Channel Tunnel Rail Link Act 1996
1996 c. 61An Act to provide for the construction, maintenance and operation of a railway between St. Pancras, in London, and the Channel Tunnel portal at Castle Hill, Folkestone, in Kent, together with associated works, and of works which can be carried out in conjunction therewith; to make provision about related works; to provide for the improvement of the A2 at Cobham, in Kent, and of the M2 between junctions 1 and 4, together with associated works; to make provision with respect to compensation in relation to the acquisition of blighted land; and for connected purposes.
Enacted[18th December 1996]
Part I The Channel Tunnel Rail Link¶
Works¶
C41 Construction and maintenance of scheduled works.¶
2 Further and supplementary provisions.¶
Schedule 2 to this Act (which contains further and supplementary provisions about works) shall have effect.3 Highways.¶
Schedule 3 to this Act (which makes provision in relation to highways in connection with the works authorised by this Part of this Act) shall have effect.Land¶
4 Acquisition within limits shown on deposited plans.¶
5 Acquisition outside limits shown on deposited plans.¶
- “apparatus” includes a sewer, drain or tunnel and any structure for the lodging therein of apparatus or for gaining access to apparatus;
- “common” includes any land subject to be enclosed under the Inclosure Acts 1845 to 1882, and any town or village green;
- “fuel or field garden allotment” means any allotment set out as a fuel allotment, or a field garden allotment, under an Inclosure Act;
- “open space” means any land laid out as a public garden, or used for the purposes of public recreation, or land which is a disused burial ground; and
- “the relevant limits” means the limits of deviation for the scheduled works and the limits of land to be acquired or used.
6 Temporary possession and use.¶
Schedule 5 to this Act (which contains provisions about temporary possession and use of land for the purposes of this Part of this Act) shall have effect.C57 Extinguishment of private rights of way.¶
C68 Extinguishment of rights of statutory undertakers etc.¶
Planning and heritage¶
9 Planning: general.¶
10 Permitted development: time limits.¶
11 Fees for planning applications.¶
- F3. . .
- “prescribed” means prescribed in regulations under subsection (1) above; and
- “relevant planning application” means a request for approval under the planning permission deemed by section 9(1) above to be granted.
12 Heritage.¶
Schedule 7 to this Act (which makes provision for the disapplication or modification, in relation to authorised works, of controls relating to listed buildings, buildings in conservation areas and ancient monuments etc.) shall have effect.13 Heritage: rights of entry.¶
Schedule 8 to this Act (which makes provision about rights of entry for the Historic Buildings and Monuments Commission for England and the Royal Commission on the Historical Monuments of England) shall have effect.Operation¶
C814 Operation and use of authorised works.¶
15 Bye-laws.¶
For the purposes of section 129 of the Railways Act 1993 (power of independent railway operator to make bye-laws), the nominated undertaker shall be treated as an independent railway operator.Application of railway legislation¶
C916 Licensing.¶
C1017 Access agreements.¶
- “access contract”, “network installation” and “railway facility” have the same meanings as in Part I of the M10Railways Act 1993; and
- “rail link facility” means a railway facility which is used wholly or partly for the purposes of or in connection with the provision of services for the carriage of passengers or goods on the rail link.
C1118 Closures.¶
The following provisions of the Railways Act 1993—- section 38 (proposals to discontinue franchised etc. passenger services), and
- section 48(3) (duties in relation to discontinuation of certain experimental passenger services),
C1219 Railway administration orders.¶
, and
- “operator”, in relation to a railway asset, means the person having the management of that railway asset for the time being;
- “passenger licence” and “railway asset” have the same meanings as in Part I of the 1993 Act;
- “rail link service operator” means a person who, under section 34 below, is the nominated undertaker for any purpose of section 14(1)(b) above, so far as relating to the rail link;
- “the 1986 Act” means the M11Insolvency Act 1986; and
- “the 1993 Act” means the M12Railways Act 1993.
20 Other legislation.¶
Schedule 9 to this Act (which makes provision with respect to the incorporation of the Railways Clauses Acts and the application of miscellaneous other enactments relating to railways) shall have effect.Functions of the Office of Rail and Road¶
C1321 Duties as to exercise of regulatory functions.¶
21A Fees¶
F82C1422 Restriction of functions in relation to competition etc.¶
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Competition¶
F623 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .¶
F6324 Monopoly situations.¶
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F725 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .¶
F6426 Sections 23 to 25: supplementary provisions.¶
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Trees¶
C1527 Power to deal with trees on neighbouring land.¶
C1628 Disapplication of controls.¶
Noise¶
C1729 Control of construction sites: appeals.¶
C1930 Proceedings in respect of statutory nuisance: defence.¶
Financial matters¶
C6931 Expenditure in connection with securing construction of works.¶
C6932 Reserved capacity on the rail link: expenditure.¶
C6933 Undertakings with respect to financial assistance etc.¶
Miscellaneous and general¶
C2034 Holder of functions of nominated undertaker.¶
35 Transfer of functions relating to works.¶
36 Compensation for injurious affection.¶
Section 10(1) of the M17Compulsory Purchase Act 1965 (compensation for injurious affection) shall have effect, in relation to land injuriously affected by the execution of works under this Part of this Act, with the substitution for “acquiring authority have” of “ nominated undertaker has ”.C2137 Duty to co-operate.¶
- “light maintenance depot”, “network”, “railway asset” and “station” have the same meanings as in Part I of the Railways Act 1993; and
- “operator”, in relation to a railway asset, means the person having the management of the asset for the time being.
38 Disapplication and modification of miscellaneous controls.¶
Schedule 10 to this Act (which makes provision for the disapplication and modification of miscellaneous statutory and other controls in relation to things done under this Part of this Act and otherwise for the purposes of this Part of this Act) shall have effect.C2239 Burial grounds.¶
- “enactment” includes an enactment in any local or private Act of Parliament, and an order, rule, regulation, byelaw or scheme made under an Act of Parliament; and
- “monument” includes a tombstone or other memorial;
C2340 Application of landlord and tenant law.¶
41 Variation of development agreement: disapplication of s.2 of Law of Property (Miscellaneous Provisions) Act 1989.¶
F12642 Related works: application of section 9 of the Transport and Works Act 1992.¶
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F1042A Strategic Rail Authority as agent of Secretary of State.¶
C2443 Arbitration.¶
Part II The A2 and M2 Improvement Works¶
44 Authorised works.¶
45 Acquisition of land.¶
46 Blight: compensation for pre-enactment acquisition.¶
Part III Miscellaneous and General¶
47 Time limit for powers of compulsory acquisition.¶
48 Power to acquire land by reference to combined effect of works.¶
- “qualifying interest” has the meaning given in section 149(2) of the M31Town and Country Planning Act 1990, taking references to the relevant date as references to the date on which the purchase agreement is made; and
- “rail link works” means the scheduled works, so far as relating to the rail link.
49 Noise insulation regulations: procedure.¶
Section 20 of the M32Land Compensation Act 1973 (sound-proofing of buildings affected by public works) shall have effect, in relation to regulations under that section which relate only to noise caused or expected to be caused by the construction or use of works authorised by this Act, with the substitution for subsection (9) of—C2550 Overhead lines.¶
51 Replacement concrete batching facilities at St. Pancras.¶
52 Protection of interests.¶
53 Correction of deposited plans.¶
C2654 Service of documents.¶
55 Financial provision.¶
There shall be paid out of money provided by Parliament any expenditure of the Secretary of State under this Act.56 Interpretation.¶
- “A2 and M2 improvement works” has the meaning given by section 44(1) above;
- “bridleway”, “carriageway”, “cycle track”, “footpath”, “footway”, “highway”, “highway authority” and “local highway authority” have the same meanings as in the M39Highways Act 1980;
- “burial ground” means a churchyard, cemetery or other ground, whether consecrated or not, which has at any time been set apart for the purposes of interment;
- “deposited plans” and “deposited sections” mean respectively the following plans and sections deposited in connection with the Channel Tunnel Rail Link Bill in the office of the Clerk of the Parliaments and the Private Bill Office of the House of Commons, namely—
- the plans and sections shown on Sheets Nos. 1 to 6 and 9 to 24 of the plans and sections deposited in November 1995 in connection with the Barking Extended Tunnel,
- the plans and sections deposited in November 1995 otherwise than in connection with the Barking Extended Tunnel,
- the plans and sections deposited in December 1995, and
- the plans and sections deposited in November 1994, so far as not superseded by the plans and sections mentioned in paragraphs (a) to (c) above;
- “development agreement” means an agreement (including one entered into before the passing of this Act) to which the Secretary of State is a party and under which another party has responsibilities in relation to the design, construction, financing , maintenance or operation of the rail link;
- “limits of deviation” means the limits of deviation which are shown on the deposited plans;
- “limits of land to be acquired or used” means the limits of land to be acquired or used which are shown on the deposited plans;
- “owner” has the same meaning as in the M40Acquisition of Land Act 1981;
- “rail link” means—
- the railway between St. Pancras, in London, and the Channel Tunnel portal at Castle Hill, Folkestone, in Kent, authorised to be constructed by section 1(1) above, together with its associated works, facilities and installations, and
- the railway comprised in Works Nos. 11, 11A and 11B (which connects the railway mentioned in paragraph (a) above with the Chatham to Victoria Line), together with its associated works, facilities and installations;
- “rail link undertaker” means a person who, under section 34 above, is the nominated undertaker for any purpose of section 1(1) or 14(1) above, so far as relating to the rail link;
- “scheduled works” has the meaning given by section 1(1) above; and
- “scheduled works agreement” means an agreement relating to the design, construction, financing, maintenance or operation of any of the scheduled works.
57 Short title.¶
This Act may be cited as the Channel Tunnel Rail Link Act 1996.SCHEDULES
SCHEDULE 1 ¶
Scheduled Works
Section 1.
Description of works¶
Work No St. Pancras to Highbury Corner¶
Railways between St. Pancras and Highbury Corner and related works comprising the following railways, including a station terminus at St Pancras for international and domestic services and the provision of facilities in connection therewith—Work No International High Speed Railway¶
A railway (741 metres in length) commencing in the intended St. Pancras Station, passing north-westwards over the new road (Work No. 5D), then northwards over the realigned Camley Street (Work No. 5A) and terminating at a point 33 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;Work No Domestic Railway¶
A railway (533 metres in length) commencing in the intended St. Pancras Station at a point 15 metres north-west of the existing junction of Clarence Passage with Pancras Road, passing north-westwards on the eastern side of the existing Midland Main Line, over the new road (Work No. 5D) and the realigned Camley Street (Work No. 5A), and terminating at a point 25 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;Work No Thameslink, St. Pancras and King’s Cross¶
A railway (876 metres in length), including a station tunnel on the Midland City Line (Thameslink) beneath St. Pancras Station, commencing by a junction with that railway in tunnel at a point beneath Midland Road 145 metres north-east of the existing junction of that road with Euston Road, passing in tunnel north-westwards and northwards beneath the Regent’s Canal and terminating by a junction with that railway in tunnel at a point beneath the existing Midland Main Line 55 metres north of the northern abutment of the bridge carrying that last-mentioned railway over that canal;Work No Midland Main Line¶
A railway (645 metres in length), forming a diversion of the Midland Main Line at St. Pancras Station, commencing at its terminus in that station, passing north-westwards on the western side of the existing railway, including a western extension of the station over Midland Road and Pancras Road, then northwards over the new road (Work No. 5D) and the realigned Camley Street (Work No. 5A) and terminating at a point on the northern side of Work No. 5A 140 metres south of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;Work No London Underground: ticket halls and subways¶
Ticket halls and subways, including alteration of existing ticket halls and subways, of the London Underground Railways comprising—Work No Associated Works¶
Roadworks and sewer diversions associated with Works Nos. 1 to 4 comprising—Work No Roadworks¶
Realignment of Camley Street commencing at a point in that road 50 metres south of its junction with Granary Street, passing south-eastwards then eastwards under the railways (Works Nos. 1A to 1D and 3), then south-eastwards and terminating by a junction with Camley Street (Work No. 5C) at a point on the western side of that road 44 metres north-west of its existing junction with Goods Way;Work No Sewer diversions¶
A sewer, forming a diversion of part of the Fleet Sewer, commencing by a junction with that sewer beneath a point in Pancras Road 35 metres south-east of the junction of Chenies Place with that street, passing along the line of Work No. 5B to its junction with Brill Place, then passing eastwards beneath the intended St. Pancras Station, then southwards on the eastern side of that station and terminating beneath a point in Pancras Road 5 metres north of the existing junction of Wellers Court with that road, including a weir chamber at its junction with the Fleet Storm Relief Sewer;Work No Highbury Corner to Stratford¶
A railway (7,229 metres in length) commencing by a junction with the railways (Works Nos. 1AA and 1BB) at their termination, passing eastwards in tunnel beneath the North London Line, or land adjoining on the northern or southern side thereof, beneath Highbury Corner, Highbury Grove, Wallace Road, Mildmay Park, King Henry’s Walk, Kingsland High Street, Dalston Lane, the Liverpool Street and Cambridge Railway, Mare Street, Barnabas Road, Kenworthy Road, the East Cross Route on the northern side of the North London Line, Eastway, the River Lea Navigation, Waterden Road and the River Lea, including ventilation shafts on lands off Corsica Street and Graham Road, then in retained cutting from chainage 6,147 metres for a distance of 1,067 metres, partly in tunnel beneath the railways (Works Nos. 6B and 6C) and the access roads (Works Nos. 6H and 6J), in land west of the High Meads Loop Railway, in the International Freight Terminal and the site of the former Chobham Farm Container Depot at Stratford, and terminating beneath a point on the western side of Angel Lane 60 metres north of the northern abutment of the bridge carrying that road over the Great Eastern Railway, including facilities for a railway crossover and junction at the International Freight Terminal and Depot at Stratford;Work No Stratford to Barrington Road¶
A railway (4,560 metres in length) commencing by a junction with the railway (Work No. 6) at its termination, passing eastwards in tunnel beneath Angel Lane, The Grove, Atherton Road, Woodgrange Road, Romford Road, Woodgrange Park Cemetery and Browning Road, including a ventilation shaft on land off Woodgrange Road and terminating beneath a point 60 metres east of the junction of Reesland Close with Barrington Road;Work No Barrington Road to Dagenham Dock¶
A railway (6,700 metres in length) commencing by a junction with the railway (Work No. 7) at its termination, passing eastwards in tunnel beneath the North Circular Road and the River Roding, then south-eastwards beneath Barking Station, Station Parade, Ripple Road and Alfred’s Way, then eastwards beneath Renwick Road and the Ripple Lane Freightliner Terminal to a portal at a point 462 metres south-east of the junction of Morrison Road with Julia Gardens, then continuing eastwards under the railway (Work No. 22A) and the new road (Work No. 22H(1)), across Chequers Lane (to be stopped up) and under Kent Avenue and terminating at a point 85 metres east of the bridge carrying Kent Avenue over the Tilbury Loop Railway, including ventilation shafts on lands off Barrington Road and Alfred’s Way and a footbridge over the railway at Chequers Lane;Work No Dagenham Dock to Wennington¶
A railway (5,200 metres in length) commencing by a junction with the railway (Work No. 22) at its termination, passing eastwards under Thames Avenue (Work No. 8R), over the Beam River, and under the intended A13 link road (under construction), then continuing south-eastwards on viaduct over the new road (Work No. 8S) and Rainham Creek, and terminating beneath the intended A13 (under construction) at a point 20 metres south-west of the Tilbury Loop Railway;Work No Wennington to Purfleet¶
A railway (3,835 metres in length) commencing by a junction with the railway (Work No. 8) at its termination, passing south-eastwards on the southern side of the realigned Tilbury Loop Railway (Work No. 23A) then on viaduct over that railway, then over the diverted Aveley Sewer (Work No. 23D) and under the new road (Work No. 23B(1)), then continuing over Mar Dyke and under the new road (Work No. 23C(2)), passing on the southern side of the Purfleet Bypass and terminating at a point 250 metres east of the junction of London Road, Purfleet with the Purfleet Bypass, including the said viaduct and a bridge over Mar Dyke;Work No Purfleet to West Thurrock¶
A railway (1,537 metres in length) commencing by a junction with the railway (Work No. 23) at its termination, passing south-eastwards on viaduct over the A1090 (London Road, Purfleet), the Tilbury Loop Railway and the northbound Dartford Tunnel Approach Road (Canterbury Way), under a span of the southbound approach to the Queen Elizabeth II Bridge, and over Oliver Close (North) (Work No. 9B) in the West Thurrock Industrial Estate to a point 90 metres west of the existing southernmost junction of Oliver Close with Oliver Road, then under Oliver Road (Work No. 9C) and terminating at a point 160 metres south-east of that existing road junction, including the said viaducts and a bridge over Work No. 9A(1);Work No West Thurrock and Ebbsfleet to Singlewell¶
A railway (9,161 metres in length) commencing by a junction with the railway (Work No. 9) at its termination, passing south-eastwards to a point 249 metres from that commencement, then passing in tunnel beneath Burnley Road and Watson Close (Work No. 9D), then beneath the River Thames and Bell Wharf, Swanscombe, with shafts at Burnley Road, West Thurrock Power Station, Bell Wharf and Swanscombe Marsh, continuing in tunnel south-eastwards to a point 120 metres north-west of the existing junction of Green Manor Way with Lower Road, then passing south-eastwards and southwards, under Galley Hill Road (Work No. 10K), then in tunnel for a distance of 58 metres beneath the North Kent Railway, continuing under the railway (Work No. 10C) and the new road (Work No. 10S(1)), then on viaduct over the River Ebbsfleet, then in tunnel for a distance of 310 metres beneath the course of the former Gravesend West Branch Railway and the A2 (Watling Street) at a point 50 metres west of the southern abutment of the bridge carrying the B262 (Hall Road) over that road, then passing in tunnel for distances of 35 metres and 25 metres respectively beneath the B262 and the slip road to that road and Station Road on the southern side of the A2, then continuing south-eastwards on the southern side of the A2, then in tunnel for a distance of 80 metres beneath the railway (Work No. 11A) and on viaduct over the A227 (Wrotham Road) and terminating at a point 180 metres east of that road 340 metres south of the southern side of the bridge carrying the A2 over that road, including the said viaducts over the River Ebbsfleet and Wrotham Road;Work No Longfield to Singlewell¶
A railway (4,402 metres in length) commencing by a junction with the London and Chatham Railway at a point 130 metres east of the eastern abutment of the bridge carrying that railway over Pinden Road, passing eastwards, then north-eastwards on the course of the former Gravesend West Branch Railway, over the B260 (Main Road, Longfield), under Whitehill Road (Work No. 11C), the B255 (Hook Green Road) (Work No. 11D) and the B259 (Dale Road) (Work No. 11E), then eastwards under New Barn Road (Work No. 11F), and terminating at a point 60 metres east of the intended bridge forming part of that work, including a bridge over the B260;Work No Singlewell to Strood¶
A railway (7,700 metres in length) commencing by a junction with the railway (Work No. 10) at its termination, passing eastwards on the southern side of the A2 (Watling Street), under Henhurst Road (Work No. 12D), Scotland Lane (Work No. 12E), Watling Street (B395) (Work No. 12F) and Halfpence Lane (C492) (Work No. 32C), then in tunnel for a distance of 75 metres beneath Work No. 32B and an adjoining area, under Brewers Road (Work No. 12H), over the access road (Work No. 12K) and under the access road (Work No. 12L), then passing south-eastwards on the western side of the M2, under a land bridge in Temple Wood, and terminating at a point 435 metres north-west of the southern end of the subway by which the footpath RS203 passes under the M2 as existing, including a bridge over Work No. 12K;Work No Strood to Detling¶
A railway (14,100 metres in length) commencing by a junction with the railway (Work No. 12) at its termination, passing south-eastwards, on the western side of the M2, over new roads (Works Nos. 36C, 36D and 36E) forming part of Junction 2 of the motorway, under the A228 (Rochester Road) (Work No. 36F), over the London and Chatham Railway, then on viaduct over the Strood and Maidstone Railway, the River Medway and Wouldham Road, then continuing south-eastwards on the western side of the M2 to a point at Nashenden Bottom, 120 metres north-west of the northern end of the go-kart racing track at Buckmore Park, south of Rochester Airport, then passing in tunnel (the North Downs Tunnel) for a distance of 3,190 metres beneath Blue Bell Hill and the North Downs, then passing south-eastwards under the Pilgrims Way (Work No. 13F), over Boarley Lane (Work No. 13G), then in tunnel for a distance of 330 metres beneath Boxley Road (Work No. 13H), continuing south-eastwards, under the A249 (Sittingbourne Road) (Work No. 13J), and Hockers Lane (Work No. 13K) and terminating at a point 270 metres east of the northern abutment of the bridge carrying Hockers Lane over the M20, including bridges over Works Nos. 36C, 36D and 36E, the London and Chatham Railway, the said viaduct, and a bridge over Work No. 13G;Work No Detling to Lenham Heath¶
A railway (13,904 metres in length) commencing by a junction with the railway (Work No. 13) at its termination, passing south-eastwards over Thurnham Lane (Work No. 14A), Water Lane (Work No. 14B) and Crismill Lane (Work No. 14C), then over the Maidstone and Ashford Railway at a point 85 metres east of the bridge carrying the M20 over that railway, continuing south-eastwards in tunnel for a distance of 240 metres beneath the B2163 (Eyhorne Street) (Work No. 14D), then passing over Snagbrook Stream, under Hospital Road (Work No. 14E), over the A20 (Ashford Road) (Work No. 14F) and under Fairbourne Lane (Work No. 14H), over Bell Farm access (Work No. 14J), then under Runham Lane (Work No. 14K), Sandway Road (Work No. 14L), Old Ham Lane (Work No. 14M), in tunnel for a distance of 170 metres beneath Headcorn Road (Work No. 14N), then continuing under Boughton Road (Work No. 14P), Lenham Heath Road (Work No. 14Q) and Bowley Lane (Work No. 14S), over the Great Stour River at a point 40 metres north of the bridge carrying the M20 over that river, under the access road west of Hook Street (Work No. 14U) and terminating at a point 85 metres south of the junction of Bull Hill with Lenham Heath Road, including bridges over Works Nos. 14A, 14B and 14C, the Maidstone and Ashford Railway, Snagbrook Stream, Works Nos. 14F and 14J and the Great Stour River;Work No Lenham Heath to Ashford Barracks¶
A railway (11,342 metres in length) commencing by a junction with the railway (Work No. 14) at its termination, passing south-eastwards under Egerton Road (Work No. 15C), Newlands Road (Work No. 15F) and Pluckley Road (Work No. 15G), passing eastwards in tunnel for a distance of 115 metres beneath Leacon Lane (Work No. 15J), and under the A20 (Maidstone Road) (Work No. 15K) then continuing south-eastwards over the M20 at a point 50 metres west of the bridge carrying the Maidstone and Ashford Railway over the motorway at Tutt Hill, passing under Westwell Lane (Work No. 15M) and over Station Road (Work No. 15N), under the A20 (Work No. 15P) and over Godinton Lane (Work No. 15Q) and terminating at a point in Rowcroft Barracks 530 metres north-west of the existing junction of Godinton Road with Chart Road, including bridges over the M20, Station Road and Godinton Lane;Work No Ashford Barracks to Sevington¶
A railway (4,535 metres in length) commencing by a junction with the railway (Work No. 15) at its termination, passing south-eastwards to a point 130 metres north-west of the existing junction of Godinton Road with Chart Road, then in tunnel for a distance of 565 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), the railway (Work No. 16A) and the Maidstone and Ashford Railway (Work No. 16C), then under Beaver Road (Work No. 16N), over the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway and the railways (Works Nos. 16C and 16D), then over the railways (Works Nos. 16A and 16E), under Boys Hall Road (Work No. 16Q), and terminating at a point 225 metres west of the western side of the existing bridge carrying Bad Munstereifel Road over the Ashford and Folkestone Railway at Sevington, including bridges over Works Nos. 16A, 16C, 16D and 16E, the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway, and the Aylesford Stream (Work No. 16S);Work No Saltwood to Folkestone¶
A railway (3,476 metres in length) commencing by a junction with the railway (Work No. 17) at its termination, passing eastwards under Sandling Road (Work No. 18H) on the northern side of the Ashford and Folkestone Railway and the northern side of the Dollands Moor Freight Yard, then under the roundabout (part of Work No. 18J) and terminating at a point on the western side of the M20 at Newington 215 metres south-west of the junction of Newington Road with the A20;Work No White City Sidings¶
A railway (1,050 metres in length), forming a diversion of the northbound track of the West London Line between North Pole Junction and Kensington Olympia, commencing by a junction with that railway at a point 25 metres south-east of the bridge over that railway beneath Westway west of the junction of that road with West Cross Route, passing south-eastwards on the western side of that railway under the bridge carrying the Hammersmith and City Line of the London Underground over that railway and terminating by a junction with the West London Line at a point 170 metres north of the northern portal of the tunnel in which that railway passes beneath the junction of West Cross Route with Holland Park Avenue, Shepherds Bush Green and the Uxbridge Road;Work No Hoo Sidings¶
A railway (1,111 metres in length), forming sidings of the Gravesend and Higham Railway at Hoo Junction, commencing by a junction with that railway on the eastern side of the Queens Farm Road level crossing on that railway, passing eastwards on the northern side of that railway, then north-eastwards on the southern side of the Grain Branch of that railway and terminating at a point 120 metres south of the south-western abutment of the bridge carrying that railway over the former Thames and Medway Canal;Work No Richborough Sidings¶
A railway (1,139 metres in length), forming sidings at the Richborough Power Station at Stonelees, commencing by a junction with the Margate and Dover Railway at a point 530 metres north-west of the north-western abutment of the bridge carrying that railway over the River Stour, passing south-eastwards and terminating at a point 470 metres west of the north-western end of the culvert carrying the A256 (Ramsgate Road) over Minster Stream, including railway sidings.Interpretation¶
- references to the Tilbury Loop Railway are references to the Tilbury Line of the London Tilbury and Southend Railway;
- references to the M2 and the M20 are references to the special roads so designated;
- references to the A13 and the A20 are references to the trunk roads so designated and references to the intended A13 are to a new road to be constructed in substitution for part of the A13; and
“westbound” in any description of the direction of road or railway traffic signifies travel in the direction of London, whether or not London is the destination, and “eastbound” signifies travel in the opposite direction.
