49 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7X, MU41 and MU43 |
| 32-53 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU41 |
| 32-58 and 32-59 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU45 |
| 32-61 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU43 |
| 32-63 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6, MU45 and MUT19 |
| 32-78, 32-81 and 32-85 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road. | Work No. 7X |
| 32-84 | Construction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 7X and MU43 |
| 32-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU43 and MUT19 |
| 32-93 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MUT19 |
| 32-103, 32-116, 32-118, 32-120, 32-130, 32-138, 32-143 and 32-144 | Installation of a high-pressure gas pipeline. | Work No. G6 |
| 32-104 | Provision for temporary access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 |
| 32-109 | To facilitate the improvement to the existing dual carriageway A13, and to provide temporary storage, laydown areas and working space. | Work No. 7F |
| 32-110 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT19 |
| 32-111, 32-122, 32-124, 32-125, 32-128, 32-129 and 32-133 | Provision for access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 |
| 32-136 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39, MU43 and MUT15 |
| 32-139, 32-140, 32-141, 32-142, 32-145, 32-148, 32-155, 32-159, 32-160, 32-168, 32-170, 32-171, 32-172, 32-173, 32-174 and 32-179 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU39 and MUT15 |
| 32-153, 32-158 and 32-166 | Provision for access for works involving the diversion of existing gas pipeline. | Work No. G6b |
| 32-156 and 32-163 | Installation of a isolation valve | Work No. G6b |
| 32-162, 32-165, 32-175, 32-176, 32-180 and 32-181 | Provision for temporary access for works involving the diversion of existing gas pipeline. | Work No. G6b |
| 32-177 and 32-178 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E22 |
| 32-182 and 32-183 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH6 |
| 33-01 and 33-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. MUT24, OH6 and OH7 |
| 33-02 and 33-08 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA9, MU60 and MUT23 |
| 33-05 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. G6, MU55, MUT13, MUT24, OH6, OH7 and OHT7 |
| 33-06, 33-92, 33-179, 33-242, 33-249, 33-254, 33-255, 33-257, 33-259, 33-263, 33-265, 33-268, 33-276, 33-280, 33-281, 33-282 and 33-285 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 |
| 33-17 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH6, OH7 and OHT7 |
| 33-19 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU57 |
| 33-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 |
| 33-30 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. CA9, MU55, MU57, MU58, OH6, OH7 and ULH7 |
| 33-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU54, MU55, MU57, MUT20 and OH6 |
| 33-36 | Temporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species; and installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA10, E34, G6, MU55, MU60, MUT13, MUT21 and MUT22 |
| 33-37 | Temporary construction compound at surface for facilitating main works. To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Works Nos. CA10 and G6 |
| 33-42 | To facilitate the construction of a new private means of access for maintenance of the new drainage structures and to provide temporary storage, laydown areas and working space. | Work No. 8K |
| 33-47, 33-48, 33-49, 33-53, 33-54, 33-55, 33-56, 33-61, 33-82, 33-83, 33-84, 33-93, 33-94, 33-100, 33-101, 33-104, 33-106, 33-108, 33-115, 33-116, 33-118, 33-154, 33-155, 33-173, 33-178, 33-184, 33-188 and 33-221 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT22 |
| 33-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59 and MUT13 |
| 33-67 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59 and MU60 |
| 33-68 and 33-70 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT21 |
| 33-69, 33-71, 33-77, 33-78, 33-79, 33-80 and 33-81 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU59, MU60 and MUT21 |
| 33-74 and 33-75 | To facilitate the construction of a realigned section of Stifford Clays road, and to provide temporary storage, laydown areas and working space. | Work No. 7L |
| 33-86, 33-88 and 33-89 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MUT22 |
| 33-87 | Implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E33 and MUT22 |
| 33-90, 33-91, 33-99, 33-103, 33-105, 33-107, 33-114, 33-119, 33-129, 33-134, 33-146, 33-152, 33-157, 33-158, 33-159, 33-160, 33-162, 33-165, 33-168, 33-169, 33-170, 33-172, 33-174, 33-176, 33-177, 33-181, 33-183, 33-187, 33-190, 33-192, 33-195, 33-196, 33-197, 33-199, 33-200, 33-202, 33-203, 33-205, 33-206, 33-208, 33-209, 33-210, 33-211, 33-212, 33-215, 33-217, 33-219, 33-220, 33-222, 33-225, 33-227, 33-228, 33-230, 33-231, 33-232, 33-233, 33-236, 33-238, 33-239, 33-240, 33-241, 33-243, 33-244, 33-245, 33-246, 33-247, 33-251, 33-252, 33-256, 33-258, 33-260, 33-261, 33-267, 33-269, 33-271, 33-272, 33-274, 33-275, 33-279, 33-283, 33-284, 33-286 and 33-287 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU60 and MUT21 |
| 33-98 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT13 |
| 33-109, 33-113, 33-117, 33-120, 33-121, 33-122, 33-123, 33-124, 33-125, 33-126, 33-127, 33-128, 33-130, 33-131, 33-132, 33-133, 33-135, 33-136, 33-137, 33-138, 33-139, 33-140, 33-141, 33-142, 33-143, 33-144, 33-145, 33-147, 33-148, 33-149, 33-150, 33-151, 33-153, 33-156, 33-161, 33-163, 33-164, 33-166, 33-167, 33-171, 33-180, 33-185 and 33-186 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU52 |
| 33-110 and 33-112 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52, MU60, MUT21 and MUT22 |
| 33-175, 33-248, 33-250, 33-266, 33-270, 33-273 and 33-277 | Installation of a high-pressure gas pipeline. | Work No. G6 |
| 33-182, 33-189 and 33-191 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU52 and MUT13 |
| 33-194 and 33-229 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E32 |
| 33-201 and 33-207 | Improvements to Woolings Close. | Work No. 7G |
| 33-224, 33-226, 33-234, 33-235 and 33-237 | Provision for temporary access for works involving the installation of a high-pressure gas pipeline. | Work No. G6 |
| 33-253, 33-262 and 33-264 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6, MU60 and MUT21 |
| 33-278 | Installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G6 and MU46 |
| 33-290 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU46 |
| 34-01, 34-03 and 34-05 | Provision for temporary access and traffic management for the temporary construction compound; provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. CA13, E38, MUT24, OH6 and OH7 |
| 34-02, 34-24 and 34-42 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 |
| 34-04 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 |
| 34-06, 34-15, 34-17, 34-19, 34-23, 34-25, 34-26, 34-41, 34-43, 34-47 and 34-48 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works. | Works Nos. MUT24, OH6 and OH7 |
| 34-20 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G6 and ULH5 |
| 34-27 and 34-28 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; provision for temporary access to the temporary utilities logistic hub. | Works Nos. G6 and ULH5 |
| 34-29, 34-32 and 34-46 | To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G6 |
| 34-30, 34-31 and 34-45 | Installation of a high-pressure gas pipeline. | Work No. G6 |
| 34-33, 34-38, 34-39 and 34-40 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT23 |
| 34-44 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU60 and MUT23 |
| 35-01, 35-03 and 35-07 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 |
| 35-02 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 |
| 35-05, 35-06, 35-19, 35-20, 35-21, 35-53, 35-54 and 35-56 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 |
| 35-09 and 35-55 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E36 and OH7 |
| 35-13 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. E36, FCA3 and OH7 |
| 35-29 and 35-30 | Temporary construction compound at surface for facilitating main works. | Work No. CA11 |
| 35-32 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA11, MUT13, MUT22 and MUT25 |
| 35-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT22 and MUT25 |
| 35-34 and 35-35 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT25 |
| 35-36, 35-42, 35-58, 35-59 and 35-61 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT22 |
| 36-01 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E38 |
| 36-02 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA13, E38 and MUT24 |
| 36-03 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E38 |
| 36-04 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 |
| 36-05 | Provision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species. | Works Nos. CA13 and E38 |
| 36-06 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT24 |
| 37-05 | Implementation of environmental mitigation works to create a site for protected species. | Works Nos. E37 and E39 |
| 37-06 and 37-07 | Provision for access for environmental mitigation works to create a site for protected species. | Works Nos. E37 and E39 |
| 38-01 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and temporary construction compound at surface for facilitating main works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, CA13, MU64, MU65, MUT26 and MUT27 |
| 38-02 and 38-10 | Temporary construction compound at surface for facilitating main works. | Work No. CA13 |
| 38-03 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU64 and MUT27 |
| 38-09 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU65 |
| 38-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU65 |
| 38-14 and 38-24 | Provision for temporary access and traffic management for the temporary construction compound; and implementation of environmental mitigation works to create a site for protected species. | Works Nos. CA13 and E40 |
| 38-15 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU64 |
| 38-16 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA13 |
| 38-18 | To facilitate the construction of a new public right of way over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space. | Work No. 8C |
| 38-19 | To facilitate the construction of a new drainage attenuation pond with associated drainage facilities, laydown areas and working space. | Work No. 8H |
| 38-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU63 |
| 38-22 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 8M, G8, MU63 and OH7 |
| 38-23 | To facilitate the construction of a new public right of way and to provide temporary storage, laydown areas and working space. | Work No. 8M |
| 38-25 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 8M and OH7 |
| 38-28 and 38-29 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136. | Work No. 8M |
| 38-31 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G8 and MU63 |
| 38-32 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G8, MU62, MU63, OH7, OHT8 and ULH4 |
| 38-33 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU62, MU63 and OH7 |
| 38-34 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E40 |
| 38-35 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. OH7 and OHT8 |
| 38-36 and 38-39 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G8 |
| 38-37 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G8 and ULH4 |
| 38-38 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 |
| 38-40, 38-41, 38-42, 38-44, 38-46, 38-49, 38-51, 38-52, 38-59 and 38-64 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 |
| 38-43, 38-60, 38-61 and 38-65 | Construction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8J and E36 |
| 38-47 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. E36, FCA4 and MU61 |
| 38-53, 38-54 and 38-55 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area. | Works Nos. E36 and FCA3 |
| 39-01 | Temporary construction compound at surface for facilitating main works. | Work No. CA14 |
| 39-02 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Works Nos. 8D and G9 |
| 39-04 | Diversion of existing gas pipeline. | Work No. G9 |
| 39-05, 39-14 and 39-15 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU71 |
| 39-06 and 39-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU71 |
| 39-08, 39-26 and 39-46 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space. | Work No. 8D |
| 39-12 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane. | Work No. 8N |
| 39-13 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA14 and MUT29 |
| 39-17, 39-18, 39-21, 39-27 and 39-28 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT29 |
| 39-20 | Construction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8D and MUT29 |
| 39-22 and 39-25 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G9 |
| 39-23 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9, MU68, MU69 and MU70 |
| 39-29 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT28 and MUT29 |
| 39-30 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU69 |
| 39-31 and 39-32 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 |
| 39-33 | Construction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8D, MUT28 and MUT29 |
| 39-50, 39-52, 39-54, 39-55, 39-57 and 39-59 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU66 |
| 39-65 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, MU69 and MUT26 |
| 39-66 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU69 and MUT26 |
| 39-67 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9, MU69 and MUT27 |
| 39-68 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Works Nos. G9 and MUT27 |
| 39-69, 39-70 and 39-74 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MUT26 |
| 39-72 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT27 |
| 39-77 | To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. | Work No. G8 |
| 39-78 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G8, MU64 and MUT27 |
| 39-80 and 39-81 | To facilitate the construction of a three-lane carriageway northbound and two-lane carriageway southbound, and to provide temporary storage, laydown areas and working space. | Work No. 8A |
| 39-82 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E42 |
| 39-83 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M, E42 and MUT26 |
| 39-84 | Temporary construction compound at surface for facilitating main works. | Work No. CA13 |
| 40-21 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space; and yo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Works Nos. 8D, G9 and MU71 |
| 40-22 | Diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. G9 and MU71 |
| 41-01 and 41-02 | Provision for access for environmental mitigation works to create a site for protected species. | Work No. E42 |
| 41-03 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E42 |
| 41-04, 41-05, 41-08 and 41-32 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH7 |
| 41-06, 41-07, 41-09, 41-15, 41-16, 41-18, 41-19, 41-25, 41-26 and 41-27 | Provision for temporary access for overhead lines diversion works. | Work No. OH7 |
| 41-10 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MUT26 and OH7 |
| 41-11 | Construction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 8M and MUT26 |
| 41-13, 41-14, 41-44, 41-46, 41-47, 41-48, 41-49 and 41-51 | Provision for access for overhead lines diversion works. | Work No. OH7 |
| 41-23 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU63, MUT26 and OH7 |
| 41-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU63 and OH7 |
| 41-28, 41-29, 41-30, 41-31, 41-45 and 41-50 | To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space. | Work No. OH7 |
| 41-33, 41-34, 41-35, 41-36, 41-37, 41-41 and 41-42 | Implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Work No. E36 |
| 41-38 and 41-43 | Construction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8J and E36 |
| 41-39 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136. | Work No. 8M |
| 41-40 | Construction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. | Works Nos. 8M and E36 |
| 42-01, 42-02 and 42-03 | Implementation of environmental mitigation works to create a site for protected species. | Work No. E43 |
| 42-04 and 42-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 |
| 42-05, 42-06 and 42-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU75 and MU76 |
| 42-08 and 42-12 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72 and MU76 |
| 42-09, 42-10 and 42-13 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72 and MU75 |
| 42-14 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU73 and MU75 |
| 42-16 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU75 |
| 42-17 and 42-21 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 |
| 42-22 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75 and MU76 |
| 42-23 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75 and MUT30 |
| 42-24 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU76, MU77 and MUT30 |
| 42-25 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU75, MU76 and MUT30 |
| 42-34 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU73 |
| 42-75 | To facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space. | Work No. 9E |
| 42-99 and 42-124 | Temporary possession of the railway line railway to facilitate the construction of a new bridge to carry a new public right of way over the existing Upminster and Grays Branch railway line. | Work No. 9M |
| 42-115 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU73, MU74 and MU76 |
| 42-116 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU74 |
| 42-127 | To facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space. | Work No. 8D |
| 42-128 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane; and temporary construction compound at surface for facilitating main works. | Works Nos. 8N and CA14 |
| 42-131, 42-132, 42-133 and 42-134 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA15A and MU76 |
| 42-135, 42-136 and 42-137 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A |
| 42-138 | Construction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane. | Work No. 8N |
| 42-139, 42-140, 42-141, 42-142, 42-143, 42-144, 42-145, 42-146, 42-147, 42-148, 42-149, 42-150, 42-151, 42-152, 42-153, 42-154, 42-155, 42-156, 42-157, 42-158, 42-159, 42-160, 42-161, 42-162, 42-163, 42-164, 42-165, 42-166, 42-167, 42-168, 42-169, 42-170, 42-171, 42-172, 42-173, 42-174, 42-175, 42-177, 42-178, 42-179, 42-180, 42-181, 42-182, 42-184 and 42-185 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 |
| 42-176 and 42-183 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MUT28 and MUT29 |
| 43-01, 43-02, 43-03 and 43-05 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 |
| 43-07 | Construction of a new permissive path over the new A122 Lower Thames Crossing and the improved section of the M25 Junction; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, MU72, MU78 and OH8 |
| 43-09 and 43-108 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU72, MU78 and OH8 |
| 43-10 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 |
| 43-18 and 43-104 | Construction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, MU72, MU78 and OH8 |
| 43-19 | Construction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. 9O, E46, MU72 and OH8 |
| 43-27 | Landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing. | Work No. 9O |
| 43-28 | Construction of a new permissive path along the existing FP230, and landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing. | Work No. 9O |
| 43-35, 43-47, 43-53, 43-106, 43-107, 43-109 and 43-110 | Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Work No. OH8 |
| 43-40, 43-41, 43-43, 43-46, 43-63, 43-64, 43-65, 43-66, 43-67, 43-68, 43-69, 43-70, 43-71, 43-72, 43-73, 43-74, 43-75, 43-76, 43-77, 43-78, 43-79, 43-80, 43-82, 43-83, 43-84, 43-85, 43-86, 43-87, 43-88, 43-90, 43-93, 43-94, 43-95, 43-98, 43-101, 43-102, 43-112, 43-113 and 43-114 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A |
| 43-49 | Construction of a new permissive path along the existing FP230. | Work No. 9O |
| 43-54, 43-55, 43-56, 43-57, 43-58, 43-59, 43-60, 43-61, 43-62, 43-81, 43-89, 43-91 and 43-92 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA15A and MUT28 |
| 43-96, 43-97, 43-99 and 43-100 | Provision for access for overhead lines diversion works. | Work No. OH8 |
| 43-103 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MUT28 |
| 43-105 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. | Works Nos. MU72 and OH8 |
| 43-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU78 |
| 44-01, 44-02, 44-03 and 44-06 | Construction of a new flood compensation area. | Work No. FCA7 |
| 44-04 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU87 |
| 44-05 | Construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. FCA7 and MU72 |
| 44-07 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU83 |