SCHEDULE 2 ¶
Works: Further and Supplementary Provisions
Section 2.
Subsidiary works¶
Highway accesses¶
Overhead line diversions¶
| (1) | (2) | (3) |
|---|---|---|
| Area | Overhead line to be taken down | New overhead line to be provided |
| GREATER LONDON | ||
| London Borough of Barking and Dagenham | Barking corridor 275kV overhead electric cable (ZBA) between points EC106, EC107 and EC108 | New overhead electric cable to be provided on land within the relevant limits between points EC106, EC109 and EC108 or thereabouts. |
| London Borough of Barking and Dagenham and London Borough of Havering | Barking corridor 275kV overhead electric cable (ZBA) between points EC87, EC88, EC89, EC1, EC2, EC3, EC4, EC5, EC6, EC7, EC8, EC9, EC10, EC11 and EC12 | New overhead electric cable to be provided on land within the relevant limits between points EC87, EC90, EC91, EC13, EC92, EC93, EC94, EC95, EC18, EC19, EC20, EC21, EC22 and EC12 or thereabouts. |
| London Borough of Havering | Havering overhead electric cable (ZBA) between points EC23, EC24 and EC25 | New overhead electric cable to be provided on land within the relevant limits between points EC23, EC26 and EC25 or thereabouts. |
| COUNTY OF ESSEX | ||
| Borough of Thurrock | Purfleet Road 400kV overhead electric cable (ZR) between points EC103, EC27, EC28, EC29 and EC30 | New overhead electric cable to be provided on land within the points EC103, EC27, EC28, EC29 and EC30 relevant limits between points EC103, EC104, EC28, EC105 and EC30 or thereabouts. |
| Aveley 275kV overhead electric cable (ZBA) between points EC96, EC97, EC98 and EC99 | New overhead electric cable to be provided on land within the relevant limits between points EC96, EC100, EC101, EC102 and EC99 or thereabouts. | |
| COUNTY OF KENT | ||
| Borough of Dartford, Parish of Swanscombe and Greenhithe | Dartford 132kV overhead electric cable (south) (PK) between points EC48, EC49 and EC50 | New overhead electric cable to be provided on land within the relevant limits between points EC48, EC51, EC52 and EC50 or thereabouts. |
| Borough of Dartford, Parish of Swanscombe and Greenhithe and Borough of Gravesham, Town of Gravesend | Dartford 132kV overhead electric cable (north) (PJ) between points EC40, EC41, EC42, EC43 and EC44 | New overhead electric cable to be provided on land within the relevant limits between points EC40, EC45, EC42, EC46, EC47 and EC44 or thereabouts. |
| Borough of Dartford, Parish of Southfleet and Borough of Gravesham, Town of Gravesend | Dartford 400kV overhead electric cable (4TP) between points EC53, EC54, EC55 and EC56 | New overhead electric cable to be provided on land within the relevant limits between points EC53, EC57, EC58 and EC56 or thereabouts. |
| Borough of Gravesham, Town of Gravesend and Borough of Dartford, Parish of Swanscombe and Greenhithe | Gravesend 400kV overhead electric cable (ZR) between points EC33, EC34, EC35 and EC36 | New overhead electric cable to be provided on land within the relevant limits between points EC33, EC37, EC38, EC39 and EC36 or thereabouts. |
| Borough of Gravesham, Town of Gravesend | Pepper Hill 400kV overhead electric cable (YN) between points EC59, EC60, EC61 and EC62 | New overhead electric cable to be provided on land within the relevant limits between points EC59, EC63, EC64, EC65 and EC62 or thereabouts. |
| Borough of Gravesham, Parish of Shorne | Singlewell 400kV overhead electric cable (4YN) between points EC66, EC67 and EC68 | New overhead electric cable to be provided on land within the relevant limits between points EC66, EC69 and EC68 or thereabouts. |
| Borough of Maidstone, Parish of Boxley | Pilgrims Way 400kV overhead electric cable (TP) between points EC70, EC71 and EC72 | New overhead electric cable to be provided on land within the relevant limits between points EC70, EC73, EC74 and EC72 or thereabouts. |
| Boxley 132kV overhead electric cable (PN) between points EC75, EC76, EC77 and EC78 | New overhead electric cable to be provided on land within the relevant limits between points EC75, EC76, EC79 and EC78 or thereabouts. | |
| Borough of Ashford, Parish of Aldington | Sellindge 400kV overhead electric cable (VO) between points EC80 and EC81 | New overhead electric cable to be provided on land within the relevant limits between points EC80, EC82 and EC81 or thereabouts. |
| District of Shepway, Parish of Sellindge | Sellindge East 132kV overhead electric cable (PV) between points EC83, EC84 and EC85 | New overhead electric cable to be provided on land within the relevant limits between points EC83, EC86 and EC85 or thereabouts. |
Mitigation and protection works¶
Euston Road and York Way improvement works¶
Underpinning of buildings¶
- “building” includes any structure and, in the case of a work under the surface of the ground, reference to a building within the relevant distance of that work includes a reference to any building within the relevant distance of any point on the surface below which the work is situated,
- “notice” means notice in writing, and
- “relevant distance”, in relation to any work, means—
- where the work relates to an underground railway, 50 metres, and
- where it does not, 35 metres.
Discharge of water¶
Entry for preparatory purposes¶
Temporary interference with waterways¶
SCHEDULE 3 ¶
Highways
Section 3.
Stopping up: non-level crossings¶
| (1) | (2) |
|---|---|
| Area | Highway or part to be stopped up |
| GREATER LONDON | |
| London Borough of Camden | Battlebridge Road between points E3 and E4 Wellers Court between points F1 and F2 Clarence Passage between points G1 and G2 Stanley Passage between points H1 and H2 |
| London Borough of Barking and Dagenham | Footpath 47 between points M4 and M5 |
| COUNTY OF ESSEX | |
| Borough of Thurrock | Oliver Close between points F4 and F5 |
| COUNTY OF KENT | |
| Borough of Dartford, Parishes of Swanscombe and Greenhithe and Southfleet | Access road adjoining A2 between points D6, D7 and D8 |
| Borough of Gravesham, Town of Gravesend | Footpath NU15 between points D3 and D4 |
| Borough of Gravesham, Parish of Cobham | Old Watling Street (B395) between points K1 and K2 |
| City of Rochester upon Medway, Parish of Cuxton | Footpath RS 205 between points D1 and D2 Footpath RR 27 between points D2 and D3 |
| Borough of Maidstone, Parish of Hollingbourne | Musket Lane between points A4 and A3 |
| Borough of Maidstone, Parish of Harrietsham | Footpath KH275 between points E5 and E3 |
| Borough of Ashford, Parish of Charing | Footpath AW47 between points K1 and K2 |
| Borough of Ashford, Town of Ashford | Gasworks Lane (D4543) between points E1 and E2 |
| Borough of Ashford, Parish of Mersham | Footpath AE 386 between points C10 and C11 |
| Borough of Ashford, Parish of Smeeth | Footpath AE 434 between points C3 and C2 |
| District of Shepway, Parishes of Saltwood and Stanford | Footpath HE 346 between points A2 and A5 Stone Street between points B1 and B2 |
| District of Shepway, Parish of Saltwood | Footpath HE 279 between points C9 and C10 Sandy Lane (D1752) between points C11 and C8 |
| (1) | (2) | (3) |
|---|---|---|
| Area | Highway or part to be stopped up | New highway to be substituted for it |
| GREATER LONDON | ||
| London Borough of Camden | Midland Road between points B1 and B2 | Work No. 5B |
| Pancras Road between points C1, B2 and C2 | Works Nos. 5B, 5C and 5D | |
| Taxi Road between points D1, D2 and D3 | Works Nos. 5F and 5F(1) | |
| Cheney Road between points E1, E2 and E3 | Work No. 5C | |
| Goods Way between points K1 and K5 | Work No. 5D | |
| Camley Street between points K4 and K6 | Works Nos. 5A and 5C | |
| York Way between points L1 and L2 | Work No. 5Q | |
| London Borough of Islington | Randell’s Road between points A1 and A2 | Work No. 5Q(1) |
| London Borough of Barking and Dagenham | Pooles Lane between points M1 and M2 | Work No. 22H(1) between its commencement and its junction with Work No. 22H(2), and Work No. 22H(2) |
| Choats Manor Way between points M3 and M4 | Work No. 22H(1) between its commencement and its junction with Work No. 8P(3) | |
| Choats Road between points L1 and L2 | Work No. 8P(3) | |
| Hindmans Way between points L2 and L3 | Work No. 8P(3) | |
| Chequers Lane between points L4 and L5 | Works Nos. 8P(3) and 8P(4) | |
| Kent Avenue between points J1 and J2 | Work No. 8Q | |
| Thames Avenue between points K1 and K2 | Work No. 8R | |
| London Borough of Havering | Creekside between points C1 and C2 | Works Nos. 8S and 8T |
| Lamson Road between points D1 and D3 | Work No. 8S | |
| COUNTY OF ESSEX | ||
| Borough of Thurrock | Footpath FP145 between points L1 and L2 | New footpath between points L1, L3, L4, L5, L6, L7 and L2 |
| Arterial Road, Purfleet between points M1 and M2 | Work No. 23C(1) | |
| Purfleet Bypass between points M3 and M4 | Work No. 23C(3) | |
| Tank Lane between points M5 and M6 | Work No. 23C(5) and Work No. 23C(4) between point M5 and its termination | |
| Botany Way between points M8 and M9 | Works Nos. 23C(2), 23C(3) and 23C(5) | |
| Footpath 167 between points N1 and N2 | New footpath between points N1, N3 and N2 | |
| Oliver Close (North) between points F1, F2 and F3 | Work No. 9B | |
| Oliver Road between points G1 and G2 | Work No. 9C | |
| Burnley Road and Watson Close between points H1, H2 and H3 | Work No. 9D | |
| A1090 (Tank Hill Road) between points J8 and J2 | Work No. 23B(1) and new footpath between points J8 and J9 | |
| Access road to Purfleet Industrial Park between points J5 and J6 | Work No. 23B(1) between its commencement and its junction with Work No. 23B(2), and Work No. 23B(2) | |
| COUNTY OF KENT | ||
| Borough of Dartford, Parish of Swanscombe and Greenhithe | Green Manor Way between points B1 and B2 | Works Nos. 10J and 10J(1) |
| Footpath DS17 between points D1 and D2 | New footpath between points D1, D3 and D2 | |
| Borough of Dartford, Parish of Swanscombe and Greenhithe and Borough of Gravesham, Town of Gravesend | Lower Road between points B3 and B4 | Work No. 10J |
| Borough of Dartford, Parishes of Swanscombe and Greenhithe and Southfleet | Park Corner Road and Southfleet Road (B259) between points E1, E2 and E3 | Works Nos. 10S(2) and 10(T)(6) to 10T(8) |
| Access road between points F1 and F2 | Works Nos. 10S(2), 10T(1), 10T(4), 10T(6) and 10T(8) | |
| Borough of Dartford, Parish of Southfleet | Slip road from A2 to Park Corner Road between points C1 and C2 | Work No. 10T(8) |
| Footpath DR132 between points B1 and B2 | New footpath between points B2 and B3 | |
| New Barn Road between points A1 and A2 | Work No. 11F | |
| Hook Green Road between points D1 and D2 | Work No. 11D | |
| Borough of Dartford, Parishes of Longfield and New Barn and Southfleet | Whitehill Road between points A1 and A2 | Work No. 11C |
| Borough of Dartford, Parish of Longfield and New Barn and District of Sevenoaks, Parish of Horton Kirby and South Darenth | Footpath DR160 between points B1 and B2 | New footpath between points B1, B3, B4 and B2 |
| Borough of Gravesham, Town of Gravesend | Manor Way between points B5 and B6 | Work No. 10J(2) |
| Footpath NU14 between points A1 and A2 | New footpath between points A1, A3, A4 and A2 | |
| Footpath NU 7A between points B1 and B2 | New footpath between points B1, B3 and B2 | |
| Footpath NU14 between points C1 and C2 | New footpath between points C1, C3 and C2 | |
| Footpath NU16 between points D1 and D2 | New footpath between points D1 and D5 | |
| Bridleway NU24 between points F1 and F2 | New bridleway between points F1, F5, F6 and F2 | |
| Footpath NU23 between points F3 and F4 | New footpath between points F4 and F2 | |
| Downs Road between points G1 and G2 | Work No. 10P | |
| Access road to Hazells between points H1 and H2 | Work No. 10Q | |
| Bridleway NU27 between points J1 and J2 | New bridleway between points J1, J3, J4 and J2 | |
| Footpath NU29 between points L1 and L2 | New footpath between points L1, K3, L3 and L2 | |
| Footpath NU9 between points K1 and K2 | New footpath between points K1 and K3 | |
| Borough of Gravesham, Town of Gravesend and Parish of Cobham | Footpaths NU18, NS193 and NG15 between points M1 and M4 | New footpath between points M4 and M5 |
| Borough of Gravesham, Parish of Cobham | Church Road between points A1 and A2 | Work No. 12C and new footpath between points A3, A4, A5 and A2 |
| Footpaths NG16 and NS175 between points B1 and B3 | Works Nos. 12C and 12D and new footpath between points B3 and B4 | |
| Henhurst Road between points C1 and C2 | Work No. 12D | |
| Footpath NS177 between points D1 and D2 | Work No.12D and new footpaths between points D1 and D3 and between points D4 and D2 | |
| Access road between points E1, E4 and E2 | New access roads between points E1, E3 and E2 and between points E3 and E4 | |
| Scotland Lane (Byway NS195) between points F1 and F2 | Works Nos. 12E and 12F | |
| Watling Street (B395) between points G1 and G2 | Work No. 12F | |
| Access road between points F3 and F4 | Works Nos. 12E and 12F | |
| Halfpence Lane (C492) and slip road to A2 between points H1 and H3 | Works Nos. 32B and 32C | |
| Slip road from A2 to Halfpence Lane between points H4 and H2 | Work No. 32B | |
| Footpath NS179 between points L1 and L2 | New footpaths between points L3 and L4 and between points L2 and L5 | |
| Access road between points M1 and M2 | Work No. 12L | |
| Borough of Gravesham, Parish of Shorne | A2 eastbound slip road between points J3 and J4 | Work No. 32A |
| Borough of Gravesham, Parishes of Cobham and Shorne | Brewers Road between points J1 and J2 | Work No. 12H |
| Access road between points K3 and K2 | Work No. 12K | |
| Footpath NS180 between points K2 and K4 | Work No. 12K | |
| Footpath NS161 between points K6, K2, K8 and K5 | Work No. 12K and new footpath between points L5, K7 and K5 | |
| City of Rochester upon Medway, Town of Rochester and Parish of Cuxton | Footpath RS203 between points B2 and B3 | New footpath between points B2, B5, B4 and B3 |
| A228 (Rochester Road) between points C1 and C3 | Work No. 13A(4) and Work No. 36F between its commencement and its junction with Work No. 13A(4) | |
| M2 westbound entry slip road between points C6 and C7 | Work No. 13A(2), Work No. 36C between its junction with Work No. 13A(2) and its termination, and Work No. 36E between its junction with Work No. 36C and its termination | |
| M2 westbound exit slip road between points C8 and C7 | Work No. 13A(3) and Work No. 36E between its junction with Work No. 36C and its termination | |
| M2 eastbound exit slip road between points C9 and C4 | Works Nos. 13A(1) and 13A(4) and Work No. 36F between its commencement and its junction with Work No. 13A(4) | |
| City of Rochester upon Medway, Town of Rochester | Burham Road (D422) between points A1 and A2 | Work No. 13B |
| Bridleway RR16 between points E4, E11 and E12 | Work No. 13C between its junction with Work No. 38F and its termination, Work No. 38F between point E13 and its termination, and new bridleway between points E4 and E13 (having a junction at point E4 with bridleway RR16 as existing, so far as not stopped up under paragraph 3 of Schedule 12 below, or, if so stopped up, with Work No. 38C) | |
| City of Rochester upon Medway, Town of Rochester and Borough of Tonbridge and Malling, Parish of Wouldham | Bridleway MR11 (Stony Lane) between points A1 and A2 | Work No. 13C |
| Bridleway MR12 between points E12 and A1 | Work No. 13C | |
| Borough of Tonbridge and Malling, Parish of Aylesford | Byway MR401 between points T1 and T2 | Work No. 13E |
| Borough of Maidstone, Parish of Boxley | Boarley Lane (D898) between points A1 and A2 | Work No. 13G |
| Footpath KH25 between points B1 and B2 | New footpath between points B1, B3 and B2 | |
| Boxley Road (C97) between points C1 and C2 | Work No. 13H | |
| Footpath KH15 between points D1 and D2 | New footpath between points D1, D3 and D2 | |
| Borough of Maidstone, Parish of Thurnham | Footpath KH71 between points A1, A2 and A3 | New footpath between points A1, A4, A5 and A6 |
| Thurnham Lane between points B1 and B2 | Work No. 14A | |
| Bridleway KH123 between points C1, C2 and C3 | New bridleway between points C1 and C4 | |
| Water Lane between points D1 and D2 | Work No. 14B | |
| Footpath KH130 between points E1, E4 and E2 | New footpaths between points E1, E3 and E2 and between points E3 and E4 | |
| Bridleway KH134 (Crismill Lane) between points F1 and F2 | Work No. 14C | |
| Borough of Maidstone, Parishes of Thurnham and Hollingbourne | Footpath KH141 between points G1 and G2 | Work No. 14C and new footpath between points G3 and G2 |
| Borough of Maidstone, Parish of Hollingbourne | Footpath KH132A between points A1 and A2 | New footpath between points A1 and A3 |
| Footpath KH198 between points C1, C2 and C3 | New footpath between points C1, C4, C3 and C5 | |
| Hospital Road (D971) between points D1 and D2 | Work No. 14E | |
| Borough of Maidstone, Parish of Broomfield | Footpath KH201 between points A1, A2 and A3 | Works Nos. 14F and 14G and new footpath between points A1, A4 and A5 |
| Borough of Maidstone, Parishes of Broomfield and Hollingbourne | Greenway Court Road (D946) between points E1 and E2 | Works Nos. 14F and 14G |
| Borough of Maidstone, Parishes of Broomfield and Harrietsham | A20 (Ashford Road) between points B1 and B2 | Work No. 14F |
| Borough of Maidstone, Parish of Harrietsham | Footpath KH343 between points A1 and A5 | New footpaths between points A1, A2 and A4 and between points A2 and A3 |
| Bridleway between points C1 and C2 | New bridleway between those points | |
| Footpath KH272 between points E1, E2, E3 and E4 | New footpaths between points E1, E5 and E4 and between points E1 and E6 | |
| Footpath KH272A between points F1, F2 and F3 | New footpath between points F1, F4 and F5 | |
| Access road between points G1 and G2 | Work No. 14J | |
| Borough of Maidstone, Parish of Lenham | Footpath KH416 between points A1 and A2 | New footpath between points A1 and A3 |
| Sandway Road (C92) between points C1 and C2 | Work No. 14L | |
| Footpath KH414B between points D1 and D2 | Work No. 14L and new footpaths between points D3 and D1 and between points D4 and D5 | |
| Old Ham Lane (D986) between points E1 and E2 | Work No. 14M | |
| Footpath KH415 between points F3, F1 and F2 | New footpath between points F4 and F5 | |
| Borough of Maidstone, Parishes of Boughton Malherbe and Lenham | Lenham Heath Road (C92) between points J1 and J2 | Work No. 14Q |
| Lenham Heath Road (C92) between points K1 and K2 | Work No. 14R | |
| Bowley Lane between points L1 and L2 | Work No. 14S | |
| Borough of Maidstone, Parish of Lenham | Access road to Water Street Cottage between points M1 and M2 | Works Nos. 14U and 14V |
| Hook Street between points P1 and P2 | Works Nos. 14U and 14V | |
| Footpath KH408A between points Q1, Q2, Q3 and Q4 | New footpath between points Q1 and Q4 | |
| Footpath KH407A between points R1 and R2 | New footpath between points R1, R3, R4 and R2 | |
| Borough of Ashford, Parish of Charing | Bridleway AW58 between points D1, D2 and C3 and footpath AW17 between points C1 and C3 | New bridleway and footpath between points D1, C1 and D3 |
| Hurst Lane (D1198) between points E1 and E2 | Works Nos. 15E and 15F | |
| Newlands Road (D1199) between points F1 and F2 | Work No. 15F | |
| Footpath AW30 between points G1 and G2 | New footpath between points G3 and G2 | |
| Borough of Ashford, Parishes of Charing and Little Chart | Leacon Lane (D1220) between points J1 and J2 and between points J3 and J4 | Work No. 15H |
| Borough of Ashford, Parish of Charing | Footpath AW44 between points L1 and L2 | New footpath between points L3, L4 and L2 |
| Footpath AW40 between points M1 and M2 | New footpath between points M1, M3 and M2 | |
| Borough of Ashford, Parishes of Charing, Hothfield and Westwell | A20 (Maidstone Road) at West Leacon between points P1 and P2 and between points P3 and P4 | Works Nos. 15K and 15L |
| Borough of Ashford, Parish of Westwell | Westwell Lane (D1227) between points B1 and B2 | Work No. 15M |
| Footpath AW123 between points A1 and A2 | Work No.15M and new footpath between points A1 and A3 | |
| Footpath AW124 between points C1, C2 and C3 | Works Nos. 15M and 15N and new footpath between points C4 and C5 | |
| Footpath AW124 between points E1, E2 and E3 | New footpath between points E1 and E3 | |
| Borough of Ashford, Parishes of Hothfield and Westwell | A20 (Maidstone Road) at Yonsea between points F1 and F2 | Work No. 15P |
| Borough of Ashford, Parish of Hothfield | Byway AW173 between points A1, A2 and A3 | New byway between points A4 and A3 |
| Borough of Ashford, Parish of Hothfield and Town of Ashford | Godinton Lane (C154) between points B1 and B2 | Work No. 15Q |
| Borough of Ashford, Town of Ashford | Footpath AU67 between points A1 and A2 | New footpath between points A1 and A3 |
| Godinton Road (B2074) between points C1 and C2 | Works Nos. 16G and 16H | |
| Carlton Road (E1467) between points C4 and C5 | Work No. 16G | |
| Footpath AU34 between points D1, D2 and D6 | New footpath between points D1, D3, D4, D5 and D6 | |
| Footpath AU37 between points F1 and F2 | Work No. 16M | |
| Beaver Road (A2070) between points G1 and G2 | Work No. 16N | |
| Footpath AU52 between points J1 and J2 | New footpath between points J1, J3, J4, J5 and J2 | |
| Boys Hall Road and Canterbury Road (E1466) between points P1 and P2 | Work No. 16QQ | |
| Footpath AU51 between points Q1 and Q2 | Work No. 16RR(1) and Work No. 16RR between its junction with Work No. 16RR(1) and point Q2 | |
| Crowbridge Road (D4488) between points N1 and N2 | Work No. 16RR(1) and Work No. 16RR between its commencement and its junction with Work No. 16RR(1) | |
| Borough of Ashford, Parish of Sevington | Footpath AE341 between points A1 and A2 | New footpath between points A1 and A5 |
| Footpath AE343 between points A2, A7 and A3 | New footpath between points A5, A6 and A3 | |
| Footpath AE342 between points A2 and A4 | New footpath between points A5 and A8 | |
| Highfield Lane between points B5, B4, B6 and B7 and between points B8 and B9 | Works Nos. 17B, 17C and 17C(1) | |
| Borough of Ashford, Parishes of Sevington and Mersham | Footpath AE344 between points C1 and C2 and footpath AE364 between points C2, C4 and C5 | New footpath between points C6, C7, C8, C9, C3 and C5 |
| Borough of Ashford, Parish of Mersham | Church Road (C177) between points B1 and B2 and between points B3 and B4 | Works Nos. 17F and 17G |
| Footpath AE369 between points D1 and D2 | New footpath between points D1 and D3 | |
| Borough of Ashford, Parishes of Mersham and Smeeth | Footpath AE373 between points E1 and E2 | New footpath between points E1, E3 and E2 |
| Borough of Ashford, Parish of Smeeth | Footpath AE428 between points A1, A2 and A3 and footpath AE430 between points A2 and A4 | New footpath between points A3, A5, A1 and A4 |
| Station Road (B2069) between points B1 and B2 | Work No. 17H | |
| Footpath AE435 between points C1 and C8 | New footpath between points C1, C3, and C4 | |
| Footpath AE437 between points C7 and C5 | New footpath between points C7, C6, C4 and C5 | |
| Borough of Ashford, Parish of Aldington | Church Lane (B1424) between points E1 and E2 | Work No. 17K |
| District of Shepway, Parish of Sellindge | Footpath HE309 between points A1, A3 and A4 | New footpath between points A1, A2 and A4 |
| Bridleway HE271A between points C1, C2 and C3 | New bridleway between points C1 and C4 and new footpath between points C1, C2 and C3 | |
| District of Shepway, Parish of Stanford | Footpath HE274 between points A1, A2 and A4 | New footpath between points A1 and A4 |
| District of Shepway, Parishes of Postling, Saltwood and Stanford | Footpath HE227 between points B3, C1, C2, C3 and C4 | Work No.17N and new footpaths between points B3, B4 and C5 and between points C6 and C4 |
| District of Shepway, Parishes of Postling and Saltwood | A20 (Ashford Road) between points B1 and B2 | Work No. 17Q and new footpath between points B3, B4 and B5 |
| District of Shepway, Parish of Saltwood | Footpath HE294 between points A1 and A2 | Work No. 18H and new footpath between points A1 and A3 |
| Footpath HE280 between points C1, C2 and C3 | New footpath between points C4 and C5 | |
| Footpath HE349 between points C3, C10, C6 and C7 | New footpath between points C8, C9 and C7 | |
| Bridleway HE350 between points C11 and C12 | New bridleway between points C12 and C8 | |
Stopping up: level crossings¶
| (1) | (2) | (3) |
|---|---|---|
| Area | Name of highway at crossing | Extent of closure and nature of work |
| GREATER LONDON | ||
| London Borough of Barking and Dagenham | Chequers Lane | Chequers Lane to be stopped up between points H1 and H2. Footbridge to be provided to carry a new footpath between points H3, H4, H5 and H6. |
| London Borough of Havering | Manor Way | Manor Way to be stopped up between points A1 and A2. Footbridge to be provided to carry a new footpath between points A1, A3, A4, A5, A6 and A2. |
| Ferry Lane | Ferry Lane to be stopped up between points F1 and F2. Footbridge to be provided to carry a new footpath between points F3, F4, F5, F6, F7 and F2. | |
| COUNTY OF ESSEX | ||
| Borough of Thurrock | A1090 (Tank Hill Road) | A1090 (Tank Hill Road) to be stopped up between points J1 and J7. |
| COUNTY OF KENT | ||
| Borough of Ashford, Town of Ashford | Aylesford Place | Aylesford Place to be stopped up between points H1 and H2. |
Permanent obstruction¶
Temporary interference¶
Street works¶
Construction¶
Maintenance¶
Bridges carrying highways¶
Agreements with highway authorities etc.¶
Use of subsoil¶
SCHEDULE 4 ¶
Acquisition of Land within Limits Shown on Deposited Plans
Section 4.
Part I Purposes for which Certain Land may be Acquired or Used¶
| (1) | (2) | (3) |
|---|---|---|
| Area | Number of land shown on deposited plans | Purpose for which land may be acquired or used |
| GREATER LONDON | ||
| London Borough of Camden | 15, 16 and 159 | The provision of car parking, a working site, and access for construction purposes. |
| 1 to 13, 149 to 151 and 153 to 158 | Road improvement works and alterations to ventilation shafts. | |
| 37 | The provision of parking, a working site and access for construction purposes. | |
| 61 | The provision of parking and a working site. | |
| 79 | The provision of access for construction purposes. | |
| 63, 64, 74 and 76 to 78 | The provision of access for protective works. | |
| 87 | The provision of access for construction purposes and a working site. | |
| 182 and 189 to 192 | The provision of access for construction purposes. | |
| 194, 196 and 197 | The provision of access for construction purposes and permanent access for operational purposes. | |
| 198 to 200 | The provision of access for construction purposes and permanent access for operational purposes. | |
| 203 and 204 | The provision of access for construction purposes. | |
| 227 | The provision of access for construction purposes. | |
| London Borough of Islington | 1 and 2 | Road improvement works. |
| 331, 333, 334, 336 and 337 | The construction of a ventilation shaft, provision of permanent access thereto, and a working site. | |
| 786 and 1048 | The provision of electricity supply apparatus, access for construction purposes and permanent access for operational purposes. | |
| 782 and 1050 | The provision of access for construction purposes. | |
| 787 and 788 | The provision of access for construction purposes. | |
| 792 and 794 | The provision of protective works for public utilities’ apparatus. | |
| London Borough of Hackney | 184 and 212 | The construction of a ventilation shaft, provision of permanent access thereto, and a working site. |
| 773 to 777 | The provision of access for construction purposes and river bank strengthening works. | |
| 778 and 779 | The provision of barge moorings and barge loading facilities. | |
| 780 | The provision of barge loading facilities, spoil handling plant and machinery, a temporary shaft to Work No. 6, a working site and access for construction purposes. | |
| 781 and 782 | The provision of access for construction purposes. | |
| London Borough of Newham | 1 and 2 (part) | The provision of a working site, access for construction purposes and river bank strengthening works. |
| 2 (part), 5 (part), 7 (part) and 8 (part) | Alteration of overhead electric cables for electricity supply for construction purposes. | |
| 6 | The provision of access for construction purposes. | |
| 7 (part) | The provision of a working site. | |
| 1, 4, 5 (part) and 8 (part) | The provision of a working site, drainage works and river bank strengthening works and diversion of a telephone cable. | |
| 7 (part), 8 (part) and 11 (part) | The provision of permanent access for operational purposes and diversion of a telephone cable. | |
| 8 (part) and 11 (part) | The provision of a working site and permanent access for operational purposes. | |
| 8 (part) | The provision of a working site. | |
| 8 (part), 12 (part), 14 and 15 | The provision of a working site, access for construction purposes and permanent access for operational purposes. | |
| 8 (part), 12 (part) and 13 | The provision of a working site and access for construction purposes. | |
| 519 to 521, 541 and 550 | The construction of a ventilation shaft, provision of permanent access thereto, and a working site. | |
| 1237 (part), 1244 and 1245 | The construction of a ventilation shaft, provision of permanent access thereto, and a working site. | |
| 1237 (part) and 1239 | The provision of a working site. | |
| 1253 and 1254 (part) | The provision of barge moorings and barge loading facilities. | |
| 1254 (part) | The provision of spoil handling plant and machinery, a conveyor, a working site and access for construction purposes. | |
| 1255 and 1260 | The provision of spoil handling plant and machinery, a conveyor and access for construction purposes. | |
| 1261 | The provision of spoil handling plant and machinery and a conveyor. | |
| 1262 and 1263 (part) | The provision of access for construction purposes. | |
| 1263 (part) and 1264 (part) | The provision of a working site and access for construction purposes. | |
| 1264 (part), 1265 and 1268 | The provision of a temporary footbridge and raising of the existing footbridge. | |
| 1269 | The provision of a working site and access for construction purposes. | |
| London Borough of Waltham Forest | 1 and 3 | The provision of a working site and a temporary tunnel segments manufacturing facility, a maintenance and servicing depot, access and drainage works. |
| 5 to 8 (part) | The provision of drainage works. | |
| 8 (part) and 9 | The provision of access for construction of drainage works. | |
| 10 | The provision of access for construction of drainage works. | |
| 13 and 14 | The provision of drainage works. | |
| London Borough of Barking and Dagenham | 161, 166 (part), 167 (part), 168 and 169 | The provision of underground electric cables for electricity supply apparatus. |
| 195 and 199 | The provision of a turning head. | |
| 196 (part) and 197 (part) | Reinstatement of railway sidings. | |
| 206 and 209 | Alterations to a proposed service bridge and the provision of access for construction purposes. | |
| 205 | The provision of access for construction purposes. | |
| 182 | Road improvement works. | |
| 195, 198 (part), 200 (part) to 202 | The provision of access for construction purposes. | |
| 198 (part) | The provision of a working site and diversion of high pressure gas pipelines and other public utilities’ apparatus. | |
| 208 (part) | The diversion of high pressure gas pipelines, a water pipe, overhead electric cables and other public utilities’ apparatus. | |
| 208 (part) and 210 | The diversion of high pressure gas pipelines, a water pipe, overhead electric cables and other public utilities’ apparatus. | |
| 221 to 226 (part) | The diversion of gas pipelines, overhead electric cables and other public utilities’ apparatus and provision of a working site. | |
| 215 and 226 (part) | The provision of accesses for construction purposes. | |
| 217 to 219 | The provision of access for construction purposes. | |
| 766 and 768 | The construction of a ventilation shaft, provision of permanent access thereto and a working site. | |
| 787, 788 and 790 to 793 | The provision of protective works for public utilities’ apparatus and access for construction purposes. | |
| 789 and 795 (part) | The provision of a working site, access for construction purposes and permanent access for operational purposes. | |
| 795 (part) and 798 | The provision of electricity supply apparatus and permanent access for operational purposes. | |
| 797 | The provision of electricity supply apparatus and permanent access for operational purposes. | |
| 800, 801 and 831 | The provision of a working site, a conveyor, spoil handling plant and machinery, diversion of overhead electric cables and other public utilities’ apparatus and access for construction purposes and permanent access for operational purposes. | |
| 802 | The diversion of public utilities’ apparatus | |
| 803, 804, 808 and 809 | The provision of a working site, a turning head and access for construction purposes, diversion of public utilities’ apparatus and alteration of watercourses. | |
| 805 to 807 | The provision of access for construction purposes, diversion of overhead electric cables and other public utilities’ apparatus and alteration of watercourses. | |
| 814 and 815 | Provision of a turning head, alteration of watercourses and access for construction purposes. | |
| 829 and 830 | The provision of a conveyor, spoil handling plant and machinery, and access for construction purposes. | |
| 839 | The use of a jetty and provision of moorings in the River Thames. | |
| 841 | The diversion of public utilities’ apparatus. | |
| 818, 819, 821, 822, 842 to 845 and 846 (part) | The diversion of overhead electric cables and other public utilities’ apparatus. | |
| 846 (part) and 847 to 849 | The diversion of overhead electric cables, high pressure gas pipelines and other public utilities’ apparatus. | |
| London Borough of Havering | 1 to 4 | The provision of access for construction purposes. |
| 7, 8, 10 (part), 11 and 12 | The provision of electricity supply apparatus, diversion of gas pipelines, overhead electric cables and other public utilities’ apparatus and provision of a working site. | |
| 10 (part) and 15, 16, 17 (part) and 18 (part) | The diversion of high pressure gas pipelines, overhead electric cables and other public utilities’ apparatus. | |
| 10 (part) | Connection of diverted high pressure gas pipelines to the existing network. | |
| 10 (part) | The provision of a balancing pond, a working site, diversion of public utilities’ apparatus and permanent access for operational purposes. | |
| 19 to 22 | The construction of a turning head and provision of a footbridge. | |
| 17 (part) and 18 (part) | The diversion of public utilities’ apparatus. | |
| 18 (part) | The provision of permanent access for operational purposes. | |
| 25 to 30 and 45 | The provision of a working site and access for construction purposes. | |
| 18 (part), 50 (part), 51, and 61 | The provision of flood storage land at Rainham Creek. | |
| 50 (part) and 59 to 66 | The diversion of overhead electric cables. | |
| 55 and 56 | The provision of access for construction purposes. | |
| 18 (part), 52, 53, 79 (part), 80 (part) and 81 to 83 | The diversion of high pressure gas pipelines. | |
| 57, 72 and 73 | The construction of a turning head and provision of a new footbridge. | |
| 79 (part) and 80 (part) | The provision of a working site, alteration of watercourses and diversion of overhead electric cables. | |
| 79 (part) | The diversion of a high pressure gas pipeline and alteration of watercourses. | |
| 79 (part), 80 (part) and 84 (part) | The diversion of a high pressure gas pipeline and provision of access for construction purposes. | |
| 84 (part) and 86 (part) | The diversion of a high pressure gas pipeline, diversion of overhead electric cables, alteration of watercourses and landscaping. | |
| 85 | The provision of noise barriers. | |
| 87 (part), and 88 | The provision of access for construction purposes and permanent access for operational purposes. | |
| 87 (part), 89 and 90 (part) | The provision of noise barriers and diversion of overhead electric cables. | |
| 84 (part) and 86 (part) | The provision of landscaping, alteration of watercourses and permanent access for operational purposes. | |
| 86 (part) | The alteration of watercourses. | |
| 90 (part) to 92 | The alteration of watercourses. | |
| 93 and 94 | The diversion of overhead electric cables, high pressure gas pipeines and other public utilities’ apparatus. | |
| 95 to 107 | The diversion of overhead electric cables. | |
| 108 | The diversion of public utilities’ apparatus. | |
| 109 | The diversion of overhead electric cables. | |
| London Borough of Hammersmith and Fulham | 1, 2 and 8 to 12 | The provision of access for construction purposes and permanent access for operational purposes. |
| COUNTY OF ESSEX | ||
| Borough of Thurrock | 4 (part) | The alteration of watercourses. |
| 42 and 44 | The diversion of water and gas pipes. | |
| 39 and 45 | The provision of a working site and permanent access for operational purposes. | |
| 47 and 48 (part) | The provision of landscaping. | |
| 46, 48 (part), 49 and 51 | The provision of a working site, landscaping and access for construction purposes. | |
| 48 (part) and 50 | The provision of access for construction purposes. | |
| 54 (part) and 55 (part) | The provision of access for construction purposes. | |
| 52, 54 (part) and 55 (part) to 67 | The provision of access for construction purposes. | |
| 81, 83, 84, 89, 93, 94, 96 and 98 | The provision of a working site and access for construction purposes. | |