| 44-08 | Construction of a new permissive path from Thames Chase Forest, a new permissive path to the new culvert and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9O and MU72 |
| 44-09 and 44-17 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU79, MU80, MU82 and MU83 |
| 44-10, 44-44 and 44-84 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU80 |
| 44-11 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU86 |
| 44-13, 44-14 and 44-94 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU72 |
| 44-16 and 44-90 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU84 |
| 44-20 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU83 |
| 44-22 and 44-56 | Temporary possession of railway line to facilitate the construction of earthworks associated with the new A122 Lower Thames Crossing two-lane link road from the M25 northbound carriageway to M25 junction 29 link road. | Work No. 9D |
| 44-64, 44-72 and 44-73 | To facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space. | Work No. 9E |
| 44-68 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU81 and MU84 |
| 44-80 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU81 and MU83 |
| 44-81 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU81, MU82 and MU83 |
| 44-85, 44-87 and 44-93 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU72 |
| 44-86 and 44-91 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU80, MU81, MU82 and MU83 |
| 44-88 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU72, MU79, MU80 and MU82 |
| 44-89, 44-95 and 44-96 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU80 and MU81 |
| 44-92 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU84 |
| 44-98, 44-99 and 44-100 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU81 |
| 44-101, 44-102, 44-103, 44-104, 44-105, 44-106, 44-107, 44-108, 44-109, 44-110, 44-111, 44-113, 44-114, 44-115, 44-116, 44-117, 44-118 and 44-119 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA15A |
| 44-112, 44-120, 44-121, 44-122, 44-123 and 44-124 | Provision for access for utility works. | Work No. MU84 |
| 45-01, 45-02, 45-03, 45-04, 45-05, 45-06, 45-07, 45-09, 45-12, 45-39, 45-43, 45-45, 45-46, 45-69 and 45-70 | Improvement works to a section of the existing two-lane dual carriageway A127 highway. | Work No. 9J |
| 45-08, 45-15, 45-16, 45-17, 45-18, 45-20, 45-22, 45-28, 45-67 and 45-68 | To facilitate the improvement works to a section of the existing two-lane dual carriageway A127 highway, and to provide temporary storage, laydown areas and working space. | Work No. 9J |
| 45-10, 45-11, 45-19, 45-21, 45-23, 45-24, 45-25, 45-26, 45-29, 45-31, 45-33, 45-38, 45-42, 45-50, 45-52 and 45-62 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU91 |
| 45-47, 45-48 and 45-49 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout. | Work No. 9H |
| 45-66 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9H and MU91 |
| 45-71 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU88 |
| 45-72 | Improvements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9H and MU88 |
| 45-79, 45-88 and 45-107 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU87 |
| 45-87, 45-89 and 45-108 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Work No. MU87 |
| 45-99 and 45-100 | Improvement works to the existing private means of access between the improved M25 junction 29 roundabout and Codham Hall Lane.; utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. 9I and MU88 |
| 45-105 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU88 |
| 45-110 and 45-112 | Provision for access for utility works. | Work No. MU87 |
| 45-111 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Works Nos. MU86 and MU87 |
| 45-120 | Construction of protection measures for retention of the existing infrastructure. | Work No. 9P |
| 45-121 | Temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers. | Works Nos. CA16, MU85, MU87 and MUT32 |
| 45-132 | Temporary construction compound at surface for facilitating main works. | Work No. CA16 |
| 45-137, 45-139, 45-141, 45-143, 45-144, 45-145, 45-146, 45-147, 45-148, 45-149, 45-150, 45-151, 45-152, 45-153, 45-154, 45-159, 45-161, 45-164, 45-166, 45-167, 45-178, 45-179 and 45-180 | Provision for temporary access and traffic management for the temporary construction compound. | Work No. CA16 |
| 45-155 and 45-160 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA16, MU85 and MUT32 |
| 45-158 | Provision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. CA16 and MU85 |
| 45-165, 45-168, 45-171, 45-172, 45-173 and 45-174 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU85 |
| 45-169 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Works Nos. MU85 and MUT32 |
| 45-175, 45-176 and 45-177 | Provision for access for utility works. | Work No. MU84 |
| 46-01, 46-02 and 46-03 | Improvement works to a section of the existing two-lane dual carriageway A127 highway. | Work No. 9J |
| 46-04 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds. | Work No. E51 |
| 46-06 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. E51, G10 and ULH2 |
| 46-08, 46-09, 46-11, 46-12 and 46-13 | Installation of a high-pressure gas pipeline. | Work No. G10 |
| 46-23, 46-24 and 46-25 | Provision for access for utility works. | Work No. MU92 |
| 46-26 | Utility works, including the installation or diversion of underground utilities within a multi-utility corridor. | Work No. MU92 |
| 46-52 | To facilitate utility works, and to provide temporary storage, laydown areas and working space. | Work No. MU92 |
| 46-55 | Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works. | Works Nos. G10 and ULH2 |
| 47-26 | Implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds. | Work No. E51 |
SCHEDULE 12 ¶
ROAD USER CHARGING PROVISIONS FOR USE OF THE LOWER THAMES CROSSING
Article 45
I1061 Interpretation¶
-
“the 2013 Order” means the A282 Trunk Road (Dartford-Thurrock Crossing Charging Scheme) Order 2013171 as may be amended from time to time;
-
“custodian” means a person authorised in writing by the Secretary of State to keep in storage motor vehicles which are removed under this Schedule;
-
“Dartford-Thurrock Crossing” means the road which is a length of the A282 trunk road starting at a point below the north face of the bridge carrying Crossways Boulevard University Way (A206) over the trunk road at junction 1A at Dartford, in the County of Kent, and extending northwards to a point approximately 300 metres north of where it crosses London Road at West Thurrock, in the County of Essex and carried through twin tunnels beneath the River Thames and on the Queen Elizabeth II bridge over the River Thames;
-
“Enforcement Regulations” means the Road User Charging Schemes (Penalty Charges, Adjudication and Enforcement) (England) Regulations 2013172 as may be amended from time to time;
-
“local resident” means a person who permanently resides in the borough of Gravesham or Thurrock;
-
“motor vehicle” means a mechanically propelled vehicle intended or adapted for use on roads; and
-
“replacement Dartford-Thurrock Charging Order” means where the 2013 Order has been revoked, any order made under Part 3 of the 2000 Act or the provisions of any other enactment that provides for the imposition of road user charging in relation to the Dartford-Thurrock Crossing as may be amended from time to time.
I1072 Application of the Enforcement Regulations¶
The Enforcement Regulations apply to this Schedule as though it were a charging scheme for the purposes of those regulations.I1083 Imposition of charges for the tunnel area¶
I1094 Payment of charges¶
I1105 Payments for local residents¶
I1116 Other payments¶
I1127 Penalty charge for non-payment of road user charge¶
I1138 Exercise of powers¶
I1149 Examination of motor vehicles¶
The Secretary of State or a person authorised by the Secretary of State may examine a motor vehicle whilst it is on a road to ascertain if any of the circumstances described in regulation 22 of the Enforcement Regulations exists.I11510 Entering motor vehicles¶
The Secretary of State or a person authorised by the Secretary of State may enter a motor vehicle whilst it is on a road where they have reasonable grounds for suspecting that any of the circumstances described in regulation 23(1) of the Enforcement Regulations exists.I11611 Seizure¶
The Secretary of State or a person authorised by the Secretary of State may seize anything (if necessary by detaching it from a motor vehicle) and detain it as evidence of the failure to pay a charge under paragraph 3(1).I11712 Immobilisation of motor vehicles¶
I11813 Removal, storage and disposal of motor vehicles¶
SCHEDULE 13 ¶
LOWER THAMES CROSSING BYELAWS
Article 51
PART 1 PRELIMINARY¶
I1191 Citation¶
These byelaws may be cited as the Lower Thames Crossing Byelaws 2025 and are deemed to have been made by the undertaker under article 51(1) (byelaws relating to the tunnel area) of the A122 (Lower Thames Crossing) Development Consent Order 2025 and confirmed by the Secretary of State as provided for by article 51(2) of that Order.I1202 Interpretation¶
-
“authorised person” means–
-
a person acting in the course of that person’s duties who—
-
is an employee, agent, contractor or sub-contractor of the undertaker; or
-
is authorised by the undertaker to exercise one or more of its functions under the A122 (Lower Thames Crossing) Development Consent Order 2025; or
-
-
a constable, Police Community Support Officer, an officer of the Driver and Vehicle Standards Agency, an officer of the Health and Safety Executive, a person authorised for the purposes of section 44 (powers of fire-fighters etc. in an emergency etc.) of the Fire and Rescue Services Act 2004, a person accredited by or under section 41 (accreditation under community safety accreditation schemes) of the Police Reform Act 2002, a traffic officer, acting in the execution of that person’s duties within the tunnel area;
-
-
“the byelaws” means these byelaws;
-
“motor vehicle” means a mechanically propelled vehicle intended or adapted for use on roads;
-
“notice” includes a sign, signal and a digital or other display, and in appropriate circumstances, an audible announcement;
-
“tobacco product” has the same meaning as given in section 1 of the Tobacco Products Duty Act 1979173 and includes a vaporiser;
-
“traffic officer” means an individual designated under section 2 (designation of traffic officers) of the 2004 Act;
-
“trailer” means a vehicle (including a horse box) designed or adapted to be towed by a motor vehicle;
-
“the tunnel approaches” means the southern and northern approaches to the tunnel between the barrier gantry and the portal shown on the tunnel area plan;
-
“the tunnel area” means the extent of the public highway to be comprised in and along the tunnel and the tunnel approaches and shown on the tunnel area plan;
-
“the tunnel area plan” means the plan of that description listed in Schedule 16 (documents to be certified) certified by the Secretary of State as the tunnel area plan for the purposes of the A122 (Lower Thames Crossing) Development Consent Order 2025;
-
“tunnel equipment” includes plant and machinery, and any emergency, safety or communications equipment;
-
“tunnel infrastructure” means the structure (including the carriageway) of the tunnel area;
-
“tunnel” means the tunnel under the River Thames connecting Gravesend to Thurrock constructed under the A122 (Lower Thames Crossing) Development Consent Order 2025 and shown as the tunnel on the tunnel area plan;
-
“the undertaker” means National Highways Limited (Company No. 09346363) of Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ; and
-
“vaporiser” means an electronic device that can be used to deliver nicotine or other substances to a person inhaling from the device.
PART 2 RESTRICTIONS IN THE TUNNEL AREA¶
I1213 General safety¶
I1224 Traffic regulation¶
I1235 Breakdowns and falling loads¶
I1246 Restrictions on conduct in the tunnel area¶
PART 3 ENFORCEMENT¶
I1257 Compliance with instructions, etc.¶
I1268 Identification of authorised persons¶
An authorised person who is exercising any power conferred on an authorised person by any of the byelaws must produce a form of identification which includes the name of the authorised person’s employer and a means of identifying the authorised person, when requested to do so.I1279 Breaches by authorised persons¶
An authorised person acting in the course of the authorised person’s duties is not liable for a breach of a byelaw.I12810 Attempted breach¶
SCHEDULE 14 ¶
PROTECTIVE PROVISIONS
Articles 37 and 59
PART 1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS¶
I1291 Application¶
For the protection of the utility undertakers referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertaker concerned.I1302 Interpretation¶
In this Part of this Schedule—- “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means—
- in the case of an electricity undertaker, electric lines or electrical plant (as defined in section 64 of the Electricity Act 1989175), belonging to or maintained by that utility undertaker;
- in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter within the meaning of Part 1 of the Gas Act 1986176 for the purposes of gas supply;
- in the case of a water undertaker, mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; and
- in the case of a sewerage undertaker—
- any drain or works vested in the utility undertaker under the Water Industry Act 1991177; and
- any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) (adoption of sewers and disposal works)178 of that Act or an agreement to adopt made under section 104 (agreement to adopt sewers, drains or sewage disposal works at a future date)179 of that Act,
- “functions” includes powers and duties;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
- “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed;
- “utility undertaker” means—
- any licence holder within the meaning of Part 1 (electricity supply) of the Electricity Act 1989;
- a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986;
- a water undertaker within the meaning of the Water Industry Act 1991; and
- a sewerage undertaker within the meaning of Part 1 (preliminary) of the Water Industry Act 1991,
I1313 On street apparatus¶
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.I1324 Apparatus in stopped up streets¶
I1335 Protective works to buildings¶
The undertaker, in the case of the powers conferred by article 20 (protective work to land and buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.I1346 Acquisition of land¶
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.I1357 Removal of apparatus¶
I1368 Facilities and rights for alternative apparatus¶
I1379 Retained apparatus¶
Expenses and costs¶
Co-operation¶
PART 2 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS¶
I14214 Application¶
For the protection of any operator, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the operator.Interpretation¶
- “the 2003 Act” means the Communications Act 2003180;
- “electronic communications apparatus” has the same meaning as in the electronic communications code;
- “the electronic communications code” has the same meaning as in section 106 (application of the electronic communications code)181 of the 2003 Act;
- “electronic communications code network” means—
- so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; and
- an electronic communications network which the undertaker is providing or proposing to provide;
- “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act;
- “infrastructure system” has the same meaning as in the electronic communications code and references to providing an infrastructure system are to be construed in accordance with paragraph 7(2) (infrastructure system) of that code; and
- “operator” means the operator of an electronic communications code network.
PART 3 FOR THE PROTECTION OF DRAINAGE AUTHORITIES¶
I14618 Application¶
The provisions of this Part have effect for the protection of the drainage authority unless otherwise agreed in writing between the undertaker and the drainage authority.I14719 Interpretation¶
In this Part of this Schedule—- “construction” includes execution, placing, altering, replacing, relaying and removal; and “construct” and “constructed” must be construed accordingly;
- “drainage authority” means in relation to an ordinary watercourse, the drainage board concerned within the meaning of section 23 (prohibition on obstructions etc. in watercourses)182 of the Land Drainage Act 1991;
- “drainage work” means any ordinary watercourse and includes any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage or flood defence in connection with an ordinary watercourse which is the responsibility of the drainage authority;
- “ordinary watercourse” has the meaning given by section 72 (interpretation) of the Land Drainage Act 1991;
- “plans” includes any information reasonably required by the drainage authority including location details, grid references, sections, drawings, specifications, assessments and method statements; and
- “specified work” means any of the following works carried out in relation to any ordinary watercourse—
- erecting any mill dam, weir or other similar obstruction to the flow of the watercourse, or raising or otherwise altering any such obstruction;
- the construction or alteration of a bridge or other structure;
- erecting a culvert in the watercourse; or
- altering a culvert in a manner that would be likely to affect the flow of the watercourse.
Approval of plans¶
I15022 Specified and protective works¶
I15123 Maintenance of drainage works¶
Expenses and indemnity¶
I15628 Disputes¶
Any dispute arising between the undertaker and the drainage authority under this Part is to be determined by arbitration in accordance with article 64 (arbitration).PART 4 FOR THE PROTECTION OF RAILWAY INTERESTS¶
I15729 Application¶
The following provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and the Company.Interpretation¶
- “Company” means Network Rail or, as the case may be, HS1;
- “concession agreement” means the agreement between the Secretary of State for Transport and HS1 Limited for the design, construction, financing, operation, repair and maintenance of High Speed 1, as amended or supplemented from time to time;
- “construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;
- “the engineer” means an engineer appointed by the Company for the purposes of this Order;
- “High Speed 1” means the high speed rail link between St Pancras in the London Borough of Camden and the Channel Tunnel Portal at Castle Hill, Folkestone, Kent and the international stations at St Pancras, Stratford and Ebbsfleet and Ashford and all associated track, facilities and installations, including the Waterloo Connection and the maintenance depots at Temple Mills and Singlewell;
- “HS1” means High Speed One (HS1) Limited (company number 06045862, whose registered office is at 5th Floor, Kings Place, 90 York Way, London N1 9AG) and any associated company of High Speed One (HS1) Limited which holds property for railway purposes and for the purpose of this definition “associated company” means any company which is (within the meaning of section 1159 (meaning of “subsidiary” etc.)183 of the Companies Act 2006)) the holding company of High Speed One (HS1) Limited, a subsidiary of High Speed One (HS1) Limited or another subsidiary of the holding company of High Speed One (HS1) Limited;
- “network licence” means the network licence, as the same is amended from time to time, granted to Network Rail by the Secretary of State in exercise of powers under section 8 (licences)184 of the Railways Act 1993;
- “Network Rail” means Network Rail Infrastructure Limited (company number 02904587, whose registered office is at 1 Eversholt Street, London NW1 2DN) and any associated company of Network Rail Infrastructure Limited which holds property for railway purposes and for the purpose of this definition “associated company” means any company which is (within the meaning of section 1159 of the Companies Act 2006) the holding company of Network Rail Infrastructure Limited, a subsidiary of Network Rail Infrastructure Limited or another subsidiary of the holding company of Network Rail Infrastructure Limited;
- “plans” includes sections, designs, design data, software, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of railway property;
- “protective works” means any works specified by the engineer under paragraph 32;
- “railway operational procedures” means procedures specified under any access agreement (as defined in the Railways Act 1993) or station lease;
- “railway property” means any railway belonging to the Company and—
- any station, land, works, apparatus and equipment belonging to the Company and connected with any such railway; and
- any easement or other property interest held or used by the Company for or connected with the purposes of such railway or works, apparatus or equipment; and
- “specified work” means so much of any of the authorised development as is, or is to be, situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property.