| 91 and 92 | The provision of a spoil disposal site. | |
| 100 | The construction of a ventilation shaft, provision of permanent access thereto and a working site. | |
| 101 and 102 | The provision of permanent access to a ventilation shaft and a working site. | |
| 104 | The diversion of overhead electric cables, provision of a working site and diversion of high pressure gas pipelines. | |
| 107 | The provision of a working site and permanent access for operational purposes. | |
| 108 and 155 | The provision of access for construction purposes and permanent access for operational purposes. | |
| 109 to 114 | The diversion of overhead electric cables. | |
| 120 and 126 | The provision of landscaping, diversion of overhead electric cables and provision of access for construction purposes. | |
| 128 and 129 | The diversion of overhead electric cables. | |
| 130 | The provision of landscaping, diversion of overhead electric cables and access for construction purposes. | |
| 131, 137 and 138 | The diversion of overhead electric cables. | |
| 141 and 142 | The provision of access to public utilities’ apparatus. | |
| COUNTY OF KENT | ||
| Borough of Dartford, Parish of Swanscombe and Greenhithe | 1 and 2 | Use of working jetty and moorings in the River Thames. |
| 2 (part) and 3 (part) | The provision of working sites, spoil settlement lagoons, and spoil disposal. | |
| 2 (part) | The provision of working sites, access for construction purposes and spoil disposal. | |
| 2 (part) | The provision of a ventilation shaft and permanent access thereto, and a working site. | |
| 2 (part) and 11 (part) | The provision of access for construction purposes. | |
| 11, 13 and 14 | The provision of access for construction purposes. | |
| 15 (part) | The provision of access for construction purposes. | |
| 15 (part), 18, 19, 20, 24 and 25 (part) | The provision of landscaping and access for construction purposes. | |
| 25 (part), 26 to 32 and 33 (part) | The provision of an international and domestic passenger station with ancillary development and parking, diversion of overhead electric cables and provision of access for construction purposes. | |
| 21, 22, 23 and 25 (part) | The provision of access for construction purposes. | |
| 25 (part) | The diversion of overhead electric cables. | |
| 36 and 39 | The diversion of overhead electric cables and provision of a new access to Northfleet West Grid sub-station. | |
| 25 (part), 41 and 42 | The provision of access for construction purposes and diversion of overhead electric cables. | |
| 33 | The diversion of overhead electric cables. | |
| Borough of Dartford, Parish of Southfleet | 11 | Alteration of overhead electric cables. |
| 12 and 13 | The provision of access for construction purposes. | |
| 16, 19 and 32 (part) | The diversion of underground electric cables. | |
| 26 | The provision of access for construction purposes. | |
| 19 (part) | The provision of a working site, access for construction purposes and landscaping. | |
| 19 (part) | The provision of a working site, and diversion of overhead electric cables. | |
| 74 | The provision of a working site, protective works and landscaping. | |
| 49 (parts) | The provision of working sites. | |
| 53 | The provision of a working site and access for construction purposes. | |
| 49 (part) and 54 | The provision of access for construction purposes and permanent access to electrical apparatus. | |
| 44 | The provision of a balancing pond. | |
| 11, 14 and 31, 32 (part), 33 and 34 | The provision of a working site, access for construction purposes and diversion of overhead electric cables. | |
| Borough of Dartford, Parish of Longfield and New Barn | 2, 5 and 6 | The provision of a balancing pond, landscaping, diversion of a high pressure gas pipeline and access for construction purposes. |
| 9 and 12 | The diversion of a high pressure gas pipeline, provision of balancing ponds and access for construction purposes. | |
| 10 | The provision of a working site, protective works and landscaping. | |
| Borough of Gravesham, Town of Gravesend | 1 | The provision of spoil settlement lagoons and spoil disposal. |
| 2, 3 and 4 | The provision of access for construction purposes. | |
| 10 | The diversion of overhead electric cables. | |
| 12 to 14 | The provision of access for construction purposes. | |
| 15, 16 (part) and 17 (part) | The diversion of overhead electric cables. | |
| 16 (part) and 17 (part) | The diversion of overhead electric cables. | |
| 16 (part), 17 (part), 22 to 30 (part), 31 (part), 32 (part), 33 (part), 34 (part), 45 (part) and 46 (part) | The provision of an international and domestic passenger station with ancillary development and parking and access for construction purposes. | |
| 31 (part), 32 (part), 33 (part), 34 (part), 35 and 36 | The diversion of overhead electric cables, landscaping and access for construction purposes. | |
| 16 (part), 45 (part) and 46 (part) | The provision of access for construction purposes. | |
| 30 (part) | The provision of protective works for a pumping station and access for construction purposes. | |
| 44, 47, 48, 62 and 63 | The provision of a working site, spoil disposal site and use of jetty and rail access. | |
| 30 (part) | The provision of landscaping. | |
| 42 | The provision of access for construction purposes. | |
| 70 (part) | The provision of a working site. | |
| 68 | The provision of access for construction purposes and permanent access for operational purposes. | |
| 30 (part), 31 (part), 70 (part) and 71 (part) | The provision of access for construction purposes. | |
| 37 and 74 to 79 | The alteration of overhead electric cables, the provision of access for construction purposes, a working site and permanent access for operational purposes. | |
| 72 | The alteration of overhead electric cables. | |
| 78, 80 and 81 | The provision of access for work on overhead electric cables. | |
| 88, 89 (part) and 90 to 93 | The provision of a working site, a balancing pond, diversion of overhead electric cables and permanent access for operational purposes. | |
| 99, 100 (part) and 101 (part) | The provision of a working site and landscaping. | |
| 93, 100 (part), 101 (part) and 102 | The provision of landscaping. | |
| 97 | The diversion of overhead electric cables and provision of landscaping. | |
| 105, 107 and 108 | The provision of a spoil disposal site and landscaping. | |
| 109 to 112 | The provision of pedestrian access, a footbridge, a working site and access for construction purposes. | |
| District of Sevenoaks, Parish of Horton Kirby and South Darenth | 3, 4 and 5 | The provision of an electricity supply to an existing railway and permanent access for operational purposes. |
| 2 | The diversion of a high pressure gas pipeline. | |
| District of Sevenoaks, Parish of Swanley | 1 | The provision of electricity supply apparatus to existing railway. |
| Borough of Gravesham, Parish of Cobham | 1 to 6 and 7 (part) | The provision of landscaping, a spoil disposal site and permanent access for operational purposes. |
| 7 (part) | The diversion of a high pressure gas pipeline. | |
| 9 (part) | The provision of a spoil disposal site and diversion of overhead electric cables. | |
| 9 (part), 10, 11 and 12 | The provision of a balancing pond, landscaping, diversion of a high pressure gas pipeline, overhead electric cables, a connection to electricity supply apparatus and permanent access for operational purposes. | |
| 9 (part) | The provision of electricity supply apparatus, connection to the electricity supply and permanent access for operational purposes. | |
| 23, 25, and 26 | The diversion of a water pipe. | |
| 28 | The provision of a working site and temporary road diversion. | |
| 34 (part) | The diversion of a footpath. | |
| 34 (part) and 40 (part) | Restoration of Repton Ponds. | |
| 40 (part) | The provision of a working site. | |
| 42 (part) | The provision of landscaping, diversion of a high pressure gas pipeline and permanent access for operational purposes. | |
| 42 (part) and 47 | The provision of a working site, access for construction purposes and permanent access for operational purposes. | |
| 42 (part) | The provision of electricity supply apparatus. | |
| 48 | The diversion of pipelines, diversion of a footpath and landscaping. | |
| Borough of Gravesham, Parish of Higham | 9 and 10 | The provision of access to a railhead to be used for construction purposes. |
| Borough of Gravesham, Parish of Shorne | 1 and 2 | Alteration of overhead electric cables. |
| 18 | The provision of access to a railhead to be used for construction purposes. | |
| City of Rochester Upon Medway, Parish of Cuxton | 4 | The diversion of pipelines, diversion of a footpath and landscaping. |
| 5 and 6 | The provision of a working site, new woodland planting and landscaping. | |
| 11 to 18, 21, 22, 27 and 29 | The provision of a working site, permanent access for operational purposes to Medway Bridge (comprised in Work No. 13), access for construction purposes and landscaping. | |
| City of Rochester Upon Medway, Town of Rochester | 8, 9, 10 and 12 | The provision of a spoil disposal site and access for construction purposes. |
| 27 to 30 (part), 33 (part) and 39 (part) | The provision of a working site and access to the River Medway for construction purposes. | |
| 18 to 22, 30 (part), 33 (part) and 39 (part) | The provision of drainage works. | |
| 36, 49, 52, 53 and 62 | Access for construction purposes and permanent access for operational purposes. | |
| 39 (part) | The provision of a working site, access for construction purposes and landscaping. | |
| 40, 45, 46, 48, 51 and 63 | The provision of a working site, landscaping, and protective works to water mains. | |
| 64 and 67 | The provision of landscaping. | |
| 65, 68, 69 and 71 | The provision of access for construction purposes. | |
| Borough of Tonbridge and Malling, Parish of Wouldham | 1 and 2 | The provision of access for construction purposes. |
| 11 and 13 | The provision of new woodland planting. | |
| Borough of Tonbridge and Malling, Parish of Aylesford | 1, 4, 29 and 41 | The provision of a working site and access for construction purposes. |
| 190 (part) | The provision of a working site and landscaping. | |
| 190 (part) and 193 to 195 | The provision of a working site, access for construction purposes, landscaping, a balancing pond, diversion of overhead electric cables and permanent access for operational purposes. | |
| 190 (part) | The provision of electricity supply apparatus and permanent access for operational purposes. | |
| Borough of Maidstone, Parish of Boxley | 38 (part) | The provision of electricity supply apparatus and permanent access for operational purposes. |
| 37, 38 (part), 39, 40, 41 and 42 (part) | The diversion of overhead electric cables and landscaping. | |
| 38 (part), 42 (part) and 43 | The provision of drainage works, landscaping and access for construction purposes. | |
| 44 (part) | The provision of landscaping and diversion of overhead electric cables. | |
| 44 (part) | The provision of a balancing pond and permanent access for operational purposes. | |
| 44 (part) and 45 to 49 | The provision of a working site, drainage works and landscaping. | |
| 52 (part) and 53 | The provision of landscaping and permanent access to a balancing pond and for operational purposes. | |
| 52 (part) and 54 (part) | The provision of landscaping, footpath diversion and diversion of overhead electric cables. | |
| 54 (part) and 58 | The provision of drainage works. | |
| 60 | The provision of new woodland planting. | |
| 73, 74, 80, 81, 82, and 86 (part) | The provision of a balancing pond, landscaping, diversion of a gas pipeline and permanent access for operational purposes. | |
| 86 (part) | The provision of a working site and a footpath diversion. | |
| 86 (part), 88 and 89 (part) | The provision of access for construction purposes. | |
| 89 (part) and 90 | The provision of new woodland planting. | |
| Borough of Maidstone, Parish of Detling | 1 | The provision of a working site and access for construction purposes. |
| 4 and 7 (part) | The provision of access for construction purposes. | |
| 5, 7 (part) and 8 | The provision of a balancing pond, landscaping and permanent access for operational purposes. | |
| 14 and 17 | The provision of a balancing pond and permanent access for operational purposes. | |
| Borough of Maidstone, Parish of Thurnham | 1 and 3 | The provision of new woodland planting. |
| 5 | The provision of a working site and access for construction purposes. | |
| 8 | The provision of a balancing pond, diversion of a footpath, landscaping and permanent access for operational purposes. | |
| 14 | The provision of a site for nature conservation. | |
| 18 | The provision of a working site, landscaping and access for construction purposes. | |
| Borough of Maidstone, Parish of Hollingbourne | 1, 3, 4 (part) and 5 | The provision of a working site, landscaping and access for construction purposes. |
| 4 (part), 6, 9 and 10 (part) | The provision of access for construction purposes and permanent access for operational purposes. | |
| 7 (part) and 8 | Alteration of a watercourse, provision of a balancing pond and permanent access for operational purposes. | |
| 7 (part), 16, 17 and 18 | The provision of drainage works. | |
| 10 (part) | The provision of drainage works, a balancing pond and permanent access for operational purposes. | |
| 11, 13 and 14 | The provision of landscaping. | |
| 19, 20, 24 and 26 | The provision of permanent access for operational purposes. | |
| 29, 32 and 33 | The provision of balancing ponds and permanent access for operational purposes. | |
| Borough of Maidstone, Parish of Leeds | 1 | The provision of access for construction purposes. |
| Borough of Maidstone, Parish of Harrietsham | 8, 9 and 10 | The provision of a balancing pond, drainage works and permanent access for operational purposes. |
| 13 | The provision of drainage works, a balancing pond and a working site. | |
| 2, 20, and 21 | The diversion of public utilities’ apparatus. | |
| 32, 34 and 35 to 38 (part) | The provision of balancing ponds, drainage works, a working site, access for construction purposes and footpath diversions, landscaping and permanent accesses for operational purposes. | |
| 38 (part), 41 and 42 | The provision of landscaping and access for construction purposes. | |
| 43, 45 and 46 | The provision of a waste disposal site, borrow pit, protective works, landscaping and access for maintenance and construction purposes. | |
| Borough of Maidstone, Parish of Ulcombe | 1 | The provision of a balancing pond, drainage works and permanent access for operational purposes. |
| Borough of Maidstone, Parish of Lenham | 6 | The provision of a waste disposal site, borrow pit, protective works, landscaping and access for maintenance and construction purposes. |
| 10 and 11 | The provision of drainage works and access for construction purposes. | |
| 20 (part) | The provision of a spoil disposal site and a balancing pond. | |
| 20 (part) | The provision of a spoil disposal site. | |
| 33 and 34 | The provision of a balancing pond. | |
| 87 to 89 (part) | The provision of permanent access for operational purposes. | |
| 89 (part), 90 and 91 | The provision of permanent access for operational purposes. | |
| Borough of Ashford, Parish of Charing | 21 and 22 | The provision of landscaping and new woodland planting. |
| 38 and 39 | The provision of landscaping. | |
| 51 | The provision of replacement access to premises. | |
| 66 | The diversion of public utilities’ apparatus. | |
| 76 and 77 | The provision of an accommodation access. | |
| 68, 70, 71 and 72 | The provision of drainage works. | |
| Borough of Ashford, Parish of Hothfield | 1 and 2 | The provision of drainage works. |
| 6 | The provision of access for construction purposes. | |
| 7, 8 (part), 10 (part) and 12 (part) | The provision of access for construction purposes and permanent access for operational purposes. | |
| 8 (part), 10 (part), 11, and 12 (part) | The provision of a working site, landscaping and permanent access for operational purposes. | |
| 12 (part), 14 and 16 | The provision of a working site, landscaping and permanent access for operational purposes. | |
| Borough of Ashford, Parish of Westwell | 1, 4, 5, and 20 (part) | The provision of a working site, spoil disposal site, landscaping and permanent access for operational purposes. |
| 16, 17, 18, 19, 20 (part) and 21 (part) | The provision of a working site and landscaping. | |
| 21 (part), 24, 25, 26, 27, 40, 41 and 42 | The provision of access for construction purposes, a working site and landscaping. | |
| 44 and 45 | The provision of landscaping. | |
| 47 and 48 | The provision a spoil disposal site and landscaping. | |
| 56, 57, 60 (part), 65 and 67 | The provision of a borrow pit, spoil disposal site, access for construction purposes, an accommodation access and landscaping. | |
| 49 and 60 (part) | The provision of access for construction purposes and permanent access for operational purposes. | |
| Borough of Ashford, Town of Ashford | 8 | The provision of a working site and landscaping. |
| 6, 10, 12 (part) and 13 | The provision of drainage works and diversion of a gas main. | |
| 12 (part) and 14 (part) | The provision of accommodation access to premises, landscaping and a working site. | |
| 14 (part) and 16 | The provision of a working site. | |
| 14 (part) and 15 | The provision of a working site and access for construction purposes. | |
| 34 to 37 and 48 | The provision of a working site and access for construction purposes. | |
| 59 to 73 and 76 | The provision of a working site and access for construction purposes. | |
| 78 (part) | The provision of a working site and access for construction purposes. | |
| 46, 78 (part), 79 and 80 | The provision of a working site and access for construction purposes. | |
| 85, 86, 89, 94 and 95 | The provision of a working site and access for construction purposes. | |
| 84 and 88 | The provision of access for construction purposes and permanent emergency access to the gas holder station and depot. | |
| 92, 93, 98 (part), 99 and 100 | The provision of access for construction purposes and permanent emergency access to the gas holder station and depot. | |
| 110, 111, 117 and 122 | The provision of a working site and access for construction purposes. | |
| 125 (part) and 131 | The provision of a working site and access for construction purposes. | |
| 178, 181, 183, 194 and 195 | The provision of flood storage lands and access for construction purposes. | |
| 144, 145, 177, 179, 180, 184, 185 and 186 | The provision of drainage works and access for construction purposes. | |
| 238 to 241 | The provision of a working site and access for construction purposes. | |
| Borough of Ashford, Parish of Sevington | 5 | The provision of drainage works, a balancing pond and permanent access for operational purposes. |
| 7 and 8 | The provision of a working site, access for construction purposes and permanent access for operational purposes. | |
| 9 and 12 (part) | The provision of drainage works, a balancing pond and permanent access for operational purposes. | |
| 12 (part), 16 and 19 | The provision of a railhead, a working site, a balancing pond, access for construction purposes and permanent access for operational purposes. | |
| 28 | The provision of a working site. | |
| 34 | The provision of drainage works and access for construction purposes. | |
| 33 | The provision of a spoil disposal site. | |
| 35 | The provision of access for construction purposes, permanent access for operational purposes and dedication of road as a public highway connecting to Bad Munstereifel Road. | |
| Borough of Ashford, Parish of Mersham | 1 | The provision of a spoil disposal site. |
| 4 | The provision of drainage works, noise barriers and access for construction purposes. | |
| 11, 14, 15, 17, 20 and 27 | The provision of drainage works, a balancing pond, noise barriers, landscaping, access for construction purposes and permanent access for operational purposes. | |
| 19, 21, 22, 25 and 26 | The provision of landscaping, access for construction purposes and permanent access for operational purposes. | |
| 37, 41, 42, 45 and 46 | The provision of a working site, access for construction purposes, diversion of public utilities’ apparatus, a balancing pond and permanent access for operational purposes. | |
| 43 | The provision of noise barriers and drainage works and access for construction purposes. | |
| Borough of Ashford, Parish of Smeeth | 6, 8, 13 and 16 | The provision of drainage works, footpath diversions, landscaping and permanent access for construction purposes. |
| 24, 27 | The provision of access for construction purposes. | |
| 9, 10, 11 and 12 | The provision of drainage works, a balancing pond, landscaping and permanent access for operational purposes. | |
| 21 and 28 | The provision of flood storage lands. | |
| 30 (part) and 31 | The provision of a working site and access for construction purposes. | |
| 30 (part) | The provision of electricity supply apparatus, landscaping and permanent access for operational purposes. | |
| 32 to 34 | The provision of access for construction purposes and alteration of overhead electric cables. | |
| 35 | The provision of noise barriers and access for construction purposes. | |
| Borough of Ashford, Parish of Aldington | 5 and 7 (part) | The provision of electricity supply apparatus, landscaping and permanent access for operational purposes. |
| 7 (part), 12, 13 (part) and 14 | The provision of electricity supply apparatus and access for construction purposes. | |
| 3, 6 and 10 | The diversion of overhead electric cables. | |
| 13 (part), 19 and 20 | The provision of a working site, landscaping and access for construction purposes. | |
| District of Shepway, Parish of Sellindge | 3, 4 and 5 | The provision of noise barriers and access for construction purposes. |
| 1, 2 and 6 | The provision of a working site, diversion of overhead electric cables and access for construction purposes. | |
| 8 | Strengthening of railway embankment and diversion of overhead electric cables. | |
| 9 and 11 | The diversion of electric high voltage underground cables. | |
| 12, 14 and 15 | The diversion of electric high voltage underground cables and access for construction purposes. | |
| 16, 26 and 32 (part) | The diversion of electric high voltage underground cables, the provision of noise barriers and access for construction purposes. | |
| 32 (part), 33, 46 and 47 | The alteration of overhead electric cables, provision of noise barriers and access for construction purposes. | |
| 30 | The alteration of overhead electric cables. | |
| 44, 45 and 60 | The provision of access for construction purposes. | |
| District of Shepway, Parish of Stanford | 1 (part) | The provision of noise barriers and access for construction purposes. |
| 1 (part) and 2 | The provision of landscaping and access for construction purposes. | |
| 8 and 9 (part) | The provision of drainage works, noise barriers, a working site and access for construction purposes. | |
| 7, 9 (part), 17, 18 and 19 | The provision of access for construction purposes. | |
| District of Shepway, Parish of Saltwood | 1 and 3 | The provision of a working site, accommodation works and access for construction purposes. |
| 7 | The provision of a balancing pond and permanent access for operational purposes. | |
| 13 to 16 | The provision of a working site and access for construction purposes. | |
| 26 | The provision of a footpath. | |
| 30 | The provision of drainage works. | |
| 37, 38 and 39 | The provision of a bridleway diversion, reconstruction of a bridleway bridge, provision of a working site, diversion of public utilities’ apparatus and access for construction purposes. | |
| District of Shepway, Parish of Postling | 6 and 8 | The provision of permanent access for operational purposes. |
| 11 and 14 to 18 | The provision of a working site and access for construction purposes. | |
| District of Shepway, Parish of Newington | 3 and 4 | The provision of a working site and access for construction purposes. |
| 6 and 9 | The provision of access for construction purposes. | |
| 17 and 27 (part) | The provision of a spoil disposal site and access for construction purposes. | |
| 14, 15, 16, 19, 20, 21, 32 and 37 | The provision of access for construction purposes. | |
| 31 and 40 | The provision of working sites and access for construction purposes. | |
| 27 (part) | The provision of access for construction purposes. | |
| 13, 25 and 29 | The provision of access for construction purposes, and permanent access to a balancing pond and for operational purposes. | |
| 60 and 61 | The provision of access for construction purposes and permanent access for operational purposes. | |
| 62 | The provision of access for construction purposes. | |
| District of Shepway, Parish of Hythe | 1 | The provision of access for construction purposes. |
| District of Shepway, Town of Folkestone | 1 | Alteration of railway track equipment. |
| 2 and 3 | The provision of access for construction purposes, and permanent access to a balancing pond and for operational purposes. | |
| 4 (part) | The provision of access for construction purposes and permanent access for operational purposes. | |
| 4 (part) | The provision of lineside equipment and permanent access for operational purposes. | |
| 6 | The provision of a working site and access for construction purposes. | |
| District of Thanet, Parish of Minster | 2 | The provision of access to a railhead to be used for construction purposes. |
| Borough of Dover, Parish of Sandwich | 1 | The provision of access to a railhead to be used for construction purposes. |
Part II Application of Legislation Relating to Compulsory Purchase¶
Lands Clauses Consolidation Act 1845¶
Compulsory Purchase Act 1965¶
Compulsory Purchase (Vesting Declarations) Act 1981¶
Part III Supplementary Provisions¶
Acquisition of subsoil¶
| Area | No. on deposited plans |
|---|---|
| GREATER LONDON | |
| London Borough of Islington | 307 to 318, 320 to 330, 332, 335, 338 to 739, 798, 799 and 803 to 1042 |
| London Borough of Hackney | 1 to 183, 185 to 211 and 213 to 772 |
| London Borough of Newham | 16 to 518, 522 to 540, 542 to 549, 551 to 1207, 1209 to 1223, 1235, 1236, 1238, 1240 to 1243 and 1246 to 1252 |
| London Borough of Redbridge | 8 to 14 |
| London Borough of Barking and Dagenham | 227 to 765, 767, 769 to 786, 794 and 796 |
| COUNTY OF ESSEX | |
| Borough of Thurrock | 99 and 103 |
| COUNTY OF KENT | |
| Borough of Tonbridge and Malling, Parish of Aylesford | 51 to 140 and 144 to 183 |
| Borough of Tonbridge and Malling, Parish of Burham | 1 to 9 |
| Area | No. on deposited plans |
|---|---|
| GREATER LONDON | |
| London Borough of Camden | 178 |
| London Borough of Islington | 740 to 771 |
| COUNTY OF KENT | |
| Borough of Ashford, Parish of Mersham | 39 |
Acquisition of existing tunnels¶
| Area | No. on deposited plans |
|---|---|
| GREATER LONDON | |
| London Borough of Camden | 117 to 120, 122 to 140 and 228 to 231 |
| London Borough of Islington | 20, 21 and 775 to 778 |
| COUNTY OF KENT | |
| Borough of Gravesham, Town of Gravesend | 49 to 61 |
Acquisition of new rights¶
- section 9(4) (failure of owners to convey),
- paragraph 10(3) of Schedule 1 (owners under incapacity),
- paragraph 2(3) of Schedule 2 (absent and untraced owners), and
- paragraphs 2(3) and 7(2) of Schedule 4 (common land),
Acquisition of part only of certain properties¶
Minerals¶
Power to require acquisition where time limit extended¶
- “lessee” means a person who holds an interest under a lease for a period of which not less than 21 years is unexpired at the date of the giving of any notice by that person under sub-paragraph (2) above,
- “owner”, in relation to any land, means a person, other than a mortgagee not in possession, who is for the time being entitled to dispose of the fee simple of the land, whether in possession or in reversion, and
Compensation¶
SCHEDULE 5 ¶
Temporary Possession and Use of Land
Section 6.
Occupation and use for construction of works¶
| (1) | (2) | (3) | (4) |
|---|---|---|---|
| Works | Area | Number of land shown on deposited plans | Purpose for which temporary possession may be taken |
| GREATER LONDON | |||
| 1A, 1B, 1C, 1D, 1F and 5D(1) | London Borough of Camden | 79 | The provision of access for construction purposes. |
| 1A, 1B, 1C, 1D and 1F | 87 | The provision of a working site and access for construction purposes. | |
| 1A, 1AA, 1B, 1BB, 1C, 1CC, 1D, 1DD, 1EE, 1K, 3, 3B, 3C and 5A | 182 and 189 to 192 | The provision of access for construction purposes. | |
| 1HH, 3B and 3C | 203 and 204 | The provision of access for construction purposes. | |
| 1JJ, 2AA and 2BB | London Borough of Islington | 782 and 1050 | The provision of access for construction purposes. |
| 1AA, 1BB and 3E | 787 and 788 | The provision of access for construction purposes. | |
| 6 | London Borough of Hackney | 778 and 779 | The provision of barge moorings and barge loading facilities. |
| 6 | 780 | The provision of barge loading facilities, spoil handling plant and machinery, a temporary shaft to Work No. 6, a working site and access for construction purposes. | |
| 6 | 781 and 782 | The provision of access for construction purposes. | |
| 22 | London Borough of Newham | 1237 and 1239 | The provision of a working site. |
| 6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 | 1253 and 1254 | The provision of barge moorings and barge loading facilities, spoil handling plant and machinery, a conveyor, a working site and access for construction purposes. | |
| 6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 | 1255 to 1260 | The provision of spoil handling plant and machinery, a conveyor and access for construction purposes. | |
| 6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 | 1261 | The provision of spoil handling plant and machinery and a conveyor. | |
| 6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 | 1262 and 1263 | The provision of access for construction purposes. | |
| 6, 6A, 6B, 6C, 6D, 6G, 6H, 6J and 7 | 1269 | The provision of a working site and access for construction purposes. | |
| 6D and 6E | London Borough of Waltham Forest | 6 | The provision of access for construction purposes. |
| 6D and 6E | 10 | The provision of access for construction of drainage works. | |
| 8Q | London Borough of Barking and Dagenham | 205 | The provision of access for construction purposes. |
| 8H, 8P(3) and 8P(4) | 195, 201 and 202 | The provision of access for construction purposes. | |
| 8L and 8R | 215 and 226 | The provision of accesses for construction purposes. | |
| 8, 8G, 8J and 8R | 217 to 219 | The provision of access for construction purposes. | |
| 22, 22A, 22B, 22C, 22E, 22F, 22G, 22J and 8U(13) | 829 and 830 | The provision of a conveyor, spoil handling plant and machinery, and access for construction purposes. | |
| 22, 22A, 22B, 22C, 22E, 22F, 22G, 22J and 8U(13) | 839 | The use of a jetty and provision of moorings in the River Thames. | |
| 8, 8G, 8J and 8R | London Borough of Havering | 1 to 4 | The provision of access for construction purposes. |
| 8 and 8S | 25 to 30 and 45 | The provision of a working site and access for construction purposes. | |
| 8 and 8U(7) | 55 and 56 | The provision of access for construction purposes. | |
| COUNTY OF ESSEX | |||
| 9 | Borough of Thurrock | 52 and 56 to 67 | The provision of access for construction purposes. |
| 9, 9C, 9D, 9F(1) and 10 | 81, 83, 84, 89, 93, 94, 96 and 98 | The provision of a working site and access for construction purposes. | |
| COUNTY OF KENT | |||
| 10, 10A, 10B, 10C and 10J | Borough of Dartford, Parish of Swanscombe and Greenhithe | 13 and 14 | The provision of access for construction purposes. |
| 10B, 10D, 10F(1) and 10R(2) | 21 to 23 | The provision of access for construction purposes. | |
| 10, 10T(1), 10T(3), 10T(8), 10R, 10P, 10Q and 11 to 11F | Borough of Dartford, Parish of Southfleet | 12 and 13 | The provision of access for construction purposes. |
| 10T(6), 10T(7) and 10T(8) | 26 | The provision of access for construction purposes. | |
| 11 | 53 | The provision of a working site. | |
| 10J and 10J(2) | Borough of Gravesham, Town of Gravesend | 2 to 4 | The provision of access for construction purposes. |
| 10, 10B, 10C, 10D, 10E and 10F(1) | 12 to 14 | The provision of access for construction purposes. | |
| 10R(2) | 42 | The provision of access for construction purposes. | |
| 10B, 10C and 10N | 70 | The provision of access for construction purposes. | |
| 12, 12F and 12H | Borough of Gravesham, Parish of Cobham | 28 | The provision of a working site and temporary road diversion. |
| 20A and 20B | Borough of Gravesham, Parish of Higham | 9 and 10 | The provision of access to a railhead to be used for construction purposes. |
| 20A and 20B | Borough of Gravesham, Parish of Shorne | 18 | The provision of access to a railhead to be used for construction purposes. |
| 13, 13B | City of Rochester Upon Medway, Town of Rochester | 27 to 29 | The provision of a working site and access to the River Medway for construction purposes. |
| 13C and 13D | 65, 68, 69 and 71 | The provision of access for construction purposes. | |
| 13C and 13D | Borough of Tonbridge and Malling, Parish of Wouldham | 1 and 2 | The provision of access for construction purposes. |
| 13 | Borough of Tonbridge and Malling, Parish of Aylesford | 1, 4, 29 and 41 | The provision of a working site and access for construction purposes. |
| 13 | Borough of Maidstone, Parish of Boxley | 88 | The provision of access for construction purposes. |
| 13 and 13J | Borough of Maidstone, Parish of Detling | 1 | The provision of a working site and access for construction purposes. |
| 14 and 14A | Borough of Maidstone, Parish of Thurnham | 5 | The provision of a working site and access for construction purposes. |
| 14 | Borough of Maidstone, Parish of Leeds | 1 | The provision of access for construction purposes. |
| 15 | Borough of Ashford, Parish of Hothfield | 6 | The provision of access for construction purposes. |
| 16, 16A, 16B and 16F | 15 | The provision of a working site and access for construction purposes. | |
| 16, 16A and 16B | Borough of Ashford, Town of Ashford | 16 | The provision of a working site. |
| 16C and 16H | 34 to 37 and 48 | The provision of a working site and access for construction purposes. | |
| 16 and 16H | 59 to 73 and 76 | The provision of a working site and access for construction purposes. | |
| 16 and 16K | 78 | The provision of a working site and access for construction purposes. | |
| 16A, 16B, 16C, 16K and 16L | 46 and 78 to 80 | The provision of a working site and access for construction purposes. | |
| 16, 16A, 16B, 16C, 16K and 16M | 85, 86, 89, 94 and 95 | The provision of a working site and access for construction purposes. | |
| 16, 16A, 16B 16C and 16D | 110, 111, 117 and 122 | The provision of a working site and access for construction purposes. | |
| 16, 16A, 16B, 16C, 16D and 16E | 125 and 131 | The provision of a working site and access for construction purposes. | |
| 17, 17B and 17C | Borough of Ashford, Parish of Sevington | 28 | The provision of a working site. |
| 17 and 17H | Borough of Ashford, Parish of Smeeth | 24 and 27 | The provision of access for construction purposes. |
| 17, 17J(1) and 17K | 31 | The provision of a working site and access for construction purposes. | |
| 17 and 17J(2) | District of Shepway, Parish of Sellindge | 44, 45 and 60 | The provision of access for construction purposes. |
| 17 | District of Shepway, Parish of Stanford | 7 and 17 to 19 | The provision of access for construction purposes. |
| 17 and 17Q | District of Shepway, Parish of Saltwood | 13 to 16 | The provision of a working site and access for construction purposes. |
| 17, 17Q and 17P | District of Shepway, Parish of Postling | 11 and 14 to 18 | The provision of a working site and access for construction purposes. |
| 18B, 18E, 18F and 18G | District of Shepway, Parish of Newington | 3 and 4 | The provision of a working site and access for construction purposes. |
| 18J | 6 and 9 | The provision of access for construction purposes. | |
| 18A, 18AA, 18B, 18F, 18G and 18K | 14 to 16, 19 to 21, 32 and 37 | The provision of a working site and access for construction purposes. | |
| 18A, 18AA, 18B and 18G | 31 and 40 | The provision of working sites and access for construction purposes. | |
| 18AA | 62 | The provision of access for construction purposes. | |
| 18E | District of Shepway, Parish of Hythe | 1 | The provision of access for construction purposes. |
| 18AA | District of Shepway, Town of Folkestone | 6 | The provision of a working site and access for construction purposes. |
| 13, 14, 15, 15A, 15B, 16, 16A, 16B, 16C, 16D, 16E, 17, 18A, 18AA, 18B, 18C, 18D, 18F, 18G and all railway works associated therewith | District of Thanet, Parish of Minster | 2 | The provision of access to a railhead to be used for construction purposes. |
| 13, 14, 15, 15A, 15B, 16, 16A, 16B, 16C, 16D, 16E, 17, 18A, 18AA, 18B, 18C, 18D, 18F, 18G and all railway works associated therewith | District of Dover, Parish of Sandwich | 1 | The provision of access to a railhead to be used for construction purposes. |
- F27. . .
- “relevant planning authority” means—
- in relation to Greater London, the local planning authority, and
- in relation to Essex or Kent, the district planning authority; and
- “structure” includes any erection.
Occupation and use for maintenance of works¶
Suspension of private rights of way¶
SCHEDULE 6 ¶
Planning Conditions
Section 9.