- “EMI” means, subject to sub-paragraph (2), electromagnetic interference with the Company’s apparatus generated by the operation of the authorised development where such interference is of a level which adversely affects the safe operation of the Company’s apparatus;
- “the Company’s apparatus” means any lines, circuits, wires, apparatus or equipment (whether or not modified or installed as part of the authorised development) which are owned or used by the Company for the purpose of transmitting or receiving electrical energy or of radio, telegraphic, telephonic, electric, electronic or other like means of signalling or other communications.
- “the relevant costs” means the costs, direct losses and expenses (including loss of revenue) properly and reasonably incurred by each train operator as a consequence of any restriction of the use of the Company’s railway network as a result of the construction, maintenance or failure of a specified work or a protective work or any such act or omission as mentioned in sub-paragraph (1); and
- “train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 (licences) of the Railways Act 1993.
| (1) Location | (2) Plot Reference Number shown on Land Plan | (3) Height above the railhead |
|---|---|---|
| Franks Farm | 44-24, 44-45 and 44-53 | 7800 mm |
| FP252 | 42-123 | 7500 mm |
| Tilbury Viaduct | 23-77 | 6800 mm |
PART 5 FOR THE PROTECTION OF SPECIFIED GAS UNDERTAKERS¶
I17648 Application¶
For the protection of the gas undertakers referred to in this Part of this Schedule, the following provisions will, unless otherwise agreed in writing between the undertaker and the gas undertaker concerned, have effect.I17749 Interpretation¶
In this Part of this Schedule—- “alternative apparatus” means appropriate alternative apparatus to the reasonable satisfaction of the gas undertaker to enable the gas undertaker to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means any gas mains, pipes, pressure governors, ventilators, cathodic protections, cables or other apparatus belonging to or maintained by the gas undertaker for the purposes of its undertaking together with any replacement apparatus and such other apparatus constructed pursuant to this Order that becomes operational apparatus of the gas undertaker for the purposes of its undertaking and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;
- “Cadent Gas Limited” means Cadent Gas Limited (company number 10080864), whose registered office is at Pilot Way, Ansty, Coventry, England CV7 9JU;
- “commence” and “commencement” include any surveys, monitoring, work operations, remedial work in respect of any contamination or other adverse ground conditions, the receipt and erection of construction plant and equipment, and non-intrusive investigations for the purpose of assessing ground conditions;
- “deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary or replace existing easements, agreements, enactments and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule;
- “facilities and rights” for construction and for maintenance include any appropriate working areas required to reasonably and safely undertake that construction or maintenance, and any necessary rights of access;
- “functions” includes powers and duties;
- “gas supply” means the transmission, transportation, supply or storage of gas;
- “gas undertaker” means Cadent Gas Limited or Southern Gas Networks plc as the case may be and includes any successor in title or any successor as a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986185;
- “ground mitigation scheme” means a scheme approved by the gas undertaker (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event;
- “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, requires the undertaker to submit for the gas undertaker’s approval a ground mitigation scheme;
- “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
- “maintain” and “maintenance” have effect as if the gas undertaker’s existing apparatus was authorised development and as if the term maintain includes protect and use;
- “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed;
- “rights” includes restrictive covenants and, in relation to decommissioned apparatus, the surrender of rights, release of liabilities and transfer of decommissioned apparatus;
- “Southern Gas Networks” means Southern Gas Networks Plc (company number 05167021, whose registered office is at St Lawrence House, Station Approach, Horley, Surrey, RH6 9HJ);
- “specified works” means any of the authorised development or activities (including maintenance) undertaken in association with the authorised development which—
- will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under sub-paragraph 54(2) or otherwise; or
- may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under sub-paragraph 54(2) (removal of apparatus) or otherwise; and
- “undertaking” means the rights, duties and obligations of the gas undertaker as a public gas transporter within the meaning of section 7186 of the Gas Act 1986.
I17850 On Street apparatus¶
I17951 Apparatus of the gas undertaker in stopped up streets¶
I18052 Protective works to buildings¶
The undertaker must exercise the powers conferred by article 20 (protective work to land and buildings) so as not to obstruct or render less convenient the access to any apparatus without the written consent of the gas undertaker (such consent not to be unreasonably withheld or delayed).I18153 Acquisition of land¶
I18254 Removal of apparatus¶
I18355 Facilities and rights for alternative apparatus¶
I18456 Retained apparatus: protection of the gas undertaker¶
I18557 Expenses¶
I18658 Indemnity¶
I18759 Enactments and agreements¶
Except where this Part of this Schedule provides otherwise, nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and the gas undertaker in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.I18860 Co-operation¶
I18961 Access¶
If in consequence of any agreement reached in accordance with paragraph 53(1) (acquisition of land) or the powers conferred by this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative rights and means of access to such apparatus as will enable the gas undertaker to maintain or use the apparatus no less effectively than was possible before such obstruction.I19062 Arbitration¶
Save for differences or disputes arising under paragraph 54(2) and (4) (removal of apparatus) any difference or dispute arising between the undertaker and the gas undertaker under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and the gas undertaker, be determined by arbitration in accordance with article 64 (arbitration).I19163 Notices¶
Notwithstanding article 63 (service of notices) any plans submitted to the gas undertaker by the undertaker pursuant to paragraph 56(1) (retained apparatus: protection of the gas undertaker) must be sent via email and post to such email and postal addresses as the gas undertaker may from time to time appoint for that purpose and notify to the undertaker in writing.PART 6 FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC AS GAS UNDERTAKER¶
I19264 Application¶
Interpretation¶
- “alternative apparatus” means appropriate alternative apparatus to the reasonable satisfaction of National Grid to enable National Grid to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means any gas mains, pipes, pressure governors, ventilators, cathodic protections, cables or other apparatus belonging to or maintained by National Grid for the purposes of gas supply together with any replacement apparatus and such other apparatus constructed pursuant to the Order that becomes operational apparatus of National Grid for the purposes of transmission, distribution or supply and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;
- “commence” and “commencement” in paragraph 72 (retained apparatus: protection of the gas undertaker) of this Part of this Schedule includes any below ground surveys, monitoring, ground work operations or the receipt and erection of construction plant and equipment;
- “deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary or replace existing easements, agreements, and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule;
- “functions” includes powers and duties;
- “ground mitigation scheme” means a scheme approved by National Grid (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event;
- “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, requires the undertaker to submit for National Grid’s approval a ground mitigation scheme;
- “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
- “maintain” and “maintenance” includes the ability and right to do any of the following in relation to any apparatus or alternative apparatus of National Grid including construct, use, repair, alter, inspect, renew or remove the apparatus;
- “National Grid ” means National Gas Transmission Plc (company number 02006000, whose registered office is at National Grid House, Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA) or any successor as a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986;
- “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed; and
- “specified works” means any of the authorised development or activities undertaken in association with the authorised development (including maintenance) which—
- will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under paragraph 70(2) or otherwise; or
- may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under paragraph 70(2) (removal of apparatus) or otherwise.
I19567 Apparatus of National Grid in stopped up streets¶
I19668 Protective works to buildings¶
The undertaker must exercise the powers conferred by article 20 (protective work to land and buildings) so as not to obstruct or render less convenient the access to any apparatus without the written consent of National Grid (such consent not to be unreasonably withheld).I19769 Acquisition of land¶
I19870 Removal of apparatus¶
I19971 Facilities and rights for alternative apparatus¶
I20072 Retained apparatus: protection of gas undertaker¶
I20173 Expenses¶
I20274 Indemnity¶
I20375 Enactments and agreements¶
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and National Grid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.I20476 Co-operation¶
I20577 Access¶
If in consequence of the agreement reached in accordance with paragraph 69(1) (acquisition of land) or the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable National Grid to maintain or use the apparatus no less effectively than was possible before such obstruction.I20678 Arbitration¶
Save for differences or disputes arising under paragraphs 70(2) and (4) (removal of apparatus), and 71(1) (retained apparatus: protection of the gas undertaker) any difference or dispute arising between the undertaker and National Grid under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and National Grid, be determined by arbitration in accordance with article 64 (arbitration).I20779 Notices¶
Notwithstanding article 63 (service of notices), any plans submitted to National Grid by the undertaker pursuant to paragraph 72 (retained apparatus: protection of the gas undertaker) must be sent to National Grid LSBUD at https://lsbud.co.uk/ or assetprotection@nationalgrid.com or such other address as National Grid may from time to time appoint instead for that purpose and notify to the undertaker in writing.PART 7 FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION PLC AS ELECTRICITY UNDERTAKER¶
I20880 Application¶
Interpretation¶
- “alternative apparatus” means appropriate alternative apparatus to the reasonable satisfaction of National Grid to enable National Grid to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means any electric lines or electrical plant as defined in section 64 of the Electricity Act 1989, belonging to or maintained by National Grid together with any replacement apparatus and such other apparatus constructed pursuant to the Order that becomes operational apparatus of National Grid for the purposes of transmission, distribution or supply and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;
- “commence” and “commencement” in paragraph 88 (retained apparatus: protection of the electricity undertaker) of this Part of this Schedule includes any below ground surveys, monitoring, ground work operations or the receipt and erection of construction plant and equipment;
- “deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary or replace existing easements, agreements, and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule;
- “functions” includes powers and duties;
- “ground mitigation scheme” means a scheme approved by National Grid (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event;
- “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, requires the undertaker to submit for National Grid’s approval a ground mitigation scheme;
- “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
- “maintain” and “maintenance” includes the ability and right to do any of the following in relation to any apparatus or alternative apparatus of National Grid including construct, use, repair, alter, inspect, renew or remove the apparatus;
- “National Grid ” means National Grid Electricity Transmission Plc (company number 02366977, whose registered office is at 1-3 Strand, London, WC2N 5EH) or any successor as a licence holder within the meaning of Part 1 of the Electricity Act 1989;
- “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed; and
- “specified works” means any of the authorised development or activities undertaken in association with the authorised development (including maintenance) which—
- will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under paragraph 86(2) (removal of apparatus) or otherwise; or
- may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under paragraph 86(2) or otherwise.
I21183 Apparatus of National Grid in stopped up streets¶
I21284 Protective works to buildings¶
The undertaker must exercise the powers conferred by article 20 (protective work to land and buildings) so as not to obstruct or render less convenient the access to any apparatus without the written consent of National Grid (such consent not to be unreasonably withheld).I21385 Acquisition of land¶
I21486 Removal of apparatus¶
I21587 Facilities and rights for alternative apparatus¶
I21688 Retained apparatus: protection of electricity undertaker¶
I21789 Expenses¶
I21890 Indemnity¶
I21991 Enactments and agreements¶
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and National Grid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.I22092 Co-operation¶
I22193 Access¶
If in consequence of the agreement reached in accordance with paragraph 85(1) (acquisition of land) or the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable National Grid to maintain or use the apparatus no less effectively than was possible before such obstruction.I22294 Arbitration¶
Save for differences or disputes arising under paragraphs 86(2)and (4) (removal of apparatus), and 87(1) (facilities and rights for alternative apparatus) any difference or dispute arising between the undertaker and National Grid under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and National Grid, be determined by arbitration in accordance with article 64 (arbitration).I22395 Notices¶
Notwithstanding article 63 (service of notices), any plans submitted to National Grid by the undertaker pursuant to paragraph 88 (retained apparatus: protection of electricity undertaker) must be sent to National Grid LSBUD at https://lsbud.co.uk/ or assetprotection@nationalgrid.com or such other address as National Grid may from time to time appoint instead for that purpose and notify to the undertaker in writing.PART 8 FOR THE PROTECTION OF THE PORT OF LONDON AUTHORITY¶
I22496 Application¶
The provisions of this Part of this Schedule have effect unless otherwise agreed in writing between the undertaker and the PLA, for the protection of the PLA in relation to the construction of the authorised development and, within any maintenance period defined in article 36 (temporary use of land for maintaining the authorised development), any maintenance of any part of the authorised development.I22597 Interpretation¶
In this Schedule—- “begin” means beginning to carry out any material operation (as defined in section 56(4) (time when development begun) of the 1990 Act) forming part of the authorised development including preliminary works (as defined in Schedule 2 of this Order) including any ground investigations in the river Thames;
- “construction” includes execution, placing, altering, replacing, relaying, removal, renewal and works of maintenance within a maintenance period defined in article 36 (temporary use of land for maintaining the authorised development) and, in its application to a specified work which includes or comprises any operation, means the carrying out of that operation, and “construct” and “constructed” are to be construed accordingly;
- “Harbour Master” has the same meaning as “harbourmaster” in section 2(1) of the 1968 Act;
- “plans” includes navigational risk assessments, plans, sections, elevations, drawings, specifications, programmes, construction methods and descriptions including, where applicable, such relevant hydraulic information about the river Thames as may be reasonably requested by the PLA;
- “preliminary navigational risk assessment” means the document of that description listed in Schedule 16 (documents to be certified) and certified by the Secretary of State as the preliminary navigational risk assessment and, in connection with any ground investigations in the river Thames, means the “Lower Thames Crossing Ground Investigations Navigational Risk Assessment” (which forms Appendix F of the preliminary navigational risk assessment);
- “specified function” means any function of the undertaker under this Order (except any function under article 25 (compulsory acquisition of land), article 28 (compulsory acquisition of rights and imposition of restrictive covenants), article 33 (acquisition of subsoil or airspace only)) the exercise of which may affect the river Thames or any function of the PLA;
- “specified work” means any part of the authorised development (which for this purpose includes the removal of any part of the authorised development), which—
- is, may be, or takes place in, on, under or over the surface of land below the level of mean high water forming part of the river Thames; or
- may affect the river Thames or any function of the PLA,
- “temporary outfall” means the temporary outfall in the river Thames referenced in paragraph 5(2)(a) of Schedule 15 (deemed marine licence) to this Order; and
- “tunnelling works” means so much of Work No. 4A as is carried out wholly under the bed of the River Thames.
I22698 Approval of detailed design (excluding the tunnelling works)¶
I22799 Design of, and coordination of, tunnelling works to ensure existing and future use of river Thames¶
I228100 Construction of tunnelling works¶
I229101 As built drawings¶
As soon as reasonably practicable following the completion of the construction of the authorised development, the undertaker must provide to the PLA as built drawings of any specified works in a form and scale to be agreed between the undertaker and the PLA to show the position of those works in relation to the river Thames.I230102 Discharges etc.¶
I231103 Removal of temporary works¶
- “residual structure” means any part of a temporary tidal work that the PLA agrees cannot reasonably be removed by the undertaker on completion of the construction of the permanent specified works; and
- “tidal work” means any specified work any part of which is, or may be, or, in, under or over the surface of land below the level of mean high water forming part of the river Thames.
I232104 Protective action¶
I233105 Facilities for navigation¶
I234106 Use of land above the riverbed of the river Thames¶
The undertaker’s powers of temporary possession and compulsory acquisition of rights and imposition of restrictive covenants under this Order above the riverbed of the river Thames in connection with the temporary outfall, permanent outfall, the new water inlet with self-regulating valve and ground investigation works, is limited to what is reasonably necessary for the undertaker safely to construct the authorised development.I235107 Survey of the river Thames riverbed¶
I236108 Statutory functions¶
Subject to article 53 (disapplication of legislative provisions, etc.) the exercise in, under or over the river Thames by the undertaker of any of its functions under this Order is subject to—I237109 Indemnity¶
I238110 Disposals, etc.¶
The undertaker must within 7 days after the completion of any sale, agreement or other transaction under article 8 (consent to transfer benefit of Order) in relation to which any powers, rights and obligations of the undertaker are transferred to another party, notify the PLA in writing, and the notice must include particulars of the other party to the transaction under article 8, the general nature of the transaction and details of the extent, nature and scope of the works or functions sold, transferred or otherwise dealt with.I239111 Navigational lights, buoys, etc.¶
I240112 Directions as to lights¶
The undertaker must comply with any reasonable directions issued from time to time by the Harbour Master with regard to the lighting of—I241113 Removal, etc. of the PLA’s moorings and buoys¶
I242114 Abandoned or decayed works¶
I243115 Apparatus in the tunnel area¶
I244116 Disputes¶
Any dispute arising between the undertaker and the PLA under this Schedule is to be determined by arbitration as provided in article 64 (arbitration).PART 9 FOR THE PROTECTION OF THE ENVIRONMENT AGENCY¶
I245117 Application and Interpretation¶
- “Agency” means the Environment Agency;
- “construction” includes execution, placing, altering, replacing, relaying and removal and excavation and “construct” and “constructed” is construed accordingly;
- “drainage work” means any main river and includes any land which provides or is expected to provide flood storage capacity for any main river and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;
- “fishery” means any waters containing fish and fish in, or migrating to or from, such waters and the spawn, spawning ground, habitat or food of such fish;
- “main river” has the same meaning given in section 113 (interpretation of Part IV)187 of the Water Resources Act 1991;
- “plans” includes sections, drawings, specifications, calculations and method statements;
- “remote defence” means any berm, wall or embankment that is constructed for the purposes of preventing or alleviating flooding from, or in connection with, any main river;
- “sea defence” means any bank, wall, embankment (and any berm, counterwall or cross-wall connected to any such bank, wall or embankment), barrier, tidal sluice and other defence, whether natural or artificial, against the inundation of land by sea water or tidal water, including natural or artificial high ground which forms part of or makes a contribution to the efficiency of the defences of the Agency’s area against flooding, but excludes any sea defence works which are for the time being maintained by a coast protection authority under the provisions of the Coast Protection Act 1949188 or by any local authority or any navigation, harbour or conservancy authority; and
- “specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within—
- 16 metres of the base of a sea defence which is likely to—
- endanger the stability of, cause damage or reduce the effectiveness of that sea defence; or
- interfere with the Agency’s access to or along that sea defence;
- 8 metres of the base of a remote defence which is likely to—
- endanger the stability of, cause damage or reduce the effectiveness of that sea defence; or
- interfere with the Agency’s access to or along that sea defence;
- 8 metres of a drainage work or is otherwise likely to—
- affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work;
- affect the flow, purity or quality of water in any watercourse or other surface waters;
- cause obstruction to the free passage of fish or damage to any fishery;
- affect the conservation, distribution or use of water resources; or
- affect the conservation value of the main river and habitats in its immediate vicinity;
- an activity that includes dredging, raising or taking of any sand, silt, ballast, clay, gravel or other materials from or off the bed or banks of a drainage work (or causing such materials to be dredged, raised or taken), including hydrodynamic dredging or desilting; and
- any quarrying or excavation within 16 metres of a drainage work which is likely to cause damage to or endanger the stability of the banks or structure of that drainage work.
I246118 Submission and approval of plans¶
I247119 Construction of protective works¶
Without limiting paragraph 118 (submission and approval of plans), the requirements which the Agency may have under that paragraph include conditions requiring the undertaker, at its own expense, to construct such protective works, whether temporary or permanent, before or during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—I248120 Timing of works and service of notices¶
I249121 Works not in accordance with this Part¶
I250122 Maintenance of works¶
I251123 Remediating impaired drainage work¶
Subject to paragraph 126 (indemnity), if by reason of the construction of any specified work or of the failure of any such work, the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by the undertaker to the reasonable satisfaction of the Agency and if the undertaker fails to do so, the Agency may make good the impairment or damage and recover any expenditure incurred by the Agency in so doing from the undertaker.I252124 Agency access¶
If by reason of construction of the specified work the Agency’s access to flood defences or equipment maintained for flood defence purposes is materially obstructed, the undertaker must provide such alternative means of access that will allow the Agency to maintain the flood defence or use the equipment no less effectively than was possible before the obstruction as soon as reasonably practicable of the undertaker becoming aware of such obstruction.I253125 Free passage of fish¶
Indemnity¶
- “costs” includes—
- expenses and charges;
- staff costs and overheads; and
- legal costs; and
- “losses” includes physical damage.
- “claims” and “demands” include as applicable—
- costs (within the meaning of sub-paragraph (2)) incurred in connection with any claim or demand; and
- any interest element of sums claimed or demanded;
- “liabilities” includes—
- contractual liabilities;
- tortious liabilities (including liabilities for negligence or nuisance); and
- liabilities to pay statutory penalties imposed on the basis of strict liability (but does not include liabilities to pay other statutory penalties).
I256128 Disputes¶
Any dispute arising between the undertaker and the Agency under this Part of this Schedule must, if the parties agree, be determined by arbitration under article 64 (arbitration).PART 10 FOR THE PROTECTION OF PORT OF TILBURY LONDON LIMITED¶
I257129 Application¶
The provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and PoTLL, for the protection of PoTLL in relation to the construction of the authorised development F37....I258130 Interpretation¶
- “accumulation” means any accumulation of silt or other material (including any materials used to construct the authorised development) which constitutes an impediment to navigation within and to and from the Port;
- “the affected roads” means the A1089 St Andrews Road, Ferry Road, Fort Road and the unnamed link road between Fort Road and the A1089 St Andrews Road;
- “plans” includes plans, sections, elevations, drawings, specifications, programmes, proposals, construction methods and descriptions;
- “the Port” means—
- any land (including land covered by water) for the time being owned or used by PoTLL for the purposes of its statutory undertaking, together with any quays, jetties, docks, river walls and other land or works held for or in connection with that undertaking; and
- the land that was designated as a Thames Freeport Tax Site under the Designation of Freeport Tax Sites (Thames Freeport) Regulations 2021189 but only insofar as that land is included in the area shown edged and hatched in red on the map marked “Location: Port of Tilbury; Subject: Thames Freeport – Tax Site” referenced in regulation 2(1)(c) of those Regulations;
- “PoTLL” means Port of Tilbury London Limited, as statutory harbour authority for and operator of the Port;
- “preliminary works” and “preliminary works EMP” have the same meaning as in paragraph 1 (interpretation) of Part 1 (requirements) of Schedule 2 to this Order;
- “Required Easement Width” means any area of land comprising or forming part of an exclusion or protection zone pursuant to an easement for the benefit of a statutory undertaker and proposed to be—
- granted or acquired by the undertaker;
- acquired by a person or body under article 8(1), whether listed under article 8(5) or otherwise; or
- granted or acquired by a statutory undertaker pursuant to a consent granted by the undertaker under article 28(3);
- “specified easement” means any easement, restrictive covenant or any other form of property right, including a Required Easement Width, for the benefit of another statutory undertaker in respect of a work authorised by this Order, burdening land within the Port and proposed to be—
- granted or acquired by the undertaker;
- acquired by a person or body under article 8(1), whether listed under article 8(5) or otherwise; or
- granted or acquired by a statutory undertaker pursuant to a consent granted by the undertaker under article 28(3);
- “specified function” means any function of the undertaker under—
- article 3 (development consent, etc. granted by the Order);
- article 4 (maintenance of the authorised development);
- article 5 (maintenance of drainage works);
- article 10 (construction and maintenance of new, altered or diverted streets and other structures);
- article 11 (access to works);
- article 12 (temporary closure, alteration, diversion and restriction of use of streets);
- article 13 (use of private roads);
- article 14 (permanent stopping up of streets and private means of access);
- article 17 (traffic regulation – local roads);
- article 18 (powers in relation to relevant navigations or watercourses);
- article 19 (discharge of water);
- article 20 (protective work to land and buildings);
- article 21 (authority to survey and investigate the land); and
- article 23 (felling or lopping of trees and removal of hedgerows),
- “specified work” means so much of the works and other matters listed at paragraphs (a) to (d) as are situated on, over, across or under the Port—
- the following Work Nos. together with any preliminary works, associated development or ancillary works proposed to be carried out for the purposes of or in connection with their construction—
- Work No. CA5;
- Work No. CA5A;
- Work No. MUT4;
- Work No. MUT5;
- Work No. MUT7;
- Work No. MUT8;
- Work No. MUT9;
- Work No. MU27;
- Work No. MU28;
- Work No. MU29;
- Work No. OH3; and
- Work No. OH4;
- any activities associated with the undertaker complying with article 37(5) or any provision in Schedule 14 requiring the removal of apparatus;
- any part of the authorised development that is expected to require the inclusion of any land within the Port within the extent of a Required Easement Width; F38...
- F39...
- “Tilbury2” means that part of the Port constructed pursuant to the Port of Tilbury (Expansion) Order 2019192; and
- “vehicular access” includes but is not limited to access by road, rail, vessel and conveyor and any reference to “access” is to be construed as including vehicular access unless otherwise stated.
I259131 Approval of plans¶
I260132 Approval of specified easements¶
- “the area 1 land” means the land comprised in plots 16-65, 16- 66, 17-08, 17-09, 21-32 and 21-34 as shown on the land plans and listed in the book of reference; and
- “retained provisions” means sub-paragraphs (6) to (8) of this paragraph and paragraphs 149 (indemnity) and 150 of this Part of this Schedule.
F42133 Restoration of Port land¶
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .I261134 Consultation¶
I262135 Notification of works to utilities and services affecting the Port¶
F45136 Construction traffic management protocol within the Port¶
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .I263137 Streets¶
I264138 Minimising disruption to affected roads and streets within the Port¶
In exercising the powers conferred by this Order in relation to the affected roads or any street within the Port, the undertaker must have regard to the potential disruption, delay or congestion of traffic which may be caused to the affected roads or streets within the Port and seek to minimise such disruption, delay or congestion so far as is reasonably practicable.I265139 Obstruction within the Port¶
F46140 Land powers¶
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .I266141 As-built plans¶
As soon as reasonably practicable following the completion of the construction of any specified works within the Port or any protective works, the undertaker must provide to PoTLL as-built plans of those works in a form and scale to be agreed between the undertaker and PoTLL.I267142 Accumulation and erosion¶
I268143 Permitting¶
I269144 Port closure in emergency¶
F47145 Interaction with the Tilbury2 Order¶
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .I270146 Safeguarding of access to the Port by rail¶
The undertaker must not exercise any power under the Order in such a manner as to cause any vehicular access for the purposes of the authorised development to have priority over railway traffic at the level crossing in the Port.I271147 Disposals, etc.¶
The undertaker must within 7 days after the completion of any sale, agreement or other transaction under article 8 (consent to transfer benefit of Order) in relation to which any powers, rights and obligations of the undertaker are transferred to another party insofar as these would affect the Port or the operation of this Part of this Schedule, notify PoTLL in writing, and the notice must include particulars of the other party to the transaction under article 8, the general nature of the transaction and details of the extent, nature and scope of the works or functions sold, transferred or otherwise dealt with.I272148 Costs¶
The undertaker must pay to PoTLL its proper and reasonable legal costs, professional fees and disbursements incurred in connection with—I273149 Indemnity¶
I274150 Disputes¶
PART 11 FOR THE PROTECTION OF LOCAL HIGHWAY AUTHORITIES¶
I275151 Application¶
The provisions of this Part of this Schedule have effect in relation to the works unless otherwise agreed in writing between the undertaker and the relevant local highway authority.I276152 Definitions¶
In this Part of this Schedule—- “detailed design” means drawings and other information comprising the detailed design for local roads comprised in the authorised development for the purposes of paragraph 3 of Part 1 of Schedule 2 to this Order;
- “detailed information” means drawings, specifications and other information relating to the local highway, as relevant to the works in question, to comprise the following (insofar as both parties agree (acting reasonably) are relevant and not already provided for in any document that the undertaker is required to produce under Schedule 2 to this Order) which must be in accordance with the detailed design—
- boundary, environmental and mitigation fencing;
- road restraint systems (vehicle and pedestrian);
- drainage and ducting;
- earthworks;
- road pavements;
- kerbs, footways and paved areas;
- long and cross sectional drawings;
- traffic signs and road markings;
- electrical work for road lighting and traffic signs;
- highway structures;
- landscaping, planting and any boundary features which will form part of the local highway;
- new utilities and utility diversions insofar as in the existing or proposed local highway;
- a schedule of timings for the works, including dates and durations for any closures of any part of the local highway;
- traffic management proposals including any diversionary routes;
- a schedule of the existing local highway condition prior to commencement of construction related activities;
- a specification of the condition in which it is proposed that the local highway will be returned once the relevant works have been completed;
- any temporary works structures which are to be erected or retained under the Order or otherwise;
- “DMRB” means the Design Manual for Roads and Bridges published by the undertaker. or any replacement or modification of that standard for the time being in force;
- “final certificate” means the final certificate issued by the relevant local highway authority under paragraph 161 (final certificate) of this Part of this Schedule;
- “local highway” means any public highway including any public right of way which is maintainable, or is intended at the completion of the works in relation thereto to be maintainable by a relevant local highway authority;
- “maintenance period” means the period of 12 months beginning with the date of the provisional certificate being served under paragraph 159 (provisional certificate) of this Part of this Schedule unless otherwise agreed in writing between the parties;
- “the parties” means the undertaker and the relevant local highway authority;
- “provisional certificate” means the certificate served under paragraph 159 of this Part; and
- “works” means any works authorised by the Order undertaken on, to or under any part of the local highway.
Design input and commencement¶
I279155 Survey reinstatement¶
The undertaker must reinstate to the reasonable satisfaction of the relevant local highway authority any part of the local highway which has been temporarily used for survey or investigation by the undertaker pursuant to article 20 (protective work to land and buildings), article 35 (temporary use of land for carrying out the authorised development) of this Order or any other power in this Order, to the condition it was in on the date on which the survey or investigation began or such other condition as may be agreed in writing by the relevant local highway authority.I280156 Inspections and testing of materials¶
I281157 Road Safety Audits¶
I282158 Defects in local highways constructed by the undertaker¶
I283159 Provisional Certificate¶
I284160 Maintenance¶
I285161 Final Certificate¶
I286162 Emergency Work¶
Nothing in this Part of this Schedule prevents the relevant local highway authority from carrying out any work or taking such action as deemed appropriate forthwith without prior notice to the undertaker in the event of an emergency or danger to the public.I287163 Land interests¶
Following the issuing of the final certificate under paragraph 161 (final certificate) in respect of any part of the local highway, the undertaker must, if requested by the relevant local highway authority, in respect of a local highway which is to be maintainable by the relevant local highway authority following, and as a result of, the completion of those works either—I288164 Disputes¶
SCHEDULE 15 ¶
DEEMED MARINE LICENCE
Article 60
PART 1 INTRODUCTORY¶
I2891 Interpretation¶
- “the 2009 Act” means the Marine and Coastal Access Act 2009195;
- “authorised development” has the meaning given in paragraph 5;
- “buried pipeline” means the pipeline to be built from the northern tunnel entrance compound with an approximate length below the mean high water springs of 400m and a maximum diameter of 1m;
- “Coalhouse Point” means the land at plots 19-09 and 19-37 in the book of reference;
- “commence” means beginning to carry out any part of a licensable marine activity, and “commenced” and “commencement” is to be construed accordingly;
- “condition” means those conditions in Part 4 of this Schedule;
- “intertidal zone” means the area between the area between the normal tidal limit and 1 nautical mile;
- “licensed activities” means any activity described in Part 2 of this licence;
- “licensable marine activity” means any activity licensable under section 66 of the 2009 Act including those set out in paragraph 5;
- “the marine area” has the meaning given to ‘UK marine area’ in section 42 of the 2009 Act;
- “mean high water springs” means the average of high water heights occurring at the time of spring tides;
- “MMO” means the Marine Management Organisation;
- “the MMO local office” means the MMO office whose contact details are given at paragraph 2(1)(b) or such other MMO office identified by replacement contact details provided by the MMO under paragraph 2(1)(b);
- “MMO Marine Licencing Team” means the MMO team whose contact details are given at paragraph 2(1)(a) or such other team of persons identified by replacement contact details provided by the MMO at paragraph 2(1)(a);
- “Marine Noise Registry” means the register maintained by the Joint Nature Conservation Committee that records the spatial and temporal distribution of impulsive noise generating activities in the marine area;
- “MMO Pollution Response Team” means the MMO team whose contact details are given at paragraph 2(1)(c) or such other team of persons identified by replacement contact details provided by the MMO at paragraph 2(1)(c);
- “the northern tunnel entrance compound” means the area as set out in figure 2.5 of the environmental statement;
- “the Order” means the A122 (Lower Thames Crossing) Development Consent Order 2025;
- “Ramsar Site” has the meaning given in the Wildlife and Countryside Act 1981196 (as amended);
- “SPA” means special protection area as defined in the Conservation of Habitats and Species Regulations 2017197 (as amended);
- “SSSI” means site of special scientific interest as defined in the Wildlife and Countryside Act 1981198;
- “undertaker” means National Highways Limited (Company No. 09346363) whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ or any transferee under article 8 (consent to transfer benefit of Order) of the Order and includes and any agent, contractor or sub-contractor acting on its behalf; and
- “water inlet” means the water inlet with self-regulating valve to be built at Coalhouse Point for habitat creation and to secure the water supply to the ecology mitigation area (Work No. 5X).