Part I Qualifying Authorities¶
Specification¶
Transition¶
Part II Development in Greater London¶
Introductory¶
Planning regimes¶
Conditions: non-qualifying authority¶
Conditions: qualifying authority¶
| Operation or work | Grounds |
|---|---|
1.Construction works (a) The erection, construction, alteration or extension of any building (except for anything within (b) or (c) below or item 2 or 6) or road vehicle park. (b) The construction, alteration or extension of any terracing, cuttings, embankments or other earth works. (c) The erection, construction, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening or dust suppression. | That the design or external appearance of the works ought to be modified— (a) to preserve the local environment or local amenity, (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or (c) to preserve a site of archaeological or historic interest or nature conservation value, and is reasonably capable of being so modified. That the development ought to, and could reasonably, be carried out elsewhere within the limits of the land on which the works of which it forms part may be carried out under this Part of this Act. |
| 2.Minor construction works The erection, construction, alteration or extension of any transformers, electronic communications masts or pedestrian accesses to the railway line. | That the design or external appearance of the works ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified. |
| That the development ought to, and could reasonably, be carried out on land elsewhere within the relevant limits. | |
| 3.Fences and walls The erection, construction, alteration or extension of any fences or walls (except for anything within item 1(c) above). | That the development ought to, and could reasonably, be carried out on land elsewhere within the relevant limits. |
| 4.Highway access The formation, laying out or alteration of any means of access to a highway used, or proposed highway proposed to be used, by vehicular traffic. | That the development ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and is reasonably capable of being so modified. |
| 5.Gantries and overhead line supports The erection or construction of any gantries or overhead line supports for so much of any railway comprised in Work No. 1 as lies between the northern end of the roof over St. Pancras station, as it is at the time of erection or construction, and the northern abutment of the existing bridge over the Regent’s Canal. | That the design or external appearance of the work ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified. |
| 6.Artificial lighting The erection, construction or installation of lighting equipment. | That the design of the equipment, with respect to the emission of light, ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified. |
| That the development ought to, and could reasonably, be carried out elsewhere within the limits of land on which the works of which it forms part may be carried out under this Part of this Act. | |
| 7.Waste and spoil disposal The disposal of waste or spoil. | That— (a) the design or external appearance of disposal sites on land within the relevant limits, (b) the methods by which such sites are worked, or (c) the noise, dust, vibration or screening arrangements during the operation of such sites, ought to be modified and are reasonably capable of being modified. That— (a) to preserve the local environment or local amenity, (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or (c) to preserve a site of archaeological or historic interest or nature conservation value, the development ought to be carried out on land elsewhere within the relevant limits, and is reasonably capable of being so carried out. |
| 8.Borrow pits The excavation of bulk materials from borrow pits. | That— (a) the design or external appearance of borrow pits on land within the relevant limits, (b) the methods by which such pits are worked, or (c) the noise, dust, vibration or screening arrangements during the operation of such pits, ought to be modified and are reasonably capable of being modified. That— (a) to preserve the local environment or local amenity, (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or (c) to preserve a site of archaeological or historic interest or nature conservation value, the development ought to be carried out on land elsewhere within the relevant limits, and is reasonably capable of being so carried out. |
| Matters | Grounds |
|---|---|
| 1.Road transport Means and routes by which anything is to be transported on a highway by large goods vehicle to a working or storage site, a site where it will be re-used or a waste disposal site. | That the arrangements ought to be modified— (a) to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
| 2.Handling of re-useable spoil and top soil Handling during removal, storage and re-use of any spoil or top soil removed during the course of carrying out the development. | That the arrangements ought to be modified to ensure that the spoil or top soil remain in good condition and are reasonably capable of being so modified. |
3.Storage sites Sites on land within the relevant limits at which— (a) minerals, aggregates or other construction materials required for the development, or (b) spoil or top soil, are to be stored until used or re-used in carrying out the development or disposed of as waste. | That the arrangements ought to be modified— (a) to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
| 4.Construction camps Sites on land within the relevant limits which are to be used for the residential accommodation of persons engaged in carrying out the development. | As item 3. |
| 5.Screening Provision where necessary on land within the relevant limits of any screening for working sites on such land required for the purpose of carrying out the development. | As item 3. |
| 6.Hours of working The hours and days of the week during which work on the development on land within the relevant limits is to be carried out. | That the arrangements ought to be modified to preserve the local environment or local amenity, and are reasonably capable of being so modified. |
| 7.Artificial lighting The use of artificial lighting on land within the relevant limits for the purpose of carrying out the development. | As item 6. |
| 8.Suppression of noise, dust and vibration The suppression of noise, dust and vibration caused by construction operations carried on on land within the relevant limits for the purpose of carrying out the development. | As item 6. |
| 9.Mud on highway Measures to be taken on land within the relevant limits to prevent mud being carried onto any public highway as a result of carrying on the development. | That the arrangements ought to be modified— (a) to preserve the local environment or local amenity, or (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
| 10.Highway access The formation, laying out or alteration of any means of access to any highway used, or proposed highway proposed to be used, on a temporary basis by vehicular traffic to serve a construction site or camp. | That the arrangements ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
Conditions: general¶
Part III Development in Essex or Kent¶
Introductory¶
Planning regimes: district councils¶
District conditions: non-qualifying authority¶
District conditions: qualifying authority¶
| Operation or work | Grounds |
|---|---|
1.Construction works (a) The erection, construction, alteration or extension of any building (except for anything within (b) or (c) below or item 2 or 6) or road vehicle park. (b) The construction, alteration or extension of any terracing, cuttings, embankments or other earth works. (c) The erection, construction, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening or dust suppression. | That the design or external appearance of the works ought to be modified— (a) to preserve the local environment or local amenity, (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or (c) to preserve a site of archaeological or historic interest or nature conservation value, and is reasonably capable of being so modified. That the development ought to, and could reasonably, be carried out elsewhere within the limits of the land on which the works of which it forms part may be carried out under this Part of this Act. |
| 2.Minor construction works The erection, construction, alteration or extension of any transformers, electronic communications masts or pedestrian accesses to the railway line. | That the design or external appearance of the works ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified. |
| That the development ought to, and could reasonably, be carried out on land elsewhere within the relevant limits. | |
| 3.Fences and walls The erection, construction, alteration or extension of any fences or walls (except for anything within item 1(c) above). | That the development ought to, and could reasonably, be carried out on land elsewhere within the relevant limits. |
| 4.Highway access The formation, laying out or alteration of any means of access to a highway used, or proposed highway proposed to be used, by vehicular traffic. | That the development ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and is reasonably capable of being so modified. |
| 5.Gantries and overhead line supports The erection or construction of any gantries or overhead line supports for so much of the railway comprised in Work No. 13 as lies between 1,000 and 2,400 metres from its western end. | That the design or external appearance of the work ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified. |
| 6.Artificial lighting The erection, construction or installation of lighting equipment. | That the design of the equipment, with respect to the emission of light, ought to be modified to preserve the local environment or local amenity, and is reasonably capable of being so modified. |
| That the development ought to, and could reasonably be, carried out elsewhere within the limits of land on which the works of which it forms part may be carried out under this Part of this Act. |
| Matters | Grounds |
|---|---|
| 1.Handling of re-useable spoil and top soil Handling during removal, storage and re-use of any spoil or top soil removed during the course of carrying out the development. | That the arrangements ought to be modified to ensure that the spoil or top soil remains in good condition and are reasonably capable of being so modified. |
2.Storage sites Sites on land within the relevant limits at which— (a) minerals, aggregates or other construction materials required for the development, or (b) spoil or top soil, are to be stored until used or re-used in carrying out the development or disposed of as waste. | That the arrangements ought to be modified— (a) to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
| 3.Construction camps Sites on land within the relevant limits which are to be used for the residential accommodation of persons engaged in carrying out the development. | As item 2. |
| 4.Screening Provision where necessary on land within the relevant limits of any screening for working sites on such land required for the purpose of carrying out the development. | As item 2. |
| 5.Hours of working The hours and days of the week during which work on the development on land within the relevant limits is to be carried out. | That the arrangements ought to be modified to preserve the local environment or local amenity, and are reasonably capable of being so modified. |
| 6.Artificial lighting The use of artificial lighting on land within the relevant limits for the purpose of carrying out the development. | As item 5. |
| 7.Suppression of noise, dust and vibration The suppression of noise, dust and vibration caused by construction operations carried on on land within the relevant limits for the purpose of carrying out the development. | As item 5. |
| 8.Mud on highway Measures to be taken on land within the relevant limits to prevent mud being carried onto any public highway as a result of carrying on the development. | That the arrangements ought to be modified— (a) to preserve the local environment or local amenity, or (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
| 9.Highway access The formation, laying out or alteration of any means of access to any highway used, or proposed highway proposed to be used, on a temporary basis by vehicular traffic to serve a construction site or camp. | That the arrangements ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
District conditions: general¶
Planning regimes: county councils¶
County conditions: non-qualifying authority¶
County conditions: qualifying authority¶
| Operation or work | Grounds |
|---|---|
| 1.Highway access The formation, laying out or alteration of any means of access to a highway used, or proposed highway proposed to be used, by vehicular traffic. | That the development ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and is reasonably capable of being so modified. |
| 2.Waste and spoil disposal The disposal of waste or spoil. | That— (a) the design or external appearance of disposal sites on land within the relevant limits, (b) the methods by which such sites are worked, or (c) the noise, dust, vibration or screening arrangements during the operation of such sites, ought to be modified and are reasonably capable of being modified. That— (a) to preserve the local environment or local amenity, (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or (c) to preserve a site of archaeological or historic interest or nature conservation value, the development ought to be carried out on land elsewhere within the relevant limits, and is reasonably capable of being so carried out. |
| 3.Borrow pits The excavation of bulk materials from borrow pits. | That— (a) the design or external appearance of borrow pits on land within the relevant limits, (b) the methods by which such pits are worked, or (c) the noise, dust, vibration or screening arrangements during the operation of such pits, ought to be modified and are reasonably capable of being modified. That— (a) to preserve the local environment or local amenity, (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, or (c) to preserve a site of archaeological or historic interest or nature conservation value, the development ought to be carried out on land elsewhere within the relevant limits, and is reasonably capable of being so carried out. |
| Matters | Grounds |
|---|---|
| 1.Handling of re-usable spoil and top soil Handling during removal, storage, and re-use of any spoil or top soil removed during the course of carrying out the development. | That the arrangements ought to be modified to ensure that the spoil or top soil remains in good condition and are reasonably capable of being so modified. |
2. Storage sites Sites on land within the relevant limits at which— (a) minerals, aggregates or other construction materials required for the development, or (b) spoil or top soil, are to be stored until used or re-used in carrying out the development or disposed of as waste. | That the arrangements ought to be modified— (a) to preserve the local environment, local amenity or a site of archaeological or historic interest or nature conservation value, or (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
| 3.Construction camps Sites on land within the relevant limits which are to be used for the residential accommodation of persons engaged in carrying out the development. | As item 2. |
| 4.Screening Provision where necessary on land within the relevant limits of any screening for working sites on such land required for the purpose of carrying out the development. | As item 2. |
| 5.Hours of working The hours and days of the week during which work on the development on land within the relevant limits is to be carried out. | That the arrangements ought to be modified to preserve the local environment or local amenity, and are reasonably capable of being so modified. |
| 6.Artificial lighting The use of artificial lighting on land within the relevant limits for the purpose of carrying out the development. | As item 5. |
| 7.Suppression of noise, dust and vibration The suppression of noise, dust and vibration caused by construction operations carried on on land within the relevant limits for the purpose of carrying out the development. | As item 5. |
| 8.Mud on highway Measures to be taken on land within the relevant limits to prevent mud being carried onto any public highway as a result of carrying on the development. | That the arrangements ought to be modified— (a) to preserve the local environment or local amenity, or (b) to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
| 9.Highway access The formation, laying out or alteration of any means of access to any highway used, or proposed highway proposed to be used, on a temporary basis by vehicular traffic to serve a working site or camp. | That the arrangements ought to be modified to prevent or reduce prejudicial effects on road safety or on the free flow of traffic in the local area, and are reasonably capable of being so modified. |
Part IV Supplementary¶
Programming of requests for planning approvals¶
Consultation¶
| Matter | Body |
|---|---|
| Nature conservation. | Natural England. |
| Conservation of the natural beauty or amenity of the countryside. | The Nature conservation or conservation of the natural beauty or amenity of the countryside . |
| Sites of archaeological or historic interest. | The Historic Buildings and Monuments Commission for England. |
Intervention by Secretary of State¶
Appeals¶
Interpretation¶
- “building” includes any structure, other than—
- anything in the nature of plant or machinery,
- any gate, fence, wall or other means of enclosure, or
- any tunnel, earthwork or railway track bed,
but does not include anything temporary or, except where forming part of a station and intended for public use, anything underground; - “deemed planning permission” means the planning permission deemed by section 9 above to be granted;
- “development” has the same meaning as in the M84Town and Country Planning Act 1990; and
- “permitted development” means development to which the deemed planning permission relates.
SCHEDULE 7 ¶
Heritage
Section 12.
Listed buildings and conservation areas¶
The Table Buildings Authorised to be Demolished¶
| (1) | (2) | (3) |
|---|---|---|
| Area | Buildings authorised to be demolished | Limit of authorised demolition or alteration |
| GREATER LONDON | ||
| London Borough of Camden | St. Pancras Station and Chambers comprising trainshed, Chambers and ancillary buildings, including those in the forecourt. Grade I. | Demolition of structures at ground and upper levels to the north and on the west side of the trainshed and alterations and partial demolition elsewhere. |
| Great Northern Hotel, Pancras Road. Grade II. | Partial demolitions and alterations in service yard and remedial alterations elsewhere. | |
| 26 Pancras Road (German Gymnasium). Grade II. | Demolition of entrance, including stairs and passageway, and western hall and alterations and partial demolition elsewhere. | |
| Kings Cross Station. Grade I. | Demolition of porte cochere and part of west side offices and remedial alterations elsewhere. | |
| Front boundary wall to Euston Road Fire Brigade Station. Grade II. | ||
| Flats 1 to 20 Stanley Buildings, Stanley Passage (south side). Grade II. | Demolition of flats 1 to 10 and remedial alterations elsewhere. | |
| 3 linked gas holders, Goods Way (west side). Grade II. | ||
| Water point north of St. Pancras Station. Grade II. | ||
| Nos. 1 to 11 (odd) Euston Road. | ||
| Red Star Parcels office, Cheney Road. | ||
| Former Police buildings, Cheney Road. | ||
| Former Motorail Terminal, Cheney Road. | ||
| South Side Buildings, Wellers Court. | ||
| British Rail Staff Association Clubhouse, 2b Pancras Road. | ||
| Kings Cross taxi park cafe (temporary building), Pancras Road. | ||
| 22, 24, 28, 30 and 32 Pancras Road. | ||
| Buildings at 40 Pancras Road. | ||
| 1 to 4 Gas Works Cottages, Battle Bridge Road. | ||
| Single unlisted gas holder, associated gas governor and gas supply building and apparatus, Battle Bridge Road. | ||
| Units 1 to 6, 1 Battle Bridge Road. | ||
| The Battle Bridge Centre, 2 to 6 Battle Bridge Road. | ||
| Warehouse, 1 and 2 Goods Way. | ||
| 1 Camley Street. | ||
| Fuel depot and electricity substation complex, Wharf Road. | ||
| Railway bridge (No. 8) over Regent’s Canal. | ||
| Railway bridge (No. 6) over Camley Street. | ||
| Light industrial unit, Camley Street (south of railway bridge No. 6). | ||
| 2 solid waste transfer stations, Camley Street. | ||
| 2 unlisted gas holders, Camley Street (west side). | ||
| No. 1 Midland Road and railway bridge No.1, at the junction of Pancras Road and Goods Way. | ||
| Arches 42 to 47 inclusive, 48 to 54 (even), 58 to 90(a) (even) (east side of Pancras Road) and disused coal drops above. | ||
| Boundary wall to Neville Close and arches 113-115 (west side of Pancras Road). | ||
| Walls along the west side of Midland Road, and along the south side of Brill Place, including incorporated structures at ground and upper levels. | ||
| Boundary walls and fences to east side of Pancras Road, south of Battle Bridge Road; north side of Clarence Passage; north and south sides of Stanley Passage; east and west side of Cheney Road; north and south sides of Battle Bridge Road; south side of Goods Way; north side of Goods Way, west of the concrete canal bridge; west side of Camley Street, south of the railway bridge; southern section of east side of Camley Street. | ||
| Any other walls, fences, parapets, bridge inverts, underground structures, plant, machinery and towpath works as required to be demolished to construct the works authorised by this Part of this Act within King’s Cross/St. Pancras, Regent’s Canal, Camden Square and Bartholomew Estate Conservation Areas. | ||
| London Borough of Islington | Caledonian Road and Barnsbury Station Ticket Office. | |
| COUNTY OF KENT | ||
| Borough of Gravesham, Parish of Cobham | Parish boundary stone, Brewers Road. Grade II. | |
| Borough of Ashford, Parish of Charing | Brockton, Egerton Road, Charing Heath. Grade II. | |
| Weatherboarded barn to the east of Brockton. Grade II. | ||
| Borough of Ashford, Parish of Hothfield | Yonsea, Maidstone Road. Grade II. | |
| Oasthouse to the south of Yonsea, Maidstone Road. Grade II. | ||
| Granary and cartshed to the north west of Yonsea, Maidstone Road. Grade II. | ||
| Yonsea Bungalow, Maidstone Road. Grade II. | ||
| Range of barns 50 metres to the north of Yonsea, Maidstone Road. Grade II. | ||
| Range of barns 50 metres to the west of Yonsea, Maidstone Road. Grade II. | ||
| Borough of Ashford, Town of Ashford | 2 Boys Hall Road. Grade II. | |
| 4 Boys Hall Road. Grade II. | ||
| District of Shepway, Parish of Sellindge | Railway Cottages (Talbot House). Grade II. | |
The Table Buildings Authorised to be Extended and Altered¶
| Area | Building |
|---|---|
| GREATER LONDON | |
| London Borough of Camden | Flats 21 — 30 Stanley Buildings, Clarence Passage (north side). Grade II. |
| Lock Keepers Cottage, Camley Street. Grade II. | |
| The Granary, York Way. Grade II. | |
| Gas holder, Goods Way (east side). Grade II. | |
| London Borough of Islington | 302 — 304 Liverpool Road. Grade II. |
| 1 — 4 Highbury Place. Grade II. | |
| Church of St Jude, Mildmay Grove. Grade II. | |
| 111 Mildmay Grove. Grade II. | |
| London Borough of Hackney | Lodge to west entrance of the German Hospital, Ritson Road. Grade II. |
| Main block and attached extension to the east of the German Hospital, Ritson Road. Grade II. | |
| Church of St. Luke, Woodbine Terrace. Grade C. | |
| Mission Hall to the north of St. Mary of Eton, Eastway. Grade II. | |
| COUNTY OF ESSEX | |
| Borough of Thurrock | Barn to north of High House, London Road, Purfleet. Grade II. |
| COUNTY OF KENT | |
| Borough of Gravesham, Town of Gravesend | 24/25 The Hill (Coach and Horses public house) Northfleet. Grade II. |
| Borough of Maidstone, Parish of Lenham | Oxley House, Boughton Road. Grade II. |
| Old Cottage and Water Street Cottage, Lenham Heath Road. Grade II. | |
| Yew Tree Cottage, Hook Street, Lenham Heath. Grade II. | |
| Borough of Ashford, Parish of Charing | Rose Cottage, Westwell Leacon. Grade II. |
| The Old Parsonage Farmhouse, Maidstone Road. Grade II. | |
| Borough of Ashford, Town of Ashford | Industrial building belonging to Knowles Removals and Storage, Station Road. Grade II. |
| Willesborough and District Labour Club, Bentley Road. Grade II. | |
| Borough of Ashford, Parish of Sevington | Orchard Cottage, Church Road. Grade II. |
| Nos. 1 and 2 Maytree Cottages, Church Road. Grade II. | |
| Bridge Cottage, Highfield Lane, Sevington. Grade II. | |
| Borough of Ashford, Parish of Mersham | Bridge House, Church Road. Grade II. |
| District of Shepway, Parish of Sellindge | Stream Cottage and Grove Bridge Cottage, Barrow Hill. Grade II. |
Ancient monuments etc.¶
SCHEDULE 8 ¶
Heritage: rights of entry
Section 13.
Historic Buildings and Monuments Commission for England¶
Royal Commission on the Historical Monuments of England¶
Interpretation¶
- “the Commission” means the Historic Buildings and Monuments Commission for England;
- “the Royal Commission” means the Royal Commission on the Historical Monuments of England;
- “scheduled monument” has the same meaning as in the M94Ancient Monuments and Archaeological Areas Act 1979.
C56SCHEDULE 9 ¶
Application of Other Railway Legislation
Section 20.
Part I Railways Clauses Acts¶
Railways Clauses Consolidation Act 1845 (c. 20)¶
- sections 1, 7 to 9, 11 to 15, 17, 19, 20, 22, 23, 42, 47, 48, 59 to 62, 74, 75, 77 to 85, 87, 88, 94, 95 and 112 to 124.
Railways Clauses Act 1863 (c. 92)¶
- sections 5 to 7 and 13 to 19.
Part II Other Legislation¶
Highway (Railway Crossings) Act 1839 (c. 45)¶
Railway Regulation Act 1842 (c. 55)¶
Regulation of Railways Act 1871 (c. 78)¶
Railway Companies (Accounts and Returns) Act 1911 (c. 34)¶
British Transport Commission Act 1949 (c. xxix)¶
Miscellaneous¶
| (1) | (2) | (3) | (4) |
|---|---|---|---|
| Enactment | Description of offence | Maximum otherwise applicable (level on standard scale) | Maximum fine (level on standard scale) |
| Section 16 of the M97Railway Regulation Act 1840. | Obstruction of officers of railway company or trespass upon railway. | Level 1 | Level 3 |
| Section 17 of the M98Railway Regulation Act 1842. | Misconduct of persons employed on railways. | Level 1 | Level 3 |
| Section 22 of the M99Regulation of Railways Act 1868. | Provision and improper use of means of communication. | Level 1 | Level 2 |
| The M100Regulation of Railways Act 1889— | |||
| section 5(1). | Failure to produce ticket, to pay fare or to give name and address. | Level 1 | Level 2 |
| section 5(3). | Travel with intent to avoid payment of fare. | Level 2 | Level 3 |
C59SCHEDULE 10 ¶
Disapplication and Modification of Miscellaneous Controls
Section 38.
Ecclesiastical law¶
Overground wires¶
London Building Acts (Amendment) Act 1939¶
Coast works¶
Highways etc.¶
Sites of special scientific interest¶
Building regulations¶
Deposits in the sea¶
London lorries: general¶
- “approved arrangements” means arrangements approved for the purposes of any of the following provisions of Schedule 6 to this Act—
- paragraph 7, so far as relating to item 1 or 6 in the table in that paragraph,
- paragraph 16, so far as relating to item 5 in the table in that paragraph,
- paragraph 23, so far as relating to item 5 in the table in that paragraph, and
- paragraph 25;
- “authorised works” means works authorised by this Part of this Act; and
- “the London Lorry Ban Order” means the Greater London (Restriction of Goods Vehicles) Traffic Order 1985.
London lorries: emergency permits¶
- “approved arrangements”, “authorised works” and “the London Lorry Ban Order” have the same meanings as in paragraph 9 above; and
- “working day” means any day which is not a Saturday or Sunday, Christmas Day, Good Friday or a bank holiday in England and Wales under the M113Banking and Financial Dealings Act 1971.
.
- “the London Lorry Ban Order” has the same meaning as in paragraph 9 above; and
- “the Westminster Lorry Ban Order” means the City of Westminster (Restriction of Goods Vehicles) Traffic Order 1992.
Works under streets in Greater London¶
Communication with public sewers in London¶
C60SCHEDULE 11 ¶
Burial Grounds: Removal of Human Remains and Monuments
Section 39.
Notice of removal¶
Removal of remains¶
Removal of monuments¶
Records¶
Supplementary¶
SCHEDULE 12 ¶
The A2 and M2 Improvement Works
Section 44.