I2902 Contact Details¶
PART 2 LICENSABLE MARINE ACTIVITIES¶
| Structure | Point | ETRS89 (decimal degrees) | |
|---|---|---|---|
| Latitude | Longitude | ||
| Outfall | Centre | 51.454111 | 0.413873 |
| Discharge pipeline working area | North west | 51.455923 | 0.412713 |
| North east | 51.456074 | 0.41339 | |
| South west | 51.452263 | 0.415053 | |
| South east | 51.452175 | 0.414348 | |
| Structure | Point | ETRS89 (decimal degrees) | |
|---|---|---|---|
| Latitude | Longitude | ||
| Outfall | North west | 51.45592 | 0.414477 |
| North east | 51.45601 | 0.414733 | |
| South west | 51.45585 | 0.414527 | |
| South east | 51.45593 | 0.414782 | |
| Structure | Point | ETRS89 (decimal degrees) | |
|---|---|---|---|
| Latitude | Longitude | ||
| Water inlet | North west | 51.45869 | 0.426321 |
| North east | 51.458851 | 0.426999 | |
| South west | 51.458387 | 0.426455 | |
| South east | 51.458553 | 0.427135 | |
PART 3 ENFORCEMENT¶
PART 4 CONDITIONS¶
General conditions¶
I2979 Distribution of copies¶
I29810 Construction method statement¶
I29911 Marine pollution contingency plan¶
I30012 Concrete and cement¶
Waste concrete, slurry or wash water from concrete or cement activities must not be discharged, intentionally or unintentionally, into the marine environment. Concrete and cement mixing and washing areas must be contained and sited at least 10 metres from any water body or surface water drain.I30113 Coatings and treatment¶
The undertaker must ensure that only coatings and treatments can be used that are suitable for use in the marine environment.I30214 Spills, etc.¶
I30315 Piling techniques¶
I30416 Noise registry¶
Where impact piling is required as part of a method statement approved by the MMO under condition 10, the undertaker must—I30517 Removal of temporary structures, etc.¶
The undertaker must remove all equipment, temporary structures, waste and debris associated with the licensable marine activities within 30 business days of the completion of those activities, unless otherwise agreed in writing by the MMO.I30618 Notice of completion of licensable marine activity¶
The undertaker must inform the MMO in writing of the completion of the last marine activity no more than 10 business days following the completion of the said activity.I30719 Licensable marine activity at Coalhouse Point¶
PART 5 PROCEDURE FOR THE DISCHARGE OF CONDITIONS¶
I30820 Meaning of “return”¶
In this Part, “return” means a submission by the undertaker for approval by the MMO of any method statement or plan required under Part 4 of this licence.I30921 Further information regarding return¶
I31022 Determination of return¶
I31123 Notice of determination¶
I31224 Arbitration¶
Regulations made under section 73 of the 2009 Act apply to any difference under any provision of this licence and article 64 (arbitration) does not apply.PART 6 CHANGES TO THE DEEMED MARINE LICENCE¶
SCHEDULE 16 ¶
DOCUMENTS TO BE CERTIFIED
Article 62
I334PART 1 PLANS¶
|
(1)
Document
|
(2)
Document Reference
|
(3)
Revision
|
|---|---|---|
| Location Plan – Regulation 5(2)(o) | TR010032/APP/2.1 | 5.0 |
| Land Plans (Volume A) – Regulation 5(2)(i) | TR010032/APP/2.2 | 8.0 |
| Land Plans (Volume B) – Regulation 5(2)(i) | TR010032/APP/2.2 | 8.0 |
| Land Plans (Volume C) – Regulation 5(2)(i) | TR010032/APP/2.2 | 8.0 |
| Crown Land Plans (Volume A) – Regulation 5(2)(n) | TR010032/APP/2.3 | 9.0 |
| Crown Land Plans (Volume B) – Regulation 5(2)(n) | TR010032/APP/2.3 | 9.0 |
| Crown Land Plans (Volume C) – Regulation 5(2)(n) | TR010032/APP/2.3 | 9.0 |
| Special Category Land Plans (Volume A) – Regulation 5(2)(i)(iv) | TR010032/APP/2.4 | 7.0 |
| Special Category Land Plans (Volume B) – Regulation 5(2)(i)(iv) | TR010032/APP/2.4 | 7.0 |
| Special Category Land Plans (Volume C) – Regulation 5(2)(i)(iv) | TR010032/APP/2.4 | 7.0 |
| General Arrangement (Volume A) – Regulation 5(2)(o) | TR010032/APP/2.5 | 5.0 |
| General Arrangement (Volume B) – Regulation 5(2)(o) | TR010032/APP/2.5 | 6.0 |
| General Arrangement (Volume C) – Regulation 5(2)(o) | TR010032/APP/2.5 | 6.0 |
| Works Plans (Volume A) Composite & Utilities – Regulation 5(2)(j) | TR010032/APP/2.6 | 5.0 |
| Works Plans (Volume B) Composite – Regulation 5(2)(j) | TR010032/APP/2.6 | 6.0 |
| Works Plans (Volume B) Utilities – Regulation 5(2)(j) | TR010032/APP/2.6 | 5.0 |
| Works Plans (Volume C) Composite & Utilities – Regulation 5(2)(j) | TR010032/APP/2.6 | 7.0 |
| Rights of Way and Access Plans (Volume A) – Regulation 5(2)(k) | TR010032/APP/2.7 | 5.0 |
| Rights of Way and Access Plans (Volume B) – Regulation 5(2)(k) | TR010032/APP/2.7 | 5.0 |
| Rights of Way and Access Plans (Volume C) – Regulation 5(2)(k) | TR010032/APP/2.7 | 7.0 |
| Streets Subject to Temporary Restrictions of Use (Volume A) – Regulation 5(2)(k) and (o) | TR010032/APP/2.8 | 5.0 |
| Streets Subject to Temporary Restrictions of Use (Volume B) – Regulation 5(2)(k) and (o) | TR010032/APP/2.8 | 5.0 |
| Streets Subject to Temporary Restrictions of Use (Volume C) – Regulation 5(2)(k) and (o) | TR010032/APP/2.8 | 6.0 |
| Engineering Drawings and Sections (Volumes A and B) – Regulation 5(2)(o) and 6(2) | TR010032/APP/2.9 | 6.0 |
| Engineering Drawings and Sections (Volume E) – Regulation 5(2)(o) and 6(2) | TR010032/APP/2.9 | 5.0 |
| Engineering Drawings and Sections (Volumes C, D, G and H) – Regulation 5(2)(o) and 6(2) | TR010032/APP/2.9 | 2.0 |
| Engineering Drawings and Sections (Volume F) – Regulation 5(2)(o) and 6(2) | TR010032/APP/2.9 | 3.0 |
| Traffic Regulation Measures Plans (Volumes A and C) – Regulation 5(2)(o) | TR010032/APP/2.10 | 5.0 |
| Traffic Regulation Measures Plans (Volume B) – Regulation 5(2)(o) | TR010032/APP/2.10 | 4.0 |
| Classification of Roads Plans – Regulation 5(2)(o) | TR010032/APP/2.11 | 6.0 |
| Tunnel Area Plan – Regulation 5(2)(o) | TR010032/APP/2.12 | 2.0 |
| Structures Plans (Volume A) – Regulation 5(2)(o) | TR010032/APP/2.13 | 5.0 |
| Structures Plans (Volume B) – Regulation 5(2)(o) | TR010032/APP/2.13 | 3.0 |
| River Restrictions Plan – Regulation 5(2)(o) | TR010032/APP/2.14 | 3.0 |
| Tunnel Limits of Deviation Plans – Regulation 5(2)(o) and 6(2) | TR010032/APP/2.15 | 4.0 |
| Drainage Plans (Volume A) – Regulation 5(2)(o) | TR010032/APP/2.16 | 5.0 |
| Drainage Plans (Volume B) – Regulation 5(2)(o) | TR010032/APP/2.16 | 5.0 |
| Drainage Plans (Volume C) – Regulation 5(2)(o) | TR010032/APP/2.16 | 5.0 |
| Temporary Works Plans (Volume A) – Regulation 5(2)(o) | TR010032/APP/2.17 | 5.0 |
| Temporary Works Plans (Volume B) – Regulation 5(2)(o) | TR010032/APP/2.17 | 5.0 |
| Temporary Works Plans (Volume C) – Regulation 5(2)(o) | TR010032/APP/2.17 | 7.0 |
| Hedgerows and Trees Preservation Order Plans (Volumes A and C) – Regulation 5(2)(o) | TR010032/APP/2.18 | 5.0 |
| Hedgerows and Trees Preservation Order Plans (Volume B) – Regulation 5(2)(o) | TR010032/APP/2.18 | 4.0 |
I335PART 2 THE ENVIRONMENTAL STATEMENT AND RELATED DOCUMENTS¶
|
(1)
Document
|
(2)
Document Reference
|
(3)
Revision
|
|---|---|---|
| Environmental Statement – Main Report (excluding Chapters 6, 7, 8 and 11) – Regulation 5(2)(a) | TR010032/APP/6.1 | 1.0 |
| Environmental Statement – Main Report (Chapters 7, 8 and 11) – Regulation 5(2)(a) | TR010032/APP/6.1 | 2.0 |
| Environmental Statement – Main Report (Chapter 6) – Regulation 5(2)(a) | TR010032/APP/6.1 | 3.0 |
| Environmental Statement – Figures (excluding Figures 2.1, 2.2, 2.3, 2.4, 2.5, 5.5, 6.1, 6.6, 7.4, 7.8, 7.16, 7.19, 7.20, 7.23, 7.24, 8.1, 8.32, 8.33, 10.2, 10.4, 11.1, 12.1, 12.2, 13.3, 13.5 and 14.4) – Regulation 5(2)(a) | TR010032/APP/6.2 | 1.0 |
| Environmental Statement – Figures (Figures 2.3, 2.4, (part 7, 8, 9 and 10 of 10), 2.5, 7.16, 7.19 (2 and 4 of 4) and 11.1 – Regulation 5(2)(a) | TR010032/APP/6.2 | 3.0 |
| Environmental Statement – Figures (Figures 2.4 (part 4 of 10), 5.5, 6.1, 6.6, 7.4, 7.8, 7.19 (3 of 4), 7.20, 7.23, 7.24, 8.1, 8.32, 8.33, 10.2, 10.4, 12.1, 12.2, 13.3, 13.5 and 14.4) – Regulation 5(2)(a) | TR010032/APP/6.2 | 2.0 |
| Environmental Statement – Figures (Figures 2.1, 2.2 and 2.4 (parts 1, 3 and 6 of 10)) – Regulation 5(2)(a) | TR010032/APP/6.2 | 4.0 |
| Environmental Statement – Figures (Figures 2.4 (part 2 of 10), 7.19 (1 of 4)) – Regulation 5(2)(a) | TR010032/APP/6.2 | 5.0 |
| Environmental Statement – Figures (Figure 2.4 (part 5 of 10)) – Regulation 5(2)(a) | TR010032/APP/6.2 | 6.0 |
| Environmental Statement – Appendices (excluding Appendix 2.1, Appendix 2.2, Appendix 5.3, Appendix 6.7 (Part 1), Appendix 6.9, Appendix 6.10, Appendix 7.7, Appendix 7.8, Appendix 7.9, Appendix 7.10, Appendix 7.11, Appendix 8.16, Appendix 8.17, Appendix 8.18, Appendix 8.19, Appendix 8.20, Appendix 10.4, Appendix 10.11, Appendix 11.3, Appendix 12.4 and Appendix 14.6 (excluding Part 6 and 10)) – Regulation 5(2)(a) | TR010032/APP/6.3 | 1.0 |
| Environmental Statement – Appendices (Appendix 2.1, Appendix 5.3, Appendix 6.7 (Part 1), Appendix 6.10, Appendix 7.7, Appendix 7.8, Appendix 7.9, Appendix 7.10, Appendix 7.11, Appendix 8.16, Appendix 8.17, Appendix 8.18, Appendix 8.19, Appendix 8.20, Appendix 10.4, Appendix 10.11, Appendix 11.3, Appendix 12.4 and Appendix 14.6 (Part 6 and 10)) – Regulation 5(2)(a) | TR010032/APP/6.3 | 2.0 |
| Environmental Statement Addendum – Regulation 5(2)(a) | TR010032/EXAM/9.8 | 10.0 |
| Habitats Regulation Assessment – Regulation 5(2)(g) | TR010032/APP/6.5 | 1.0 |
| Statutory Nuisance Statement – Regulation 5(2)(f) | TR010032/APP/6.6 | 1.0 |
| Preliminary Navigational Risk Assessment – Regulation 5(2)(q) | TR010032/APP/7.15 | 3.0 |
| Coalhouse Point Flood Risk Assessment – Regulation 5(2)(q) | TR010032/EXAM/9.147 | 1.0 |
I336PART 3 OUTLINE MANAGEMENT PLANS AND RELATED CONTROL DOCUMENTS¶
|
(1)
Document
|
(2)
Document Reference
|
(3)
Revision
|
|---|---|---|
| Code of Construction Practice including the Register of Environmental Actions and Commitments (excluding Annex A, Annex B, Annex C, Annex D and Annex E) – Regulation 5(2)(q) | TR010032/APP/6.3 | 9.0 |
| Code of Construction Practice including the Register of Environmental Actions and Commitments (Annex A and Annex C) – Regulation 5(2)(q) | TR010032/APP/6.3 | 4.0 |
| Code of Construction Practice including the Register of Environmental Actions and Commitments (Annex B) – Regulation 5(2)(q) | TR010032/APP/6.3 | 5.0 |
| Code of Construction Practice including the Register of Environmental Actions and Commitments (Annex D and Annex E) – Regulation 5(2)(q) | TR010032/APP/6.3 | 2.0 |
| Draft Archaeological Mitigation Strategy and Outline Written Scheme of Investigation (Appendix 6.9 of the Environmental Statement) – Regulation 5(2)(q) | TR010032/APP/6.3 | 6.0 |
| Outline Landscape and Ecology Management Plan (excluding Appendix 1, 2 and 3) – Regulation 5(2)(q) | TR010032/APP/6.7 | 7.0 |
| Outline Landscape and Ecology Management Plan (Appendix 1 and 3) – Regulation 5(2)(q) | TR010032/APP/6.7 | 3.0 |
| Outline Landscape and Ecology Management Plan (Appendix 2) – Regulation 5(2)(q) | TR010032/APP/6.7 | 2.0 |
| Design Principles Document – Regulation 5(2)(q) | TR010032/APP/7.5 | 8.0 |
| Wider Network Impacts Management and Monitoring Plan – Regulation 5(2)(q) | TR010032/APP/7.12 | 2.0 |
| Framework Construction Travel Plan – Regulation 5(2)(q) | TR010032/APP/7.13 | 6.0 |
| Outline Traffic Management Plan for Construction – Regulation 5(2)(q) | TR010032/APP/7.14 | 9.0 |
| Carbon and Energy Management Plan – Regulation 5(2)(q) | TR010032/APP/7.19 | 5.0 |
| Stakeholder Actions and Commitments Register – Regulation 5(2)(q) | TR010032/APP/7.21 | 9.0 |
I337PART 4 OTHER CERTIFIED DOCUMENTS¶
|
(1)
Document
|
(2)
Document Reference
|
(3)
Revision
|
|---|---|---|
| Errata Report – Regulation 5(2)(o) | TR010032/APP/1.6 | 7.0 |
| Book of Reference – Regulation 5(2)(d) | TR010032/APP/4.2 | 9.0 |
| Road User Charging Statement – Regulation 5(2)(q) | TR010032/APP/7.6 | 2.0 |
| Community Impact Report – Regulation 5(2)(q) | TR010032/APP/7.16 | 2.0 |
| Mitigation Route Map - Regulation 5(2)(o) | TR010032/EXAM/9.90 | 1.0 |
Footnotes
- I1Art. 1 in force at 15.4.2025, see art. 1
- I2Art. 2 in force at 15.4.2025, see art. 1
- I3Art. 3 in force at 15.4.2025, see art. 1
- I4Art. 4 in force at 15.4.2025, see art. 1
- I5Art. 5 in force at 15.4.2025, see art. 1
- I6Art. 6 in force at 15.4.2025, see art. 1
- I7Art. 7 in force at 15.4.2025, see art. 1
- I8Art. 8 in force at 15.4.2025, see art. 1
- I9Art. 9 in force at 15.4.2025, see art. 1
- I10Art. 10 in force at 15.4.2025, see art. 1
- I11Art. 11 in force at 15.4.2025, see art. 1
- I12Art. 12 in force at 15.4.2025, see art. 1
- I13Art. 13 in force at 15.4.2025, see art. 1
- I14Art. 14 in force at 15.4.2025, see art. 1
- I15Art. 15 in force at 15.4.2025, see art. 1
- I16Art. 16 in force at 15.4.2025, see art. 1
- I17Art. 17 in force at 15.4.2025, see art. 1
- I18Art. 18 in force at 15.4.2025, see art. 1
- I19Art. 19 in force at 15.4.2025, see art. 1
- I20Art. 20 in force at 15.4.2025, see art. 1
- I21Art. 21 in force at 15.4.2025, see art. 1
- I22Art. 22 in force at 15.4.2025, see art. 1
- I23Art. 23 in force at 15.4.2025, see art. 1
- I24Art. 24 in force at 15.4.2025, see art. 1
- I25Art. 25 in force at 15.4.2025, see art. 1
- I26Art. 26 in force at 15.4.2025, see art. 1
- I27Art. 27 in force at 15.4.2025, see art. 1
- I28Art. 28 in force at 15.4.2025, see art. 1
- I29Art. 29 in force at 15.4.2025, see art. 1
- I30Art. 30 in force at 15.4.2025, see art. 1
- I31Art. 31 in force at 15.4.2025, see art. 1
- I32Art. 32 in force at 15.4.2025, see art. 1
- I33Art. 33 in force at 15.4.2025, see art. 1
- I34Art. 34 in force at 15.4.2025, see art. 1
- I35Art. 35 in force at 15.4.2025, see art. 1
- I36Art. 36 in force at 15.4.2025, see art. 1
- I37Art. 37 in force at 15.4.2025, see art. 1
- I38Art. 38 in force at 15.4.2025, see art. 1
- I39Art. 39 in force at 15.4.2025, see art. 1
- I40Art. 40 in force at 15.4.2025, see art. 1
- I41Art. 41 in force at 15.4.2025, see art. 1
- I42Art. 42 in force at 15.4.2025, see art. 1
- I43Art. 43 in force at 15.4.2025, see art. 1
- I44Art. 44 in force at 15.4.2025, see art. 1
- I45Art. 45 in force at 15.4.2025, see art. 1
- I46Art. 46 in force at 15.4.2025, see art. 1
- I47Art. 47 in force at 15.4.2025, see art. 1
- I48Art. 48 in force at 15.4.2025, see art. 1
- I49Art. 49 in force at 15.4.2025, see art. 1
- I50Art. 50 in force at 15.4.2025, see art. 1
- I51Art. 51 in force at 15.4.2025, see art. 1
- I52Art. 52 in force at 15.4.2025, see art. 1
- I53Art. 53 in force at 15.4.2025, see art. 1
- I54Art. 54 in force at 15.4.2025, see art. 1
- I55Art. 55 in force at 15.4.2025, see art. 1
- I56Art. 56 in force at 15.4.2025, see art. 1
- I57Art. 57 in force at 15.4.2025, see art. 1
- I58Art. 58 in force at 15.4.2025, see art. 1
- I59Art. 59 in force at 15.4.2025, see art. 1
- I60Art. 60 in force at 15.4.2025, see art. 1
- I61Art. 61 in force at 15.4.2025, see art. 1
- I62Art. 62 in force at 15.4.2025, see art. 1
- I63Art. 63 in force at 15.4.2025, see art. 1
- I64Art. 64 in force at 15.4.2025, see art. 1
- I65Art. 65 in force at 15.4.2025, see art. 1
- I66Art. 66 in force at 15.4.2025, see art. 1
- I67Art. 67 in force at 15.4.2025, see art. 1
- I68Art. 68 in force at 15.4.2025, see art. 1
- I69Sch. 2 para. 1 in force at 15.4.2025, see art. 1
- I70Sch. 2 para. 2 in force at 15.4.2025, see art. 1
- I71Sch. 2 para. 3 in force at 15.4.2025, see art. 1
- I72Sch. 2 para. 4 in force at 15.4.2025, see art. 1
- I73Sch. 2 para. 5 in force at 15.4.2025, see art. 1
- I74Sch. 2 para. 6 in force at 15.4.2025, see art. 1
- I75Sch. 2 para. 7 in force at 15.4.2025, see art. 1
- I76Sch. 2 para. 8 in force at 15.4.2025, see art. 1
- I77Sch. 2 para. 9 in force at 15.4.2025, see art. 1
- I78Sch. 2 para. 10 in force at 15.4.2025, see art. 1
- I79Sch. 2 para. 11 in force at 15.4.2025, see art. 1
- I80Sch. 2 para. 12 in force at 15.4.2025, see art. 1
- I81Sch. 2 para. 13 in force at 15.4.2025, see art. 1
- I82Sch. 2 para. 14 in force at 15.4.2025, see art. 1
- I83Sch. 2 para. 15 in force at 15.4.2025, see art. 1
- I84Sch. 2 para. 16 in force at 15.4.2025, see art. 1
- I85Sch. 2 para. 17 in force at 15.4.2025, see art. 1
- I86Sch. 2 para. 18 in force at 15.4.2025, see art. 1
- I87Sch. 2 para. 19 in force at 15.4.2025, see art. 1
- I88Sch. 2 para. 20 in force at 15.4.2025, see art. 1
- I89Sch. 2 para. 21 in force at 15.4.2025, see art. 1
- I90Sch. 2 para. 22 in force at 15.4.2025, see art. 1
- I91Sch. 2 para. 23 in force at 15.4.2025, see art. 1
- I92Sch. 2 para. 24 in force at 15.4.2025, see art. 1
- I93Sch. 2 para. 25 in force at 15.4.2025, see art. 1
- I94Sch. 2 para. 26 in force at 15.4.2025, see art. 1
- I95Sch. 2 para. 27 in force at 15.4.2025, see art. 1
- I96Sch. 2 para. 28 in force at 15.4.2025, see art. 1
- I97Sch. 2 para. 29 in force at 15.4.2025, see art. 1
- I98Sch. 2 para. 30 in force at 15.4.2025, see art. 1
- I99Sch. 2 para. 31 in force at 15.4.2025, see art. 1
- I100Sch. 9 para. 1 in force at 15.4.2025, see art. 1
- I101Sch. 9 para. 2 in force at 15.4.2025, see art. 1
- I102Sch. 9 para. 3 in force at 15.4.2025, see art. 1
- I103Sch. 9 para. 4 in force at 15.4.2025, see art. 1
- I104Sch. 9 para. 5 in force at 15.4.2025, see art. 1
- I105Sch. 9 para. 6 in force at 15.4.2025, see art. 1
- I106Sch. 12 para. 1 in force at 15.4.2025, see art. 1
- I107Sch. 12 para. 2 in force at 15.4.2025, see art. 1
- I108Sch. 12 para. 3 in force at 15.4.2025, see art. 1
- I109Sch. 12 para. 4 in force at 15.4.2025, see art. 1
- I110Sch. 12 para. 5 in force at 15.4.2025, see art. 1
- I111Sch. 12 para. 6 in force at 15.4.2025, see art. 1
- I112Sch. 12 para. 7 in force at 15.4.2025, see art. 1
- I113Sch. 12 para. 8 in force at 15.4.2025, see art. 1
- I114Sch. 12 para. 9 in force at 15.4.2025, see art. 1
- I115Sch. 12 para. 10 in force at 15.4.2025, see art. 1
- I116Sch. 12 para. 11 in force at 15.4.2025, see art. 1
- I117Sch. 12 para. 12 in force at 15.4.2025, see art. 1
- I118Sch. 12 para. 13 in force at 15.4.2025, see art. 1
- I119Sch. 13 para. 1 in force at 15.4.2025, see art. 1
- I120Sch. 13 para. 2 in force at 15.4.2025, see art. 1
- I121Sch. 13 para. 3 in force at 15.4.2025, see art. 1
- I122Sch. 13 para. 4 in force at 15.4.2025, see art. 1
- I123Sch. 13 para. 5 in force at 15.4.2025, see art. 1
- I124Sch. 13 para. 6 in force at 15.4.2025, see art. 1
- I125Sch. 13 para. 7 in force at 15.4.2025, see art. 1
- I126Sch. 13 para. 8 in force at 15.4.2025, see art. 1
- I127Sch. 13 para. 9 in force at 15.4.2025, see art. 1
- I128Sch. 13 para. 10 in force at 15.4.2025, see art. 1
- I129Sch. 14 para. 1 in force at 15.4.2025, see art. 1
- I130Sch. 14 para. 2 in force at 15.4.2025, see art. 1
- I131Sch. 14 para. 3 in force at 15.4.2025, see art. 1
- I132Sch. 14 para. 4 in force at 15.4.2025, see art. 1
- I133Sch. 14 para. 5 in force at 15.4.2025, see art. 1
- I134Sch. 14 para. 6 in force at 15.4.2025, see art. 1
- I135Sch. 14 para. 7 in force at 15.4.2025, see art. 1
- I136Sch. 14 para. 8 in force at 15.4.2025, see art. 1
- I137Sch. 14 para. 9 in force at 15.4.2025, see art. 1
- I138Sch. 14 para. 10 in force at 15.4.2025, see art. 1
- I139Sch. 14 para. 11 in force at 15.4.2025, see art. 1
- I140Sch. 14 para. 12 in force at 15.4.2025, see art. 1
- I141Sch. 14 para. 13 in force at 15.4.2025, see art. 1
- I142Sch. 14 para. 14 in force at 15.4.2025, see art. 1
- I143Sch. 14 para. 15 in force at 15.4.2025, see art. 1
- I144Sch. 14 para. 16 in force at 15.4.2025, see art. 1
- I145Sch. 14 para. 17 in force at 15.4.2025, see art. 1
- I146Sch. 14 para. 18 in force at 15.4.2025, see art. 1
- I147Sch. 14 para. 19 in force at 15.4.2025, see art. 1
- I148Sch. 14 para. 20 in force at 15.4.2025, see art. 1
- I149Sch. 14 para. 21 in force at 15.4.2025, see art. 1
- I150Sch. 14 para. 22 in force at 15.4.2025, see art. 1
- I151Sch. 14 para. 23 in force at 15.4.2025, see art. 1
- I152Sch. 14 para. 24 in force at 15.4.2025, see art. 1
- I153Sch. 14 para. 25 in force at 15.4.2025, see art. 1
- I154Sch. 14 para. 26 in force at 15.4.2025, see art. 1
- I155Sch. 14 para. 27 in force at 15.4.2025, see art. 1
- I156Sch. 14 para. 28 in force at 15.4.2025, see art. 1
- I157Sch. 14 para. 29 in force at 15.4.2025, see art. 1
- I158Sch. 14 para. 30 in force at 15.4.2025, see art. 1
- I159Sch. 14 para. 31 in force at 15.4.2025, see art. 1
- I160Sch. 14 para. 32 in force at 15.4.2025, see art. 1
- I161Sch. 14 para. 33 in force at 15.4.2025, see art. 1
- I162Sch. 14 para. 34 in force at 15.4.2025, see art. 1
- I163Sch. 14 para. 35 in force at 15.4.2025, see art. 1
- I164Sch. 14 para. 36 in force at 15.4.2025, see art. 1
- I165Sch. 14 para. 37 in force at 15.4.2025, see art. 1
- I166Sch. 14 para. 38 in force at 15.4.2025, see art. 1
- I167Sch. 14 para. 39 in force at 15.4.2025, see art. 1
- I168Sch. 14 para. 40 in force at 15.4.2025, see art. 1
- I169Sch. 14 para. 41 in force at 15.4.2025, see art. 1
- I170Sch. 14 para. 42 in force at 15.4.2025, see art. 1
- I171Sch. 14 para. 43 in force at 15.4.2025, see art. 1
- I172Sch. 14 para. 44 in force at 15.4.2025, see art. 1
- I173Sch. 14 para. 45 in force at 15.4.2025, see art. 1
- I174Sch. 14 para. 46 in force at 15.4.2025, see art. 1
- I175Sch. 14 para. 47 in force at 15.4.2025, see art. 1
- I176Sch. 14 para. 48 in force at 15.4.2025, see art. 1
- I177Sch. 14 para. 49 in force at 15.4.2025, see art. 1
- I178Sch. 14 para. 50 in force at 15.4.2025, see art. 1
- I179Sch. 14 para. 51 in force at 15.4.2025, see art. 1
- I180Sch. 14 para. 52 in force at 15.4.2025, see art. 1
- I181Sch. 14 para. 53 in force at 15.4.2025, see art. 1
- I182Sch. 14 para. 54 in force at 15.4.2025, see art. 1
- I183Sch. 14 para. 55 in force at 15.4.2025, see art. 1
- I184Sch. 14 para. 56 in force at 15.4.2025, see art. 1
- I185Sch. 14 para. 57 in force at 15.4.2025, see art. 1
- I186Sch. 14 para. 58 in force at 15.4.2025, see art. 1
- I187Sch. 14 para. 59 in force at 15.4.2025, see art. 1
- I188Sch. 14 para. 60 in force at 15.4.2025, see art. 1
- I189Sch. 14 para. 61 in force at 15.4.2025, see art. 1
- I190Sch. 14 para. 62 in force at 15.4.2025, see art. 1
- I191Sch. 14 para. 63 in force at 15.4.2025, see art. 1
- I192Sch. 14 para. 64 in force at 15.4.2025, see art. 1
- I193Sch. 14 para. 65 in force at 15.4.2025, see art. 1
- I194Sch. 14 para. 66 in force at 15.4.2025, see art. 1
- I195Sch. 14 para. 67 in force at 15.4.2025, see art. 1
- I196Sch. 14 para. 68 in force at 15.4.2025, see art. 1
- I197Sch. 14 para. 69 in force at 15.4.2025, see art. 1
- I198Sch. 14 para. 70 in force at 15.4.2025, see art. 1
- I199Sch. 14 para. 71 in force at 15.4.2025, see art. 1
- I200Sch. 14 para. 72 in force at 15.4.2025, see art. 1
- I201Sch. 14 para. 73 in force at 15.4.2025, see art. 1
- I202Sch. 14 para. 74 in force at 15.4.2025, see art. 1
- I203Sch. 14 para. 75 in force at 15.4.2025, see art. 1
- I204Sch. 14 para. 76 in force at 15.4.2025, see art. 1
- I205Sch. 14 para. 77 in force at 15.4.2025, see art. 1
- I206Sch. 14 para. 78 in force at 15.4.2025, see art. 1
- I207Sch. 14 para. 79 in force at 15.4.2025, see art. 1
- I208Sch. 14 para. 80 in force at 15.4.2025, see art. 1
- I209Sch. 14 para. 81 in force at 15.4.2025, see art. 1
- I210Sch. 14 para. 82 in force at 15.4.2025, see art. 1
- I211Sch. 14 para. 83 in force at 15.4.2025, see art. 1
- I212Sch. 14 para. 84 in force at 15.4.2025, see art. 1
- I213Sch. 14 para. 85 in force at 15.4.2025, see art. 1
- I214Sch. 14 para. 86 in force at 15.4.2025, see art. 1
- I215Sch. 14 para. 87 in force at 15.4.2025, see art. 1
- I216Sch. 14 para. 88 in force at 15.4.2025, see art. 1
- I217Sch. 14 para. 89 in force at 15.4.2025, see art. 1
- I218Sch. 14 para. 90 in force at 15.4.2025, see art. 1
- I219Sch. 14 para. 91 in force at 15.4.2025, see art. 1
- I220Sch. 14 para. 92 in force at 15.4.2025, see art. 1
- I221Sch. 14 para. 93 in force at 15.4.2025, see art. 1
- I222Sch. 14 para. 94 in force at 15.4.2025, see art. 1
- I223Sch. 14 para. 95 in force at 15.4.2025, see art. 1
- I224Sch. 14 para. 96 in force at 15.4.2025, see art. 1
- I225Sch. 14 para. 97 in force at 15.4.2025, see art. 1
- I226Sch. 14 para. 98 in force at 15.4.2025, see art. 1
- I227Sch. 14 para. 99 in force at 15.4.2025, see art. 1
- I228Sch. 14 para. 100 in force at 15.4.2025, see art. 1
- I229Sch. 14 para. 101 in force at 15.4.2025, see art. 1
- I230Sch. 14 para. 102 in force at 15.4.2025, see art. 1
- I231Sch. 14 para. 103 in force at 15.4.2025, see art. 1
- I232Sch. 14 para. 104 in force at 15.4.2025, see art. 1
- I233Sch. 14 para. 105 in force at 15.4.2025, see art. 1
- I234Sch. 14 para. 106 in force at 15.4.2025, see art. 1
- I235Sch. 14 para. 107 in force at 15.4.2025, see art. 1
- I236Sch. 14 para. 108 in force at 15.4.2025, see art. 1
- I237Sch. 14 para. 109 in force at 15.4.2025, see art. 1
- I238Sch. 14 para. 110 in force at 15.4.2025, see art. 1
- I239Sch. 14 para. 111 in force at 15.4.2025, see art. 1
- I240Sch. 14 para. 112 in force at 15.4.2025, see art. 1
- I241Sch. 14 para. 113 in force at 15.4.2025, see art. 1
- I242Sch. 14 para. 114 in force at 15.4.2025, see art. 1
- I243Sch. 14 para. 115 in force at 15.4.2025, see art. 1
- I244Sch. 14 para. 116 in force at 15.4.2025, see art. 1
- I245Sch. 14 para. 117 in force at 15.4.2025, see art. 1
- I246Sch. 14 para. 118 in force at 15.4.2025, see art. 1
- I247Sch. 14 para. 119 in force at 15.4.2025, see art. 1
- I248Sch. 14 para. 120 in force at 15.4.2025, see art. 1
- I249Sch. 14 para. 121 in force at 15.4.2025, see art. 1
- I250Sch. 14 para. 122 in force at 15.4.2025, see art. 1
- I251Sch. 14 para. 123 in force at 15.4.2025, see art. 1
- I252Sch. 14 para. 124 in force at 15.4.2025, see art. 1
- I253Sch. 14 para. 125 in force at 15.4.2025, see art. 1
- I254Sch. 14 para. 126 in force at 15.4.2025, see art. 1
- I255Sch. 14 para. 127 in force at 15.4.2025, see art. 1
- I256Sch. 14 para. 128 in force at 15.4.2025, see art. 1
- I257Sch. 14 para. 129 in force at 15.4.2025, see art. 1
- I258Sch. 14 para. 130 in force at 15.4.2025, see art. 1
- I259Sch. 14 para. 131 in force at 15.4.2025, see art. 1
- I260Sch. 14 para. 132 in force at 15.4.2025, see art. 1
- I261Sch. 14 para. 134 in force at 15.4.2025, see art. 1
- I262Sch. 14 para. 135 in force at 15.4.2025, see art. 1
- I263Sch. 14 para. 137 in force at 15.4.2025, see art. 1