Part I The Authorised Works¶
Description of works¶
Interpretation of Part I¶
- references to the M2 are to the special road so designated;
- references to the A2 are to the trunk road so designated;
- references to the A228 and the A229 are to the principal roads so designated;
- “Wainscott Northern Bypass” means the road scheme so named for a bypass between the A2 and the Medway Tunnel;
- “westbound” in any description of the direction of traffic signifies travel in the direction of London, whether or not London is the destination, and “eastbound” signifies travel in the opposite direction.
Part II Interference with Highways and Means of Access¶
Stopping up of highways¶
| (1) | (2) |
|---|---|
| Area | Highway or part to be stopped up |
| COUNTY OF KENT | |
| Borough of Gravesham, Parish of Shorne | Footpath NS312 for a distance of 45 metres north-eastwards from its junction with Watling Street (A2) |
| Borough of Gravesham, Parish of Cobham | Old Watling Street (B395) between points K1 and K2 |
| City of Rochester upon Medway, Parish of Cuxton | Footpath RS205 between points D1 and D2 |
| Footpath RR27 between points D2 and D3 | |
| Borough of Tonbridge and Malling, Parish of Aylesford | Access road to go-kart racing track between points S1 and S2 |
| Access road between points H1 and H2 | |
| Victoria Close between points B3 and B4 | |
| Footpath MR201 between points T1 and T3 and between points T3 and T4 | |
| Footpath MR14 for a distance of 120 metres westwards from its junction with Maidstone Road (A229) | |
| (1) | (2) | (3) |
|---|---|---|
| Area | Highway or part to be stopped up | New highway to be substituted for it |
| COUNTY OF KENT | ||
| Borough of Gravesham, Parish of Cobham | A2 westbound entry slip road between points H3 and H2 | Work No. 32C |
| A2 westbound exit slip road between points H4 and H2 | Work No. 32B | |
| Halfpence Lane (C492) between points H1 and H2 | Works Nos. 32B and 32C | |
| Footpath NS182 between points N9, P3 and N8 | New footpath between points N7 and N8 | |
| Access road between points N1 and N2 and points N3 and N4 | Works Nos. 35A and 35B | |
| Borough of Gravesham, Parish of Shorne | A2 eastbound entry slip road between points J3 and J4 | Work No. 32A |
| Borough of Gravesham, Parishes of Cobham and Higham | A2 westbound slip road between points P1 and P2 | Work No. 35A |
| City of Rochester upon Medway, Parish of Cuxton | Work No. 13A(2) | Work No. 36C between its commencement and its junction with Work No. 13A(2) |
| Work No. 13A(3) | Work No. 36D | |
| City of Rochester upon Medway, Town of Rochester and Parish of Cuxton | Footpath RS203 between points B1 and B2 | New footpath between points B1, B6, B5, B4 and B3 |
| Work No. 13A(4) | Work No. 36F between its junction with Work No. 13A(4) and its termination | |
| Work No. 13A(1) | Works Nos. 36A and 36E | |
| City of Rochester upon Medway, Town of Rochester | A228 (Rochester Road) between points C1 and C2 | Work No. 36F |
| M2 eastbound exit slip road between points C9 and C4 | Works Nos. 36A and 36E | |
| M2 westbound entry slip road between points C6 and C7 | Works Nos. 36C and 36E | |
| M2 eastbound entry slip road between points C9 and C5 | Works Nos. 36B and 36E | |
| M2 westbound exit slip road between points C8 and C7 | Works Nos. 36D and 36E | |
| Footpath RS205A between points C9 and C10 | Work No. 36K | |
| Nashenden Farm Lane between points E1 and E2 | Work No. 38C | |
| Bridleway RR16 between points E3, E2 and E4 | Work No. 38C | |
| Bridleway RR18 between points C1 and A3 | Works Nos. 38F and 13C | |
| City of Rochester upon Medway, Town of Rochester and Borough of Tonbridge and Malling, Parish of Wouldham | Work No. 13C between its commencement and its junction with Work No. 38F | Work No. 38F |
| Borough of Tonbridge and Malling, Parish of Wouldham | Bridleway MR11 between points A3, A2 and A1 | Works Nos. 38F and 13C |
| Borough of Tonbridge and Malling, Parish of Aylesford | A229 (Maidstone Road) between points F1 and F2d | Works Nos. 40A, 40B, 40C, 40D, 40E, 40F and 41A |
| Rochester Road between points F3 and F4 | Work No. 40G | |
| A229 slip road between points B1 and B2 | Work No. 40J | |
| A229 slip road between points C1 and C2 | Work No. 40L | |
| A229 slip road between points D1 and D2 | Work No. 40M | |
| A229 slip road between points E1 and E2 | Work No. 39H | |
| A229 slip road between points G1 and G2 | Work No. 40K | |
| Walderslade Woods between points F5 and F6 | Work No. 40H | |
| Walderslade Woods between points F7 and F8 | Work No. 39G | |
| M2 eastbound exit slip road between points K1 and K2 | Work No. 39A | |
| M2 eastbound entry slip road between points J1 and J2 | Work No. 39B | |
| M2 westbound exit slip road between points M1 and M2 | Work No. 39D | |
| M2 westbound entry slip road between points L1 and L2 | Work No. 39C | |
| Maidstone Road between points N1 and N2 | Work No. 39J | |
| Access way between points A1, A2 and A3 | Work No. 40P | |
| Access way between points P3 and P4 | Works Nos. 40R and 40S | |
| Access road between points P1, P3 and P2 | Work No. 40Q | |
| Access road to Crematorium between points V3 and V4 | Work No. 41D | |
| Footpath MR440 between points Q3 and Q4 | New footpath between points Q3 and Q5 | |
| Footpath MR438A between points R1 and R2 | New footpath between those points | |
| Borough of Maidstone, Parish of Boxley | Footpath KH32 between points Q1 and Q2 | Work No. 45 |
| Yelsted Lane between points E3 and E4 | Work No. 43B | |
| Lidsing Road between points F1 and F2 | Work No. 43C | |
| Footpath KH9 between points G1, G3 and G4 | New footpath between points G1, G2 and G4 | |
| Footpath KH634 between points H1 and H2 | Work No. 43D | |
| Borough of Maidstone, Parishes of Boxley and Bredhurst | Forge Lane between points H3 and H4 | Work No. 43E |
| Borough of Gillingham, Town of Gillingham and Borough of Maidstone, Parish of Bredhurst | M2 westbound entry slip road between points A1 and A2 | Work No. 44B |
| M2 eastbound exit slip road between points A3 and A4 | Work No. 44A | |
Stopping up of private access to premises¶
Temporary interference with highways¶
Part III Miscellaneous¶
Status of new highways¶
Status of operations and works¶
Treatment of provisions of this Schedule for Highways Act purposes¶
Regulation of traffic on new roads¶
SCHEDULE 13 ¶
A2 and M2 Improvement Works: Purposes for which Certain Land may be Acquired or Used
Section 45.
| (1) | (2) | (3) |
|---|---|---|
| Area | Number of land shown on deposited plans | Purpose for which land may be acquired or used |
| COUNTY OF KENT | ||
| Borough of Gravesham, Parish of Cobham | 34 | The provision of landscaping and planting. |
| 40 | The provision of a balancing pond, landscaping and planting and pumping station. | |
| 42 (part) | The provision of a balancing pond, landscaping and planting and permanent access for maintenance purposes. | |
| 42 (part) | The provision of a working site. | |
| City of Rochester Upon Medway, Parish of Cuxton | 11 to 18, 21, 22, 27 and 29 | The provision of a working site, landscaping, planting and access for construction purposes. |
| City of Rochester Upon Medway, Town of Rochester | 14 | The provision of a working site, landscaping and planting. |
| 65 | The provision of a working site, landscaping and planting. | |
| 94 to 98 | The provision of landscaping and planting. | |
| Borough of Tonbridge and Malling, Parish of Aylesford | 4 | The provision of landscaping and planting. |
| 10 to 13 | The provision of landscaping and planting. | |
| 23 to 28 | The provision of landscaping and permanent access to adjacent houses fronting Maidstone Road. | |
| 198 (part), 216, 217, 218, 243, 247, 248 and 249 | The provision of a new footbridge, landscaping and planting. | |
| 220 to 225 | The provision of landscaping and planting. | |
| 198 (part) | The provision of a working site, access for maintenance purposes, landscaping and planting. | |
| 256 | The provision of landscaping and planting. | |
| Borough of Maidstone, Parish of Boxley | 2 | The provision of landscaping and planting. |
| 22 | The provision of landscaping and planting. | |
| 26, 29 and 30 | The provision of landscaping and planting. | |
| 32 | The provision of landscaping and planting. | |
| 34 | The provision of landscaping and planting. | |
| Borough of Maidstone, Parish of Bredhurst | 12 and 15 | The provision of landscaping and planting. |
| 16 | The provision of landscaping and planting. | |
| Borough of Gillingham, Town of Gillingham | 1, 6, 7, 8 and 9 | The provision of landscaping and planting. |
| 5 | The provision of a working site. | |
C61C74 SCHEDULE 14 ¶
Overhead lines: consent
Section 50.
Scope of Schedule¶
Consent requirement¶
Applications for consent¶
Publicity¶
Consultation¶
| Matter | Body |
|---|---|
| Nature conservation. | Natural England. |
| Conservation of the natural beauty or amenity of the countryside. | The Nature conservation or conservation of the natural beauty or amenity of the countryside. |
| Sites of archaeological or historic interest. | The Historic Buildings and Monuments Commission for England. |
Grant of consent¶
Variation and revocation of consent¶
Duration of consent¶
Anticipatory applications¶
Interpretation¶
SCHEDULE 15 ¶
Protective Provisions
Section 52.
C62Part I Protection for Highways and Traffic¶
- “highway” means a highway for which the local highway authority is the highway authority;
- “plans” includes sections and specifications; and
- “property of the highway authority” means any apparatus of the highway authority affixed to or placed under any highway.
C63 Part II Protection for Electricity, Gas, Water and Sewerage Undertakers¶
- “alternative apparatus” means alternative apparatus adequate to enable the undertakers to fulfil their functions as effectively as is achievable using the apparatus which the alternative apparatus is to replace;
- “apparatus” means—
- “construction” includes execution, placing, altering, replacing, relaying and removal and, in its application to works which include or comprise any operation, means the carrying out of that operation;
- “functions” includes powers and duties;
- “in” in a context referring to apparatus in land includes under, over, across, along or upon land;
- “plans” includes sections and method statements;
- “service obligations” means any service obligation imposed on the undertakers by or under the enactments authorising them to carry on their respective undertakings; and
- “undertakers” means any of the following, namely, a licence holder within the meaning of Part I of the Electricity Act 1989, a public gas supplier within the meaning of Part I of the M131Gas Act 1986, a water undertaker within the meaning of the M132Water Industry Act 1991, a sewerage undertaker within Part I of that Act and any local authority which is a relevant authority for the purposes of section 97 of that Act; and, in relation to any apparatus, means the undertakers to whom it belongs or by whom it is maintained.
C64Part III Protection of Land Drainage, Flood Defence, Water Resources and Fisheries¶
- “the Agency” means the Environment Agency;
- “construction” includes execution, placing, altering, replacing, relaying and removal;
- “drainage work” means any watercourse and includes any land which is expected to provide flood storage capacity for any watercourse at intervals not less frequent than—
- in the case of land in a rural area, once in 50 years, and
- in the case of land in an urban area, once in 100 years,
or, if more frequent, the appropriate return period for the watercourse for which capacity is provided, and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring; - “fishery” means any waters containing fish and fish in, or migrating to or from such waters and the spawn, spawning grounds or food of such fish;
- “plans” includes sections, drawings, specifications and method statements;
- “specified work” means so much of any permanent or temporary work authorised by Part I of this Act (which includes, for the avoidance of doubt, any dredging and any geotechnical investigations that may be undertaken) as is likely to—
- affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work;
- affect the flow, purity or quality of water in any watercourse or other surface waters or ground water;
- cause obstruction to the free passage of fish or damage to any fishery; or
- affect the conservation, distribution or use of water resources; and
- “watercourse” includes all rivers, streams, ditches, drains, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer.
C65Part IV Protection of electronic communications code operators¶
Part V Protection of Port of Sheerness Limited¶
- “construction” includes execution, placing, altering, replacing, relaying and removal;
- “plans” includes sections, drawings, specifications and method statements;
- “the port authority” means the Port of Sheerness Limited;
- “the river” means the River Medway;
- “operations” includes temporary works, dredging works and temporary mooring of vessels authorised by paragraph 11 of Schedule 2 to this Act;
- “tidal work” means so much of any work authorised by Part I of this Act as is on or over the surface of land below the level of mean high water springs forming part of the river.
C66Part VI Protection of Canal & River Trust¶
- F107...
- “the canal” means the Regent’s Canal (including the St. Pancras Yacht Basin), the River Lee Navigation or the Waterworks River as the case may be, insofar as any of those waterways is owned or managed by Canal & River Trust, and includes any works connected therewith for the maintenance of which Canal & River Trust is responsible and any lands held or used by Canal & River Trust for the purposes of the canal;
- “construction” includes execution, placing, altering, replacing and relaying and includes removal;
- “plans” includes sections, drawings, specifications and method statements;
- “specified work” means so much of any permanent or temporary work authorised by Part I of this Act as is in, across, under, over or in the vicinity of the canal.
C67Part VII Protection of Port of London Authority¶
- “construction” includes execution, placing, altering, replacing, relaying and removal and, in its application to works which include or comprise any operation, means the carrying out of that operation;
- “operations” includes temporary works, dredging and mooring of vessels authorised by paragraph 11 of Schedule 2 to this Act;
- “plans” includes sections, drawings, specifications and method statements;
- “the Port Authority” means the Port of London Authority;
- “the river” means the waters within the limits of the port of London as described in Schedule 1 to the M141Port of London Act 1968;
- “specified work” means so much of any permanent or temporary work authorised by Part I of this Act (which includes, for the avoidance of doubt, any removal of gravel or other material, any dredging or similar work and any geotechnical investigations that may be undertaken) as is on, in, under or over—
- the surface of land below the level of mean high water springs forming part of the river; or
- any land owned, occupied or used by the Port Authority for operational purposes.
Footnotes
- C1Act: transfer of functions (26.1.1998) by S.I. 1997/2971, art. 3(3)(b)(4)(5)
- C2Act: transfer of rights and obligations (19.2.1999) by S.I. 1999/391, art. 4(2)(4)(6)
- C3Act: S.I. 2001/1451 to be construed as one with this Act (22.3.2001) by virtue of art. 15(2) of that S.I.
- I1Act wholly in force; Act mainly in force at Royal Assent but see ss. 40, 41, 46 for retrospective in-force dates
- C4Power conferred by s. 1 to ceased to have effect (19.2.1999) by S.I. 1999/537, art. 16
- M11981 c. 67.
- M21965 c. 56.
- C5S.7 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8S. 7 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(a), 6
- M31961 c. 33.
- M41990 c. 8.
- C6S. 8 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8S. 8 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)S. 8 applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(a)
- C7S. 9(1) excluded (17.2.1999) by S.I. 1999/107, reg. 3
- M5S.I. 1995/418.
- M61990 c. 8.
- F1Words in s. s. 11(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(a)
- F2Words in s. 11(3)(a) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(b)
- M71990 c. 8.
- F3Definition in s. 11(6) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(c)
- C8S. 14 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
- M81993 c. 43.
- C9S. 16 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
- M91993 c. 43.
- C10S. 17 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
- M101993 c. 43.
- C11S. 18 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
- C12S. 19 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
- F4Words in s. 19(2)(5)(6) substituted (1.2.2001 subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) by 2000 c. 38, s. 215, Sch. 16 para. 56; S.I. 2001/57, art. 3, Sch. 2 Pt. I
- M111986 c. 45.
- M121993 c. 43.
- C13S. 21 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
- F5Words in s. 21(6) and subsection (7) inserted (1.3.2000) by 1998 c. 41, ss. 54, 66(5), Sch. 10 Pt. IV para. 16(2) (with s. 73); S.I. 2000/344, art. 2
- C14S. 22 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
- F6S. 23 repealed (1.3.2000) by S.I. 2000/311, art. 31(2)
- F7S. 25 repealed (1.3.2000) by S.I. 2000/311, art. 31(2)
- C15S. 27 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8S. 27 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
- C16S. 28 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8S. 28 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
- M131990 c. 8.
- C17S. 29 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8S. 29 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(a), 4(1)
- M141974 c. 40.
- C18S. 29(4) transfer of functions (13.8.2001) by S.I. 2001/2568, art. 5
- F8Words in s. 29(4) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(2)
- F9Words in s. 29(4) substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(2)
- C19S. 30 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8S. 30 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
- M151990 c. 43.
- C20S. 34 applied (19.2.1999) by S.I. 1999/537, art. 15(2)
- P1Power conferred by s. 34(1) and (5) exercised (19.2.1999) by S.I. 1999/391
- M161993 c. 43.
- M171965 c. 56.
- C21S. 37 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
- C22S. 39 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
- C23S. 40 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
- M181989 c. 34.
- F10S. 42A inserted (1.2.2001 Subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) by 2000 c. 38, s. 252, Sch. 27 para. 55; S.I. 2001/57, art. 3, Sch. 2 Pt. I
- C24S. 43 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8S. 43 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(a), 4(2)S. 43 applied (12.8.2002) by S.I. 2002/1943, art. 15(3)
- F11Words in s. 43(2) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 28
- M191980 c. 66.
- M201984 c. 27.
- M211965 c. 56.
- M221981 c. 67.
- M231981 c. 66.
- M241845 c. 18.
- M251990 c. 8.
- M261961 c. 33.
- M271965 c. 56.
- M281981 c. 66.
- M291980 c. 66.
- M301973 c. 26.
- M311990 c. 8.
- M321973 c. 26.
- C25S. 50 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
- M331989 c. 29.
- F12Words in s. 50(5)(b) substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(3)
- M341990 c. 8.
- M351965 c. 56.
- C26S. 54 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8S. 54 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)S. 54 applied (12.8.2002) by S.I. 2002/1943, art. 15(4)
- M361978 c. 30.
- M371978 c. 30.
- M381972 c. 70.
- M391980 c. 66.
- M401981 c. 67.
- C27Sch. 2 para. 4 applied (with modification) (12.8.2002) by S.I. 2002/1943, art. 15(1)(b)
- C28Sch. 2 para. 6 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(b), 5
- M411981 c. 67.
- C29Sch. 2 para. 7 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(b), 5
- M421981 c. 67.
- C30Sch. 2 para. 8 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(b), 5
- M431961 c. 33.
- M441845 c. 20.
- M451965 c. 56.
- C31Sch. 2 para. 9 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1) Sch. 3 paras. 1-8Sch. 2 para. 9 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(b), 5Sch. 2 para. 9 applied (with modification) (12.8.2002) by S.I. 2002/1943, art. 15(1)(b)
- M461991 c. 57.
- M471964 c. 40.
- C32Sch. 2 para. 10 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 2 para. 10 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(b)Sch. 2 para. 10 applied (with modification) (12.8.2002) by S.I. 2002/1943, art. 15(1)(b)
- M481961 c. 33.
- C33Power conferred by Sch. 3 para. 1 ceased to have effect (19.2.1999) by S.I. 1999/537, art. 16
- C34Sch. 3 para. 2 transfer of functions (13.8.2001) by S.I. 2001/2568, art. 5
- F13Words in Sch. 3 para. 2(2) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(a)
- F14Words in Sch. 3 para. 2(3) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(b)
- F15Words in Sch. 3 para. 2(3) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(b)
- F16Words in Sch. 3 para. 2(4) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(c)
- F17Words in Sch. 3 para. 2(4) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(c)
- F18Words in Sch. 3 para. 2(8) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(d)
- F19Words in Sch. 3 para. 2(8) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(d)
- F20Words in Sch. 3 para. 2(9) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(e)
- F21Words in Sch. 3 para. 2(9) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(e)
- F22Words in Sch. 3 para. 2(9) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(e)
- F23Words in Sch. 3 para. 2(9) substituted (13.8.2001) by S.I. 2001/2568, art. 16, Sch. para. 15(4)(e)
- M491985 c. 51.
- M501988 c. 50.
- F24Sch. 3 para. 2(12) inserted (13.8.2001) by S.I. 2001/2568, Sch. para. 15(4)(f)
- C35Sch. 3 para. 3(1)(a)(2)(3) applied with modifications (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8
- C36Sch. 3 para. 3(1)(a)(2)(3) applied with modifications (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8
- C37Sch. 3 para. 3(1)(a)(2)(3) applied with modifications (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8
- M511961 c. 33.