- I264Sch. 14 para. 138 in force at 15.4.2025, see art. 1
- I265Sch. 14 para. 139 in force at 15.4.2025, see art. 1
- I266Sch. 14 para. 141 in force at 15.4.2025, see art. 1
- I267Sch. 14 para. 142 in force at 15.4.2025, see art. 1
- I268Sch. 14 para. 143 in force at 15.4.2025, see art. 1
- I269Sch. 14 para. 144 in force at 15.4.2025, see art. 1
- I270Sch. 14 para. 146 in force at 15.4.2025, see art. 1
- I271Sch. 14 para. 147 in force at 15.4.2025, see art. 1
- I272Sch. 14 para. 148 in force at 15.4.2025, see art. 1
- I273Sch. 14 para. 149 in force at 15.4.2025, see art. 1
- I274Sch. 14 para. 150 in force at 15.4.2025, see art. 1
- I275Sch. 14 para. 151 in force at 15.4.2025, see art. 1
- I276Sch. 14 para. 152 in force at 15.4.2025, see art. 1
- I277Sch. 14 para. 153 in force at 15.4.2025, see art. 1
- I278Sch. 14 para. 154 in force at 15.4.2025, see art. 1
- I279Sch. 14 para. 155 in force at 15.4.2025, see art. 1
- I280Sch. 14 para. 156 in force at 15.4.2025, see art. 1
- I281Sch. 14 para. 157 in force at 15.4.2025, see art. 1
- I282Sch. 14 para. 158 in force at 15.4.2025, see art. 1
- I283Sch. 14 para. 159 in force at 15.4.2025, see art. 1
- I284Sch. 14 para. 160 in force at 15.4.2025, see art. 1
- I285Sch. 14 para. 161 in force at 15.4.2025, see art. 1
- I286Sch. 14 para. 162 in force at 15.4.2025, see art. 1
- I287Sch. 14 para. 163 in force at 15.4.2025, see art. 1
- I288Sch. 14 para. 164 in force at 15.4.2025, see art. 1
- I289Sch. 15 para. 1 in force at 15.4.2025, see art. 1
- I290Sch. 15 para. 2 in force at 15.4.2025, see art. 1
- I291Sch. 15 para. 3 in force at 15.4.2025, see art. 1
- I292Sch. 15 para. 4 in force at 15.4.2025, see art. 1
- I293Sch. 15 para. 5 in force at 15.4.2025, see art. 1
- I294Sch. 15 para. 6 in force at 15.4.2025, see art. 1
- I295Sch. 15 para. 7 in force at 15.4.2025, see art. 1
- I296Sch. 15 para. 8 in force at 15.4.2025, see art. 1
- I297Sch. 15 para. 9 in force at 15.4.2025, see art. 1
- I298Sch. 15 para. 10 in force at 15.4.2025, see art. 1
- I299Sch. 15 para. 11 in force at 15.4.2025, see art. 1
- I300Sch. 15 para. 12 in force at 15.4.2025, see art. 1
- I301Sch. 15 para. 13 in force at 15.4.2025, see art. 1
- I302Sch. 15 para. 14 in force at 15.4.2025, see art. 1
- I303Sch. 15 para. 15 in force at 15.4.2025, see art. 1
- I304Sch. 15 para. 16 in force at 15.4.2025, see art. 1
- I305Sch. 15 para. 17 in force at 15.4.2025, see art. 1
- I306Sch. 15 para. 18 in force at 15.4.2025, see art. 1
- I307Sch. 15 para. 19 in force at 15.4.2025, see art. 1
- I308Sch. 15 para. 20 in force at 15.4.2025, see art. 1
- I309Sch. 15 para. 21 in force at 15.4.2025, see art. 1
- I310Sch. 15 para. 22 in force at 15.4.2025, see art. 1
- I311Sch. 15 para. 23 in force at 15.4.2025, see art. 1
- I312Sch. 15 para. 24 in force at 15.4.2025, see art. 1
- I313Sch. 15 para. 25 in force at 15.4.2025, see art. 1
- I314Sch. 1 Pt. 1 in force at 15.4.2025, see art. 1
- I315Sch. 1 Pt. 2 in force at 15.4.2025, see art. 1
- I316Sch. 3 in force at 15.4.2025, see art. 1
- I317Sch. 4 Pt. 1 in force at 15.4.2025, see art. 1
- I318Sch. 4 Pt. 2 in force at 15.4.2025, see art. 1
- I319Sch. 4 Pt. 3 in force at 15.4.2025, see art. 1
- I320Sch. 4 Pt. 4 in force at 15.4.2025, see art. 1
- I321Sch. 5 Pt. 1 in force at 15.4.2025, see art. 1
- I322Sch. 5 Pt. 2 in force at 15.4.2025, see art. 1
- I323Sch. 5 Pt. 3 in force at 15.4.2025, see art. 1
- I324Sch. 5 Pt. 4 in force at 15.4.2025, see art. 1
- I325Sch. 5 Pt. 5 in force at 15.4.2025, see art. 1
- I326Sch. 5 Pt. 6 in force at 15.4.2025, see art. 1
- I327Sch. 6 Pt. 1 in force at 15.4.2025, see art. 1
- I328Sch. 6 Pt. 2 in force at 15.4.2025, see art. 1
- I329Sch. 6 Pt. 3 in force at 15.4.2025, see art. 1
- I330Sch. 7 in force at 15.4.2025, see art. 1
- I331Sch. 8 in force at 15.4.2025, see art. 1
- I332Sch. 10 in force at 15.4.2025, see art. 1
- I333Sch. 11 in force at 15.4.2025, see art. 1
- I334Sch. 16 Pt. 1 in force at 15.4.2025, see art. 1
- I335Sch. 16 Pt. 2 in force at 15.4.2025, see art. 1
- I336Sch. 16 Pt. 3 in force at 15.4.2025, see art. 1
- I337Sch. 16 Pt. 4 in force at 15.4.2025, see art. 1
- F1Words in Sch. 1 Pt. 1 substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F2Words in Sch. 3 substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F3Word in Sch. 4 Pt. 1 inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F4Words in art. 2 substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F5Words in art. 15(7) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F6Words in art. 16(7) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F7Words in art. 24(3)(c) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F8Words in art. 30(6) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F9Words in art. 31(4) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F10Words in art. 31(10) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F11Words in art. 31(11) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F12Art. 31(15) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F13Words in art. 32(2) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F14Art. 32(5) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F15Words in art. 33(2)(b) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F16Art. 33(9) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F17Word in art. 40(1)(a) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F18Words in art. 40(1)(b) omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F19Art. 40(1)(c) omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F20Words in art. 48(10) renumbered (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F21Words in art. 49(17) omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F22Words in art. 49(17) renumbered (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F23Words in art. 53(1)(a) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F24Words in art. 53(7) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F25Words in art. 68(4)(c) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F26Words in art. 68(4)(e) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F27Words in Sch. 2 para. 9(7)(a) inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F28Words in Sch. 2 para. 21(1)(b) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F29Words in Sch. 2 para. 22(4) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F30Words in Sch. 2 para. 23(1)(a) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F31Words in Sch. 2 para. 26(4) Table 2 substituted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F32Words in Sch. 2 para. 26(4) Table 2 omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F33Words in Sch. 2 para. 26(4) Table 2 inserted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F34Words in Sch. 2 para. 31 table 5 substituted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F35Word in Sch. 9 para. 2(2) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F36Words in Sch. 14 para. 92(1) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F37Words in Sch. 14 para. 129 omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F38Word in Sch. 14 para. 130(2) omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F39Words in Sch. 14 para. 130(2) omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F40Sch. 14 para. 132(9) omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F41Words in Sch. 14 para. 132(10) substituted (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F42Sch. 14 para. 133 omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F43Sch. 14 para. 134(1)(b) omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F44Sch. 14 para. 134(4)(5) omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F45Sch. 14 para. 136 omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F46Sch. 14 para. 140 omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F47Sch. 14 para. 145 omitted (12.9.2025) by virtue of The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.
- F48Art. 40(3)(a): by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), Sch., it is provided that (12.9.2025) the word “; and” is inserted after the words “under paragraph (1)”
- F49Art. 40(3)(b): by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), Sch., it is provided that (12.9.2025) “(b) obtain certification from the relevant planning authority that the scheme has been laid out to its satisfaction,” is inserted after sub-paragraph (a)
- F50Art. 40(3): by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), Sch., it is provided that (12.9.2025) the words “replacement land has been certified by the relevant planning authority as” are substituted for the words “replacement land is”
- F51Art. 65(2) substituted (5.11.2025) by The A122 (Lower Thames Crossing) Development Consent (Amendment) (No. 2) Order 2025 (S.I. 2025/1164), arts. 1, 2(2)(a)
- F52Art. 65(8) inserted (5.11.2025) by The A122 (Lower Thames Crossing) Development Consent (Amendment) (No. 2) Order 2025 (S.I. 2025/1164), arts. 1, 2(2)(b)
- F53Words in Sch. 2 para. 26(4) Table 2 substituted (5.11.2025) by The A122 (Lower Thames Crossing) Development Consent (Amendment) Order 2025 (S.I. 2025/1161), arts. 1, 2(2)
- 1
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
- 2
S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2014/469, S.I. 2014/2381, S.I. 2015/377, S.I. 2015/1682, S.I. 2017/524, S.I. 2017/572, S.I. 2018/378, S.I. 2019/734, S.I. 2020/764, S.I. 20201534, S.I. 2021/978, S.I. 2022/634, S.I. 2023/1071 and S.I. 2024/332.
- 3
S.I. 2010/103, amended by S.I. 2012/635 and S.I. 2024/317.
- 4
1981 c. 67.
- 5
Section 114 was amended by paragraph 55 of Part 1 of Schedule 11 to the Localism Act 2011.
- 6
Section 115 was amended by paragraph 56 of Part 1 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011, section 160 of the Housing and Planning Act 2016 (c. 22) and section 43 of the Wales Act 2017 (c. 4).
- 7
Section 117 was amended by paragraph 58 of Part 1 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011.
- 8
Section 120 was amended by section 140 of, and paragraph 60 of Part 1 of Schedule 13 to, the Localism Act 2011.
- 9
Section 122 was amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
- 10
Section 123 was amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
- 11
Section 127 was amended by paragraph 64 of Part 1 of Schedule 13 to the Localism Act 2011 and section 23(2) of the Growth and Infrastructure Act 2013 (c. 27).
- 12
Section 131 was amended by section 24(2) of the Growth and Infrastructure Act 2013.
- 13
Section 138 was amended by section 23(4) of the Growth and Infrastructure Act 2013 and S.I. 2017/1285.
- 14
Section 147 was amended by paragraph 68(2) of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011.
- 15
Paragraphs 30A was inserted by paragraph 4(5) of Part 1 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23) and amended by paragraph 76 of Part 3 of Schedule 6 to the Wales Act 2017.
- 16
Paragraph 30B was inserted by paragraph 4(5) of Part 1 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23) and amended by paragraph 76 of Part 3 of Schedule 6 to the Wales Act 2017.
- 17
Paragraphs 32A and 32B were inserted by paragraph 71(3) of Part 1 of Schedule 13 to the Localism Act 2011.
- 18
6 Geo. 4 c. 25 (1825).
- 19
1961 c. 33.
- 20
1965 c. 56.
- 21
1968 c. xxxii.
- 22
1980 c. 66.
- 23
1981 c. 66.
- 24
1984 c. 27.
- 25
1990 c. 8.
- 26
1991 c. 22.
- 27
2000 c. 38.
- 28
2004 c. 18.
- 29
S.I. 2017/3.
- 30
2004 c. 21. Section 44 was amended by section 6 of the Emergency Workers (Obstruction) Act 2006 (c. 39).
- 31
2002 c. 30. Section 41 was amended by section 52 of, and paragraph 42 of Schedule 14 to, the Police and Justice Act 2006 (c. 48).
- 32
1971 c. 80.
- 33
The definition of “cycle track” was amended by section 1 of the Cycle Tracks Act 1984 (c. 38) and paragraph 21(2) of Schedule 3 to the Road Traffic (Consequential Provisions) Act 1988 (c. 54).
- 34
2003 c. 21. Section 32(1) was amended by S.I. 2011/1210.
- 35
S.I. 2016/1154.
- 36
Section 1 was amended by paragraph 1 of Part 1 of Schedule 4, and Schedule 17, to the Local Government Act 1985 (c. 51), section 21(2) of the New Roads and Street Works Act 1991 (c. 22), paragraph 1 of Part 1 of Schedule 7 to the Local Government (Wales) Act 1994 (c. 19), section 259(1) to (3) of the Greater London Authority Act 1999 (c. 27) and paragraph 2 of Part 1 of Schedule 1 to the Infrastructure Act 2015 (c. 7).
- 37
1981 c. 67. The definition of “owner” was amended by paragraph 9 of Schedule 15 to the Planning and Compensation Act 1992 (c. 34). There are other amendments to section 7 which are not relevant to the Order.
- 38
1994 c. 22.
- 39
The definition of “special road” was amended by paragraph 29(2) of Schedule 2 to the Planning Act 2008.
- 40
The definition of “special road” was amended by paragraph 20(2) of Schedule 2 to the Planning Act 2008.
- 41
Section 121A was inserted by section 168(1) of, and paragraph 70 of Part 2 of Schedule 8 to, the New Roads and Street Works Act 1991 and amended by section 1(6) of, and paragraphs 70 and 95 of Schedule 1 to, the Infrastructure Act 2015 (c. 7) and S.I. 2001/1400.
- 42
Section 10 was amended by section 22(2) of the New Roads and Street Works Act 1991, paragraph 22 of Schedule 2 to the Planning Act 2008 and by section 1 of, and paragraph 10 of Schedule 1 to, the Infrastructure Act 2015.
- 43
Section 19(1) was amended by section 1 of, and paragraph 15 of Schedule 1 to, the Infrastructure Act 2015.
- 44
1991 c. 59. The definition of “drainage” was substituted by section 100(2) of the Environment Act 1995 (c. 25).
- 45
2006 c. 46.
- 46
Section 64 was amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(2) of, and Schedule 9 to, the New Roads and Street Works Act 1991 (c. 22).
- 47
Section 184 was amended by sections 35, 37, 38 and 46 of the Criminal Justice Act 1982 (c. 48); section 4 of, and paragraph 45(11) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11); and section 168 of, and paragraph 9 of Schedule 8 and Schedule 9 to, the New Roads and Street Works Act 1991.
- 48
Section 56 was amended by sections 40(1) and (2) and 43 of, and Schedule 1 to, the Traffic Management Act 2004 (c. 18).
- 49
Section 56A was inserted by section 44 of the Traffic Management Act 2004.
- 50
Section 58 was amended by sections 40(1) and (2) and 51 of, and Schedule 1 to, the Traffic Management Act 2004.
- 51
Section 58A was inserted by section 52 of the Traffic Management Act 2004.
- 52
Schedule 3A was inserted by section 52(2) of, and Schedule 4 to, the Traffic Management Act 2004.
- 53
Section 54 was amended by sections 40(1) and (2) and 49(1) of, and Schedule 1 to, the Traffic Management Act 2004.
- 54
Section 55 was amended by sections 40(1) and (2), 49(2) and 51(9) of, and Schedule 1 to, the Traffic Management Act 2004.
- 55
Section 57 was amended by sections 40(1) and (2) and 52(3) of, and Schedule 1 to, the Traffic Management Act 2004.
- 56
Section 59 was amended by section 42 of the Traffic Management Act 2004.
- 57
Section 60 was amended by sections 40(1) and (2) and 49(1) of, and Schedule 1 to, the Traffic Management Act 2004.
- 58
Section 68 was amended by sections 40(1) and (2) and 49(1) of, and Schedule 1 to, the Traffic Management Act 2004.
- 59
Section 69 was amended by sections 40(1) and (2) and 49(1) of, and Schedule 1 to, the Traffic Management Act 2004.
- 60
Section 75 was substituted by section 58(2) of the Traffic Management Act 2004.
- 61
Section 74A was inserted by section 255(1) of the Transport Act 2000 (c. 38) and amended by section 40(4) of the Traffic Management Act 2004 and section 120 of the Infrastructure Act 2015 (c. 7).
- 62
S.I. 2012/425, as amended by S.I. 2015/377 and S.I. 2018/215.
- 63
Section 10(2) was amended by section 22(2)(a) of the New Roads and Street Works Act 1991 and by section 1(6) of, and paragraphs 1 and 10(1) and (2) of Schedule 1 to the Infrastructure Act 2015 (c. 7).
- 64
Section 14D was inserted by section 263(1) of the Greater London Authority Act 1999 (c. 29).
- 65
S.I. 2011/935.
- 66
2003 c. 21. Schedule 3A was inserted by section 4(2) of, and Schedule 1 to, the Digital Economy Act 2017 (c. 30).
- 67
1991 c. 56.
- 68
S.I. 2012/936, amended by S.I. 2013/3108 and S.I. 2015/643.
- 69
S.I. 2016/362, amended by S.I. 2017/1011, S.I. 2017/1086, S.I. 2018/161, S.I. 2020/663, S.I. 2021/75, S.I. 2022/111, S.I. 2023/783 and S.I. 2023/1112.
- 70
Section 32 was amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51), and section 180(1) of, and paragraph 134(4) of Schedule 13 to, the Local Government etc. (Scotland) Act 1994 (c. 39).
- 71
1991 c. 56. Section 106 was amended by sections 35(1) and (8), 43(2) and 56(7) of, and Schedule 2 to, the Competition and Service (Utilities) Act 1992 (c. 43), sections 36(2) and 99 of the Water Act 2003 (c. 37) and paragraph 16(1) of Schedule 3 to the Flood and Water Management Act 2010 (c. 29).
- 72
S.I. 2016/1154.
- 73
1991 c. 57.
- 74
1990 c. 9. Section 1 was amended by paragraph 8 of Schedule 17 to the Enterprise and Regulatory Reform Act 2013 (c. 24) and by section 26(1) of the Historic Environment (Wales) Act 2016 (anaw 4) .
- 75
Section 152 was amended by S.I 2009/1307.
- 76
Section13 was amended by sections 62(3), 139(4) to (9) and 146 of, and paragraphs 27 and 28 of Schedule 13 and Part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
- 77
Section 125 was amended by section 190 of, and paragraph 17 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22)
- 78
1857 c. 81. Section 25 was substituted by section 2 of the Church of England (Miscellaneous Provisions) Measure 2014 (No. 1) and amended by section 96(1) of, and paragraph 1 of Schedule 3 to, the Ecclesiastical Jurisdiction and Care of Churches Measure 2018 (no. 3).
- 79
S.I. 1950/792.
- 80
S.I. 1997/1160.
- 81
1981 c. 67.
- 82
Schedule 2A was inserted by paragraphs 1 and 2 of Schedule 17 to the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.
- 83
Section 11(1) was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981, section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), and sections 186 (1) and (2), 187 and 188 of the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.
- 84
Section 152 was amended by S.I. 2009/1307.
- 85
Section 138 was amended by section 23(1) and (4) of the Growth and Infrastructure Act 2013 (c. 27) and S.I. 2017/1285.
- 86
Section 125 was amended by section 190 of, and paragraph 17 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22).
- 87
Section 4A(1) was inserted by section 202(1) of the Housing and Planning Act 2016 (c. 22).
- 88
Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016 (c. 22).
- 89
Schedule 2A was inserted by section 199(1) of, and paragraphs 1 and 3 of Schedule 17 to, the Housing and Planning Act 2016.
- 90
Section 5 was amended by Schedule 15 to the Housing and Planning Act 2016.
- 91
Section 5A was inserted by section 182(2) of the Housing and Planning Act 2016.
- 92
Section 5B(1) was inserted by section 202(2) of the Housing and Planning Act 2016.
- 93
Section 6 was amended by paragraph 7 of Schedule 15 to the Housing and Planning Act 2016 and section 4 of, and paragraph 52(2) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11).
- 94
Section 7(1) was substituted by Schedule 18 to the Housing and Planning Act 2016.
- 95
Section 8 was amended by paragraph 4 of Schedule 18 to the Housing and Planning Act 2016 and section 186(3) of the Levelling-up and Regeneration Act 2023 (c. 55).
- 96
Section 11 was amended by paragraph 52(3) of Schedule 2 to the Planning (Consequential Provisions) Act 1990 (c. 11) and S.I. 2009/1307.
- 97
Schedule A1 was inserted by paragraph 6 of Part 1 of Schedule 18 to the Housing and Planning Act 2016.
- 98
Section 153(4A) was inserted by section 200(1) and (2) of the Housing and Planning Act 2016 (c. 22).
- 99
Section 11 was amended by section 34(1) of, and Schedule 4 to the Acquisition of Land Act 1981 (c. 67), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1) and sections 186, 187 and 188 of, and paragraph 6 of Schedules 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22).
- 100
Section 4 was amended by sections 184 and 185 of, and paragraph 2 of Schedule 18 to, the Housing and Planning Act 2016.
- 101
Section 152 was amended by S.I. 2009/1307.
- 102
Section 13 was amended by sections 62(3) and 139(4) to (9) of, and paragraphs 27 and 28 of Schedule 13, and Part 3 of Schedule 23, to the Tribunals, Courts and Enforcement Act 2007 (c. 15).
- 103
Section 125 was amended by paragraph 17 of Schedule 16 to the Housing and Planning Act 2016.
- 104
2003 c. 21. Section 151 was amended by S.I. 2011/1210.
- 105
2006. c. 26. Section 14 was amended by paragraph 21 of Schedule 1 to the Church Property Measure 2018 (No. 8).
- 106
S.I. 2014/3038.
- 107
1893 c. cii.
- 108
1925 c. 20.
- 109
S.I. 1987/37.
- 110
1994 c. 22.
- 111
1978 c. 3. Section 2(1) was amended by the Criminal Justice Act 1982 (c. 48).
- 112
S.I. 2008/2095, amended by S.I. 2008/3013.
- 113
1972 c. 70. Section 236 was amended by sections 76 and 166 of the Greater London Authority Act 1999 (c. 29) and S.I. 2001/3719. There are other amendments to section 236 but none are relevant to this Order.
- 114
S.I. 2016/165.
- 115
1991 c. 57.
- 116
1991 c. 59.
- 117
S.I. 2016/1154.
- 118
2017 c. 20.
- 119
1922 c. 51.
- 120
S.I. 2010/948, amended by S.I. 2011/987; there are other amending instruments but none are relevant to this Order.
- 121
S.I. 2015/596, amended by S.I. 2015/659.
- 122
1925 c. 20.
- 123
1800 c. xxiii.
- 124
1804 c. xlvi.
- 125
1810 c. lxxvi.
- 126
1893 c. cii.
- 127
1902 c. cxliii.
- 128
1933 c. xliv.
- 129
1936 c. lix.
- 130
1972 c. xlv.
- 131
1981 c. xviii.
- 132
1986 c. iv.
- 133
1987 c. xx.
- 134
1996 c. 61.
- 135
1972 c. 70.
- 136
1976 c. 57. Section 42 was amended by section 6(2) of, and the Schedule to, the Ports (Finance) Act 1985 (c. 30) and section 15 of the Food and Environment Protection Act 1985 (c. 48).
- 137
S.I. 2019/359.
- 138
Section 57 was amended by paragraphs 34 and 35 of Schedule 2 to the Planning Act 2008, paragraphs 1 and 3 of Schedule 2 to the Localism Act 2011 (c. 20) and paragraphs 2 and 4 of Part 2 of Schedule 4 to the Infrastructure Act 2015.
- 139
1967 c. 10. Relevant amendments to section 9 have been made by section 4 of, and Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11).
- 140
1990 c. 43. There are amendments to this subsection which are not relevant to this Order.
- 141
Section 82(2) was amended by section 5(2) of the Noise and Statutory Nuisance Act 1993 (c. 40) and section 107 of, and paragraph 6(b)(vi) of Schedule 17 to the Environment Act 1995 (c. 25). There are other amendments to section 82(2) which are not relevant to this Order.
- 142
1974 c. 40.
- 143
Section 61(9) was amended by section 162 of, and paragraph 15(1) and (3) of Schedule 15 to, the Environmental Protection Act 1990 (c. 43). There are other amendments to this subsection which are not relevant to this Order.
- 144
1978 c. 30.
- 145
2000 c. 37. Section 85 is amended by paragraph 165 of Schedule 11 to the National Environment and Rural Communities Act 2006 (c. 16) and section 246(6) of the Levelling-up and Regeneration Bill 2023 (c. 55). There are further amendments to section 85 that are not relevant to this Order.
- 146
Section 10 was amended by paragraph 13(2) of Schedule 2 to the Planning (Consequential Provisions) Act 1990 (c. 11) and by S.I. 2009/1307.
- 147
S.I. 2016/1154, amended by paragraph 446(1) of Schedule 24 to the Sentencing Act 2020 (c. 17), S.I. 2017/1012, S.I. 2018/110, S.I. 2018/428, S.I. 2018/575, S.I. 2018/721, S.I. 2018/1227, S.I. 2019/39, S.I. 2019/620, S.I. 2019/1078, S.I. 2020/904, S.I. 2020/1376, S.I. 2020/1540, S.I. 2021/77, S.I. 2022/500, S.I. 2023/149, S.I. 2023/651, S.I. 2023/816, S.I. 2023/1046, S.I. 2023/1156 and S.I. 2023/1289.
- 148
- 149
Section 16 was amended by section 42(4) of the Wales Act 2017 (c. 4), S.I. 2010/277, S.I. 2013/1479 and S.I. 2017/1012.
- 150
Section 22 was substituted by S.I. 2013/1883 and amended by section 1(6) of, and paragraph 153 of Schedule 1 to, the Infrastructure Act 2015 (c. 7).
- 151
Section 115 (2) was amended by section 106(1) and (3) of the Housing and Planning Act 2016.
- 152
1990 c. 43. Section 78A was inserted by section 57 of the Environment Act 1995 (c. 25) and amended by section 86(2) of the Water Act 2003 c. 37.
- 153
2000 c. 37. Section 85 is amended by paragraph 165 of Schedule 11 to the National Environment and Rural Communities Act 2006 (c. 16) and section 246(6) of the Levelling-up and Regeneration Bill 2023 (c. 55). There are further amendments to section 85 that are not relevant to this Order.
- 154
S.I. 2017/1012.
- 155
1981 c. 69.
- 156
- 157
S.I. 2015/596
- 158
1968 c. 52.
- 159
S.I. 2022/157, amended by S.I. 2023/289 and S.I. 2024/955.
- 160
2023 c. 55.
- 161
S.I. 2017/571.
- 162
S.I. 2017/572.
- 163
S.I. 2012/767.
- 164
1973 c. 26.
- 165
Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186(2), 187(2) and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.
- 166
Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016.
- 167
Section 11B was inserted by section 187(3) of the Housing and Planning Act 2016.
- 168
Section 12 was amended by section 56(2) of, and Part 1 of Schedule 9 to, the Courts Act 1971 (c. 23) and paragraph 4 of Schedule 16 to the Housing and Planning Act 2016.
- 169
Section 13 was amended by sections 62(3), 139(4) to (9) and 146 of, and paragraphs 27 and 28 of Schedule 13 and Part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
- 170
Section 20 was amended by paragraph 4 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34) and S.I. 2009/1307.
- 171
S.I. 2013/2249.
- 172
S.I. 2013/1783.
- 173
1979 c. 7.
- 174
1978 c. 30.
- 175
1989 c. 29. The definition of “electrical plant” was amended by section 108 of, and paragraphs 24 and 38(1) and (6) of Schedule 6 to, the Utilities Act 2000 (c. 27).
- 176
1986 c. 44. Section 7 was substituted by section 5 of the Gas Act 1995 (c. 45) and was further amended by section 76(2) of the Utilities Act 2000 (c. 27).
- 177
1991 c. 56.
- 178
Section 102(4) was amended by section 96(1)(c) of the Water Act 2003 (c. 37) and section 56 of, and paragraph 90 of Schedule 7 to the Water Act 2014 (c. 21).
- 179
Section 104 was amended by sections 96(4) and 101(2) of, and Part 3 of Schedule 9 to, the Water Act 2003, section 42(3) of the Flood and Water Management Act 2010 (c. 29) and section 11(1) and (2) of, and paragraphs 2 and 91 of Schedule 7 to the Water Act 2014.
- 180
2003 c. 21.
- 181
Section 106 was amended by section 4(3) to (9) of the Digital Economy Act 2017 (c. 30). See also Schedule 3A to the 2003 Act, which was inserted by section 4 of, and Schedule 1 to, the Digital Economy Act 2017.
- 182
1991 c. 59. Section 23 was amended by paragraph 32(3) of Schedule 22 to the Environment Act 1995 (c.25) and paragraph 32 of Schedule 2 to the Flood and Water Management Act 2010 (c. 29).
- 183
2006 c. 46.
- 184
1993 c. 43. Section 8 was amended by section 216 of, and Part 1 of Schedule 2, paragraph 4 of Schedule 17 and Part 4 of Schedule 31 to, the Transport Act 2000 (c. 20), by sections 1 and 60 of, and paragraph 2 of Schedule 1 and Part 1 of Schedule 13 to, the Railways Act 2005 (c. 38), and by S.I. 2015/1682.
- 185
1986 c. 44.
- 186
Section 7 was substituted by section 5 of the Gas Act 1995 (c. 45) and the term “gas transporter” was substituted by section 76(2) of the Utilities Act 2000 (c. 27).
- 187
1991 c. 57. The definition of “main river” was amended by section 59(3) of the Water Act 2014 (c. 21).
- 188
1949 c. 72.
- 189
S.I. 2021/1195.
- 190
S.I. 2015/596.
- 191
1990 c. 8.
- 192
S.I. 2019/359.
- 193
S.I. 2019/359.
- 194
S.I. 2016/1154.
- 195
2009 c. 23.
- 196
1981 c. 69.
- 197
S.I. 2017/1012.
- 198
1981 c. 19.