- M521981 c. 67.
- M531961 c. 33.
- C38Sch. 3 para. 5 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 3 para. 5 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(c), 3(2)
- C39Sch. 3 para. 6 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 3 para. 6 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(c), 3(3)
- C40Sch. 3 para. 7 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8Sch. 3 para. 7 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)
- M541991 c. 22.
- C41Sch. 3 para. 8 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 3 para. 8 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)
- M551980 c. 66.
- C42Sch. 3 para. 9 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 3 para. 9 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)
- C43Sch. 3 para. 10 applied (with modifications) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 3 para. 10 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)
- C44Sch. 3 para. 11 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 3 para. 11 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)
- M561991 c. 22.
- C45Sch. 3 para. 12 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 3 para. 12 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)
- M571845 c. 20.
- C46Sch. 3 para. 13 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 3 para. 13 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(c)
- M581968 c. 73.
- C47Sch. 3 para. 14 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8Sch. 3 para. 14 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(c), 3(4)
- M591845 c. 18.
- M601965 c. 56.
- M611981 c. 67.
- M621981 c. 66.
- M631981 c. 67.
- M641965 c. 56.
- M651965 c. 56.
- M661965 c. 56.
- M671973 c. 26.
- M681965 c. 56.
- C48Sch. 4 para. 11 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 4 para. 11 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(d), 3(5)
- C49Sch. 4 para. 12 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 4 para. 12 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(d)
- C50Sch. 4 para. 13 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 4 para. 13 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(d), 3(5)
- M691981 c. 67.
- M701965 c. 56.
- M711981 c. 66.
- C51Sch. 4 para. 16 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 4 para. 16 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(d)
- M721981 c. 67.
- M731961 c. 33.
- M741965 c. 56.
- F25Words in Sch. 5 para. 2(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 31(a)
- F26Words in Sch. 5 para. 2(5) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 31(b)
- F27Definition in Sch. 5 para. 2(8) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 31(c)
- M751965 c. 56.
- M761981 c. 66.
- C52Sch. 5 para. 4 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8Sch. 5 para. 4 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(e), 3(5)
- M771961 c. 33.
- M781965 c. 56.
- C53Sch. 5 para. 5 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8Sch. 5 para. 5 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(e)
- M791988 c. 52.
- M801993 c. 43.
- F28Words in Sch. 6 para. 11(3) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(a)(i)
- F29Words in Sch. 6 para. 11(4) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(a)(ii)-(iv)
- M811993 c. 43.
- F30Words in Sch. 6 para. 19(3) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(b)(i)
- F31Words in Sch. 6 para. 19(4) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(b)(ii)-(iv)
- M821988 c. 52.
- F32Words in Sch. 6 para. 30 substitited (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(c)(i)
- F33Words in Sch. 6 para. 30 substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(c)(ii)
- F34Words in Sch. 6 para. 31(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(d)
- F35Words in Sch. 6 para. 32(1)(2)(3)(b)(5)(7) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(e)(i)
- F36Words in Sch. 6 para. 32(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(e)(ii)
- M831990 c. 8.
- F37Words in Sch. 6 para. 34(1)(2)(4)(6) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(f)(i)
- F38Words in Sch. 6 para. 34(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(f)(ii)-(iv)
- F39Words in Sch. 6 para. 34(6) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(f)(v)-(vii)
- F40Words in Sch. 6 para. 35 substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(g)
- F41Words in Sch. 6 para. 36(2)(4)(b) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(h)(i)
- F42Words in Sch. 6 para. 36(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(h)(ii)
- M841990 c. 8.
- F43Sch. 6 para. 38(2)(a) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 32(j)
- M851990 c. 9
- M861990 c. 9.
- M871990 c. 9.
- M881990 c. 9.
- M891979 c. 46.
- M901983 c. 47.
- M911983 c. 47.
- F44Words in Sch. 7 para. 5(4) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 33(a)
- F45Word in Sch. 7 para. 5(5) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 33(b)(i)
- F46Words in Sch. 7 para. 5(5)(a) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 33(b)(ii)
- F47Words in Sch. 7 para. 5(5)(a) substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(5)
- F48Words in Sch. 7 para. 5(5)(b) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 33(b)(iii)
- M921990 c. 9.
- M931990 c. 9.
- M941979 c. 46.
- C54Sch. 9 Pt. I para. 1 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8
- M951991 c. 22.
- C55Sch. 9 Pt. I para. 2 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8
- F49Words in Sch. 9 para. 7(2)(3) substituted (1.2.2001 subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) 2000 c. 38, s. 252, Sch. 27 para. 56(1)(2); S.I. 2001/57, art. 3, Sch. 2 Pt. I
- F50Sch. 9 para. 7(4) inserted (1.2.2001 subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) by 2000 c. 38, s. 252, Sch. 27 para. 56(1)(3); S.I. 2001/57, art. 3, Sch. 2 Pt. I
- M96S.I. 1999/1998.
- M971840 c. 97.
- M981842 c. 55.
- M991868 c. 119.
- M1001889 c. 57.
- M1011840 c. 97.
- M1021842 c. 55.
- M1031889 c. 57.
- C56Sch. 9 (except paras. 1(3)(c), 8(2)(a)(b)) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(f), 5
- M1041933 c. xliv.
- M1051939 c. xcvii.
- M1061949 c. 74.
- C57Sch. 10 para. 5 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8
- M1071970 c. lxxvi.
- M1081980 c. 66.
- M1091986 c. iv.
- F51Sch. 10 para. 6 substituted (30.1.2001) by 2000 c. 37, ss. 76(1), 103(2), Sch. 10 Pt. II para. 11
- M1101981 c. 69.
- F52Sch. 10 para. 6 and cross-heading immediately preceding it substituted (30.1.2001) by 2000 c. 37, ss. 76(1), 103(2), Sch. 10 Pt. II para. 11
- C58Sch. 10 para. 7 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8
- M1111984 c. 55.
- M1121985 c. 48.
- M1131971 c. 80.
- M1141986 c. iv.
- M1151991 c. 56.
- C59Sch. 10 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(g), 3(6)(7), 4(3)Sch. 10 applied (with modification) (12.8.2002) by S.I. 2002/1943, art. 15(1)(c)
- M1161857 c. 81.
- M1171985 c. 6.
- M1181857 c. 81.
- M1191857 c. 81.
- C60Sch. 11 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(h)
- M1201961 c. 33.
- M1211980 c. 66.
- M1221980 c. 66.
- M1231984 c. 27.
- M1241989 c. 29.
- M1251989 c. 29.
- M1261985 c. 6.
- F53Words in Sch. 14 para. 13 substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(6)
- C61Sch. 14 (except paras. 8(2)(a), 12) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(i)
- M1271991 c. 22.
- M1281991 c. 22.
- C62Sch. 15 Pt. I (paras. 1-18) applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8Sch. 15 Pt. I (paras. 1-18) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(j), 3(8)
- M1291989 c. 29.
- M1301991 c. 56.
- M1311986 c. 44.
- M1321991 c. 56.
- F54Words in Sch. 15 Pt. 2 para. 2(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 35(a)
- F55Words in Sch. 15 Pt. 2 para. 2(3) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 35(b)
- F56Sch. 15 Pt. 2 para. 2(4) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 35(c)
- F57Words in Sch. 15 Pt. 2 para. 2(4)(a) substituted (25.11.2002) by S.I. 2002/2626, art. 20, Sch. 2 para. 21(7)
- C63Sch. 15 Pt. II (paras. 1-18) applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8Sch. 15 Pt. II (paras. 1-18) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(j)Sch. 15 Pt. II applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(d)
- M1331879 c. cxcviii.
- M1341991 c. 57.
- F58Words in Sch. 15 Pt. III para. 12(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 36(a)
- F59Sch. 15 Pt. III para. 12(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 36(b)
- C64Sch. 15 Pt. III (ss. 1-12) applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8Sch. 15 Pt. III (paras. 1-12) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(j)Sch. 15 Pt. III applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(d)
- M1351990 c. 8.
- M1361991 c. 22.
- M1371991 c. 22.
- M1381990 c. 8.
- M1391991 c. 22.
- C65Sch. 15 Pt. IV (paras. 1-6) applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8Sch. 15 Pt. IV (paras. 1-6) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(j), 3(9)Sch. 15 Pt. IV applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(d)
- M1401991 c. 57.
- F60Words in Sch. 15 Pt. VI para. 11(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 37(a)
- F61Sch. 15 Pt. VI para. 11(2) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 37(b)
- C66Sch. 15 Pt. VI (paras. 1-11) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(j), 3(5)
- M1411968 c. xxxii.
- M1421991 c. 57.
- M1431968 c. xxxii.
- C67Sch. 15 Pt. VII (paras. 1-10) applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(j), 3(10)
- F62Word in s. 21(7)(b) substituted (1.4.2003) by Enterprise Act 2002 (c. 40), s. 279, Sch. 25 para. 35(2)(b); S.I. 2003/766, art. 2, Sch. (with art. 3) (as amended (20.7.2007) by S.I. 2007/1846, reg. 3(2), Sch.)
- F63S. 24 repealed (20.6.2003) by The Enterprise Act 2002 (Consequential and Supplemental Provisions) Order 2003 (S.I. 2003/1398), art. 1, Sch. para. 24(3)
- F64S. 26 repealed (20.6.2003) by The Enterprise Act 2002 (Consequential and Supplemental Provisions) Order 2003 (S.I. 2003/1398), art. 1, Sch. para. 24(3)
- F65Words in Sch. 15 Pt. 4 para. 1(1) substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 17 para. 139(2) (with Sch. 18); S.I. 2003/1900, Sch. 1.
- F66Words in Sch. 15 Pt. 4 para. 1(2) repealed (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 19(1) (with Sch. 18); S.I. 2003/1900, Sch. 1.
- F67Words in Sch. 15 Pt. 4 para. 5 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 17 para. 139(4)(a), (with Sch. 18);S.I. 2003/1900, Sch. 1
- F68Words in Sch. 15 Pt. 4 para. 5 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 17 para. 139(4)(b), (with Sch. 18); S.I. 2003/1900, Sch. 1.
- F69Words in Sch. 15 Pt. 4 para. 5 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), Sch. 17 para. 139(4)(c), (with Sch. 18; S.I. 2003/1900, Sch. 1.
- F70Words in Sch. 6 para. 6(4) substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 138 (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)
- F71Words in Sch. 6 para. 15(4) substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 138 (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)
- F72Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(a) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))
- F73Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(b) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))
- F74Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(c) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))
- F75Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(d) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))
- F76Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(e) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))
- F77Words in Sch. 15 paras. 2-4 substituted (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 17 para. 139(3)(f) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Sch. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3))
- F78Words in s. 21 substituted (5.7.2004) by Railways and Transport Safety Act 2003 (c. 20), Sch. 2 para. 22(a); S.I. 2004/827, art. 4(g)
- F79Words in s. 21 substituted (5.7.2004) by Railways and Transport Safety Act 2003 (c. 20), Sch. 2 para. 22(b); S.I. 2004/827, art. 4(g)
- F80S. 19(2) repealed (E.W.S.) (24.7.2005) by Railways Act 2005 (c. 14), s. 60(2), Sch. 13 Pt. 1 (with s. 14(4)(5), Sch. 11 para. 11(2)); S.I. 2005/1909, art. 2, Sch.
- F81S. 19(5)(6) repealed (E.W.S.) (24.7.2005) by Railways Act 2005 (c. 14), s. 60(2), Sch. 13 Pt. 1 (with s. 14(4)(5), Sch. 11 para. 11(2)); S.I. 2005/1909, art. 2, Sch.
- F82S. 22 omitted (28.11.2005) by virtue of Railways Infrastructure (Access and Management) Regulations 2005 (S.I. 2005/3049), reg. 1(1), Sch. 1 para. 6 (with reg. 4)
- F83Words in Sch. 14 para. 7(4) substituted (1.10.2006) by Natural Environment and Rural Communities Act 2006 (c. 16), s. 107, Sch. 11 para. 148; S.I. 2006/2541, art. 2 (with Sch.)
- F84Words in Sch. 6 para. 27(4) substituted (1.10.2006) by Natural Environment and Rural Communities Act 2006 (c. 16), s. 107, Sch. 11 para. 147; S.I. 2006/2541, art. 2 (with Sch.)
- C68Act restricted (E.W.S.) (22.11.2006) by Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), Sch. 16 Pt. 1 (with art. 43)
- F85S. 42A repealed (E.W.S.) (1.12.2006) by Railways Act 2005 (c. 14), s. 60(2), Sch. 13 Pt. 1 (with s. 14(4)(5), Sch. 11 para. 11(2)); S.I. 2006/2911, art. 2, Sch.
- F86Words in Sch. 4 para. 9(5) substituted (1.4.2008) by Tribunals, Courts and Enforcement Act 2007 (c. 15), s. 148, Sch. 22 para. 9; S.I. 2007/2709, art. 5(b)
- C69Ss. 31-33 excluded (22.7.2008) by Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 (c. 5), ss. 1, 6(2)
- F87S. 21A inserted (22.7.2008) by Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 (c. 5), ss. 4, 6(2)
- F88Words in s. 17(2) repealed (22.7.2008) by Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 (c. 5), ss. 2(a), 6(2)
- F89S. 17(3) repealed (22.7.2008) by Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 (c. 5), ss. 2(b), 6(2)
- F90Words in s. 21(7) repealed (22.7.2008) by Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 (c. 5), ss. 3(c), 6(2)
- F91Words in s. 21(6) repealed (22.7.2008) by Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 (c. 5), ss. 3(b), 6(2)
- F92S. 21(2)-(5) repealed (22.7.2008) by Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 (c. 5), ss. 3(a), 6(2)
- F93Words in s. 56(1) substituted (22.7.2008) by Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 (c. 5), ss. 5, 6(2)
- C70S. 50(5)(b) transfer of functions (5.3.2009) by Secretary of State for Energy and Climate Change Order 2009 (S.I. 2009/229), arts. 1(2), 4, Sch. 1(f)
- C71Sch. 14 para. 13 transfer of functions (5.3.2009) by Secretary of State for Energy and Climate Change Order 2009 (S.I. 2009/229), arts. 1(2), 4, Sch. 1(g)
- C72Sch. 15 Pt. 2 para. 2(4) transfer of functions (5.3.2009) by Secretary of State for Energy and Climate Change Order 2009 (S.I. 2009/229), art. 4, Sch. 1(h)
- F94Words in Sch. 4 para. 11(5) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(4)(a) (with Sch. 5)
- F95Words in Sch. 4 para. 11(6)-(11) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(4)(b) (with Sch. 5)
- F96Words in Sch. 4 para. 9(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(2)(a)(i) (with Sch. 5)
- F97Words in Sch. 4 para. 9(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(2)(a)(ii), (aa) (with Sch. 5)
- F98Words in Sch. 4 para. 9(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(2)(a)(ii), (bb) (with Sch. 5)
- F99Words in Sch. 4 para. 9(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(2)(b) (with Sch. 5)
- F100Words in Sch. 4 para. 9(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(2)(c) (with Sch. 5)
- F101Words in Sch. 4 para. 9(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(2)(d)(i) (with Sch. 5)
- F102Words in Sch. 4 para. 9(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(2)(d)(ii) (with Sch. 5)
- F103Words in Sch. 4 para. 9(10) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(3) (with Sch. 5)
- F104Words in Sch. 2 para. 9(8)(a) inserted (15.1.2012) by Localism Act 2011 (c. 20), s. 240(1)(l), Sch. 22 para. 43
- F105Words in heading in Sch. 15 Pt. VI substituted (2.7.2012) by The British Waterways Board (Transfer of Functions) Order 2012 (S.I. 2012/1659), art. 1(2), Sch. 3 para. 14(2) (with arts. 4-6)
- F106Words in Sch. 15 Pt. VI substituted (2.7.2012) by The British Waterways Board (Transfer of Functions) Order 2012 (S.I. 2012/1659), art. 1(2), Sch. 3 para. 14(3)(b) (with arts. 4-6)
- F107Definition of “the Board” in Sch. 15 Pt. VI para. 1(2) omitted (2.7.2012) by virtue of The British Waterways Board (Transfer of Functions) Order 2012 (S.I. 2012/1659), art. 1(2), Sch. 3 para. 14(3)(a) (with arts. 4-6)
- F108Sch. 9 para. 6 repealed (31.1.2013) by Statute Law (Repeals) Act 2013 (c. 2), s. 3(2), Sch. 1 Pt. 9 Group 3(2)
- F109Words in s. 21(7) substituted (1.4.2014) by The Enterprise and Regulatory Reform Act 2013 (Competition) (Consequential, Transitional and Saving Provisions) Order 2014 (S.I. 2014/892), art. 1(1), Sch. 1 para. 114 (with art. 3)
- F110Words in s. 21 cross-heading substituted (16.10.2015) by The Office of Rail Regulation (Change of Name) Regulations 2015 (S.I. 2015/1682), reg. 1(2), Sch. para. 4(l)(ii)
- F111Words in s. 17 substituted (16.10.2015) by The Office of Rail Regulation (Change of Name) Regulations 2015 (S.I. 2015/1682), reg. 1(2), Sch. para. 4(l)(i)
- F112Words in s. 21 substituted (16.10.2015) by The Office of Rail Regulation (Change of Name) Regulations 2015 (S.I. 2015/1682), reg. 1(2), Sch. para. 4(l)(iii)
- F113Words in s. 21A substituted (16.10.2015) by The Office of Rail Regulation (Change of Name) Regulations 2015 (S.I. 2015/1682), reg. 1(2), Sch. para. 4(l)(iv)
- F114Words in Sch. 4 para. 12(1) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(5) (with Sch. 5)
- F115Words in Sch. 4 para. 12(2) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 262(5) (with Sch. 5)
- F116Sch. 15 Pt. IV heading substituted (28.12.2017) by Digital Economy Act 2017 (c. 30), s. 118(6), Sch. 3 para. 38(2); S.I. 2017/1286, reg. 2(d)
- F117Words in Sch. 15 Pt. IV para. 4(1) substituted (28.12.2017) by Digital Economy Act 2017 (c. 30), s. 118(6), Sch. 3 para. 38(6); S.I. 2017/1286, reg. 2(d)
- F118Words in Sch. 15 Pt. IV para. 3 substituted (28.12.2017) by Digital Economy Act 2017 (c. 30), s. 118(6), Sch. 3 para. 38(5); S.I. 2017/1286, reg. 2(d)
- F119Words in Sch. 15 Pt. IV para. 2(2) substituted (28.12.2017) by Digital Economy Act 2017 (c. 30), s. 118(6), Sch. 3 para. 38(4); S.I. 2017/1286, reg. 2(d)
- F120Words in Sch. 15 Pt. IV para. 2(1) substituted (28.12.2017) by Digital Economy Act 2017 (c. 30), s. 118(6), Sch. 3 para. 38(3); S.I. 2017/1286, reg. 2(d)
- F121Words in Sch. 3 para. 2(11) substituted (E.W.) (31.1.2017 for specified purposes, 1.4.2018 in so far as not already in force) by Policing and Crime Act 2017 (c. 3), s. 183(1)(5)(e), Sch. 2 para. 102; S.I. 2018/227, reg. 4(c)
- C73S. 50(4): functions transferred (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), arts. 1(2), 7(1) (with art. 17)
- C74Sch. 14: functions transferred (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), arts. 1(2), 7(1) (with art. 17)
- C75Sch. 15 Pt. 2 para. 2: functions transferred (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), arts. 1(2), 7(1) (with art. 17)
- C76Sch. 7 para. 5(4): functions transferred (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), arts. 1(2), 13(2) (with art. 17)
- F122Words in s. 50(5)(b) substituted (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), art. 1(2), Sch. para. 8(2) (with art. 17)
- F123Words in Sch. 7 para. 5(5)(a) substituted (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), art. 1(2), Sch. para. 8(3) (with art. 17)
- F124Words in Sch. 14 para. 13 substituted (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), art. 1(2), Sch. para. 8(4) (with art. 17)
- F125Words in Sch. 15 Pt. 2 para. 2(4)(a) substituted (3.5.2023) by The Secretaries of State for Energy Security and Net Zero, for Science, Innovation and Technology, for Business and Trade, and for Culture, Media and Sport and the Transfer of Functions (National Security and Investment Act 2021 etc) Order 2023 (S.I. 2023/424), art. 1(2), Sch. para. 8(5) (with art. 17)
- C77Act excluded (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 55(1) (with arts. 5, 43, 53(7), Sch. 14)
- F126S. 42 omitted (18.2.2026) by virtue of Planning and Infrastructure Act 2025 (c. 34), ss. 37(2)(c), 118(1)(v) (with ss. 37(3), 116)